My WebLink
|
Help
|
About
|
Sign Out
Home
2010-10-22 Cost of Government Commission Minutes
PublicDocuments
>
Office of the Mayor
>
Cost of Government Commission
>
Minutes
>
2010
>
2010-10-22 Cost of Government Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2011 1:09:22 PM
Creation date
6/21/2011 1:09:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MS. CRAWFORD: <br /> We are happy to spend as much time as you want on any of this, <br />but we didn’t want to take up too long a time just with presentation, and so we tried to <br />move through some pretty complex material very quickly. One last thing, I just wanted <br />to mention is some of the things that we’ve already implemented to try and improve <br />efficiency or save on costs within say the last couple of years, and that is like the <br />construction bids and plans. So that’s like large plan documents and everything is now <br />placed on cd’s and goes to the contractors in that form. So that replaced a lot of paper <br />and the need even for deposits. So we’ve simplified that process. Under Procurement <br />for Goods and Services, we’ve taken about 98% of the documents that used to be <br />mailed out are now all sent electronically through email. Included in that is the Small <br />Purchase quotes which are basically 100% emailed out and the responses come back <br />in, it would an email or fax. And it’s just the small purchase under $25,000 that we’re <br />still getting written quotations and it’s all being emailed out. All of the Notices for Goods <br />and Services or construction contracts are posted on the state’s procurement notice site <br />as opposed to newspaper advertising which we used to have. Long ago it was always <br />in the Sunday paper, and then to cut costs we went to non-Sundays and now with the <br />exception of some grant funded, Housing. And if they fall under certain federal <br />regulations, they may still require posting in newspapers of general circulation. But the <br />majority of what the county does, does not require that and so it’s done strictly on the <br />website. That’s saving a lot of advertising costs. Beyond that I guess I would just say <br />that we, I mean one thing, I’ll just mention it’s not a direct cost cutting effort, but we put <br />effort in up front in the form of what Gilbert and Craig have talked about and the review <br />of contracts through the process and requirements for documentation that ultimately we <br />feel have resulted in this county in having very few procurement protests which are <br />costly in time and energy for everyone. It can hold up a project or purchase of <br />something, and we feel that investment in carefully getting information out to everybody, <br />being very clear about what we need and want, and documenting what we’ve done <br />helps protect the county in that way from those additional costs. And finally there are <br />some other electronic procurement type activities that are under consideration but we’ve <br />not taken much steps. So, with that I thank you and if there’s anything to add or we <br />skipped over, we would welcome questions. <br />MS. NICHOLSON: <br /> I’m sure we have some questions from some of our commission <br />members, so anyone want to jump in and go first? <br />MS. WONG: <br /> I’d just like a clarification of one of the terms that you used. I’m not clear <br />of what that means. Procurement protest? Do you get protest for procurements? <br />MR. MASUDA: <br /> What happens is for every procurement that’s sent out, any bidder, <br />who is any person who submitted a bid and didn’t get selected, can file a protest. What <br />the protest says is the way the specs came out wasn’t fair. It was geared too much <br />towards my competitor, not toward me. Or the way you did the evaluation and you <br />picked somebody else over me was somehow not fair or whatever. As soon as they file <br />a protest, what’s built into the law is what’s called an automatic stay. So once he filed a <br />protest, once Nancy receives, as a chief procurement officer, once she receives the <br />protest, everything stops until the issue is resolved, or until there is a determination <br />made that in the best interest of the government that the purchasing go through. But <br />even that can, even in itself whether you try to do the override so to speak of the <br />7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.