<br />With the $100k allotment from the Mayor, the survey and prelimin <br />will be done for Komohana Heights. When the preliminary engineer <br />it will be submitted to council. <br /> <br />Awaiting bond float approval to begin Queen LiliÓuokalani sewer extension. <br />PUA PUMP STATION ODOR CONTROL: <br />Chemicals to be used in test include Caustic (sodium hydroxide), Sodium Nitrate, Ferric <br />Chloride and ÐProsweetÑ. <br /> <br />Total test period is approximately 12 weeks, beginning in mid-April with expected <br />completion in Mid-July. When the recommendation is received, the design process will <br />begin. <br /> <br />In the interim, a special load of carbon has been ordered for the carbon scrubbers. <br />SEWER CODE REVISIONS: <br /> <br />The proposed bill (attached to original minutes) being submitted to council changes billing <br />responsibility to the property owner. It also adds an interest charge for outstanding balances <br />on unpaid bills and authorizes Departments of Public Works, Environmental Management <br />and Water Supply to make appropriate rules to shut off water in the event of non-payment of <br />sewer bills. <br /> <br />By making the owner responsible for the charges, the bill automatically becomes a lien on <br />the property. <br /> <br />Witcher made a motion to support the proposed bill and Kawamura seconded the <br />motion. It passed unanimously. <br />KALANIANA`OLE INTERCEPTOR SEWER REHAB: <br /> <br />Contingency plan is completed and the by-pass piping has been delivered. <br /> <br />An assessment shows the sewer line to be solid with no leaks although it is deteriorated. <br /> <br />The consulting firm of Brown and Caldwell has been selected for <br /> <br />A power point presentation was shown summarizing what caused the corrosion; what has <br />been done so far; the project goals, challenges/ problems; and the rehab options. <br /> <br />The consultant contract also includes a community outreach prog <br /> <br />Estimated Schedule: <br />April, 2003:Begin project <br />o <br />June, 2003:Receive final engineering report <br />o <br />September, 2003:Put out bid <br />o <br />December, 2003:Begin construction <br />o <br />April, 2004:Project completion <br />o <br /> <br />There are various ways to fund this capital improvement project. <br />Solid Waste Division ChiefÓs Report <br /> (attached to original minutes) <br />HILO LANDFILL: <br /> <br />No changes on estimated life span. Another analysis will be done <br />SOLID WASTE DIVISION STAFFING: <br /> <br />New temporary attendant started mid-March; another is scheduled to start first of April. <br />-3- <br /> <br />