My WebLink
|
Help
|
About
|
Sign Out
Home
2011-01-AU Limited Scope Performance Audit of the Department of Parks and Recreation’s Facilities Asset Management
PublicDocuments
>
Legislative Auditor
>
Audit Reports
>
County Auditor Reports
>
2011-01-AU Limited Scope Performance Audit of the Department of Parks and Recreation’s Facilities Asset Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2011 10:32:18 AM
Creation date
7/22/2011 10:13:33 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 3: OPERATIONS <br /> The Department has not formally delineated its maintenance and repair [M&R] functions from its <br /> construction functions, or what activities fall within each of these categories, such as routine <br /> custodial, routine preventative, and critical preventative M&R activities as opposed to <br /> construction activities for facility improvement or rehabilitation. It is critical that these activities <br /> be formally defined and delineated so that plans to carry them out can be developed; <br /> responsibility for their performance can be assigned; relevant performance measures can be <br /> implemented; and communication and information processes for ranking, assigning, tracking, <br /> and reporting on activities can be put in place. The Department cannot perform critical periodic <br /> or preventative maintenance (such as roof sealing or painting) in a timely manner until it has <br /> defined "critical periodic maintenance" and delineated what activities need to be performed at <br /> what frequency. <br /> For example, there is no formal policy that provides that metal roofs with an estimated 30-year <br /> life be painted at regular intervals to maintain or extend their useful lives, or that tennis courts <br /> with clay surfaces be resurfaced at regular intervals to maintain or extend their useful lives <br /> based on industry standards. There is also no formal policy requiring that resources first be <br /> allocated to maintaining existing assets at current service levels, and second to addressing the <br /> backlog of deferred maintenance, or vice versa. The Department acknowledges that its <br /> inventory of assets is aging and continually deferred maintenance and repair has only <br /> exacerbated the deterioration of its recreational facilities. <br /> We interviewed the Parks Maintenance Superintendent to obtain background information on the <br /> Division's maintenance and repair processes. Information provided by the Division included <br /> personnel safety training, and documentation provided by the Division included safety and <br /> maintenance checklists (routine or custodial), work order and work report forms, vandalism <br /> report forms, and complaint report forms. However, no written policies or instructions for critical <br /> periodic maintenance inspections and activities were provided. <br /> WORK ORDER SYSTEM NEEDS TO INCLUDE <br /> FOLLOW-UP PROCEDURES <br /> Department personnel utilize Maintenance Work Requests to request and document non-routine <br /> or non-custodial maintenance or repairs. This work order process is initiated when any Parks <br /> and Recreation employee discovers or is informed of a maintenance or repair problem, and <br /> completes a Maintenance Work Request to report the problem and request corrective action <br /> (noting the severity of the problem). The completed Maintenance Work Request is routed to <br /> Parks Maintenance Division clerks, who input the information into an Access Database. A copy <br /> of the Maintenance Work Request is routed to the Parks Maintenance Superintendent, who then <br /> distributes it to the appropriate work unit for corrective action. If the problem is one that the <br /> Parks Maintenance Division can correct, the work is scheduled, and when work is completed, <br /> information from the Maintenance Work Request is inputted and stored in the Parks <br /> Maintenance Division's Access Database. <br /> If the Parks Maintenance Division determines that its workmen are unable to complete a work <br /> order, a Work Order Denial Justification Form is completed and returned to the Parks <br /> Maintenance Superintendent. The Superintendent then closes the work order in the Parks <br /> Maintenance Division's Access Database, and routes the Maintenance Work Request and Work <br /> Order Denial Justification Form to the Park Planning Division to be addressed through the CIP <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.