Laserfiche WebLink
would need six full -time engineers to handle these projects, with an average salary of <br />$70,000 each. This would save the County about $1.3 million per year in consultant fees. <br />• Additional engineering staff would also allow in -house construction <br />management of various projects. They currently have one contract, totaling about <br />$275,000. This equates to two engineers, with each one handling an average of two <br />construction projects per year. It is anticipated that additional construction management <br />services will be required for future projects related to the large- capacity cesspool <br />compliance, as well as other projects. <br />• Establishment of a Grants Manager position to pursue government grants would <br />help to fund the CIP projects. A Grants Manager would also be able to research and <br />pursue more grants, thus relieving the staff engineers who are currently tasked with <br />pursuing and managing these grant funds. At the present time, CIP's are funded through <br />bonds or revolving fund loans. Grants would be free. She explained that her section <br />oversees the federal grants and Brownfields Assessment grants. A dedicated grants <br />person would be able to handle those grants, as well as pursue any other grants that may <br />be appropriate for a project. This would relieve the engineers and allow them to <br />concentrate on the more immediate projects. <br />2. Do you see any way to consolidate services, activities and functions of a <br />similar nature within your own department as well as with other <br />departments? <br />• The sewer billing is something that could be consolidated with the Department <br />of Water Supply's billing, as is done on Oahu and Maui. This would save about $25,000 <br />per year in postage and direct supplies alone. Additional savings would be in labor costs. <br />Combining the billing would improve collections, as would disconnecting water for non- <br />payment. The degree to which collections would improve is unknown. To combine the <br />billing would require the same billing practices, payment terms, and consequences for <br />both the Water Supply Department and Wastewater Division, and this would require the <br />approval of the Water Board as well as significant changes to the October 1, 2005, <br />ordinance. There are also complexities due to DWS and Wastewater not necessarily <br />billing the same customer, so until common practices can be established, separate billings <br />may be the most practical. <br />• See if the various payroll forms could be consolidated into one form. Currently <br />there are different forms for leaves of absence, temporary assignment, overtime, etc. <br />There is duplication of information. <br />• The establishment of a two -week lag in payroll would significantly reduce the <br />time spent by account clerks on correcting timesheets after they have already been <br />submitted. The current system requires employees to predict their hours, since the <br />timesheet is due the day the paycheck is issued. As a result, account clerks spend a lot of <br />their time going back and figuring out what hours employees really worked. <br />3. Are there any services, activities, and functions not necessary to the efficient <br />conduct of government that could be eliminated? <br />