Laserfiche WebLink
Chapter 3: OPERATIONS <br /> THE HISTORICAL LACK OF MAINTENANCE AND REPAIR HAS <br /> RESULTED IN SOME FACILITIES THAT <br /> CANNOT BE FULLY UTILIZED BY THE PUBLIC <br /> Deteriorating recreational facilities cannot be fully utilized by the public. Various <br /> Recreation Directors also reported that games and community events needed to be cancelled or <br /> stopped midway due to roof leaks in gyms. Buildings or building sections have also been <br /> closed due to the presence of hazardous materials, leaving communities without adequate <br /> recreational facilities at which to meet and play. The Auditors were also provided with <br /> documented complaints from the coordinator of an event held in November 2010, indicating that <br /> the event and its exhibitors were negatively impacted by the leaking facilities at the Edith <br /> Kanaka'ole Multi-Purpose Stadium. The Auditors observed roof repair work being conducted in <br /> March 2011. <br /> DETERIORATING FACILITIES ARE AN ONGOING PROBLEM <br /> During our site visits and review of departmental reports, the Auditors noted that many <br /> recreational facilities have rusted and/or leaking roofs and gutters, wood rot, and termite <br /> damage. It should be noted that the sites observed by the auditors were based on a judgmental <br /> sample to ensure observation of at least one facility in each district, and that a judgmental <br /> sample is not statistically based and the results should not be extrapolated over the population <br /> as the sample may not be representative of the population. Leaking roofs were observed or <br /> reported at 11 of the 16 recreational sites visited, and outstanding maintenance and repair work <br /> was observed or reported at 15 of the 16 sites visited. Various facility staff reported a backlog <br /> of maintenance and repair that has been deferred for years. <br /> While the Department informed the Auditors that it had not completed aCounty-wide facilities <br /> condition assessment inclusive of estimated repair costs, the Department reported to the <br /> Council in May of 2008 that it estimated remediation of the then existing deferred maintenance <br /> and repair backlog at approximately $80 million dollars based on a list of repairs and estimated <br /> expenses completed in about 2004. (See, Appendix E). When the Auditors requested the list of <br /> facility repairs and estimated costs that were used to provide the Council with this rehabilitation <br /> estimate, the Park Planner responded: <br /> "The Planning Section of the Department originally prepared a list <br /> of maintenance needs at each park site with corresponding <br /> estimates in 2003 in order to quickly illustrate the condition and <br /> status of the department's inventory and determine what the <br /> overall deferred maintenance picture looked like for the <br /> Department. That list was prepared based on cursory site visits, <br /> with limited input of site staff, using basic cost estimating <br /> procedures, etc. and therefore should not be considered <br /> comprehensive in terms of an audit. Moreover, that list was not <br /> maintained and no new spreadsheet prepared that could provide a <br /> more realistic or accurate picture of the current state of the <br /> department's major maintenance needs." <br /> Review of the spreadsheet (Appendix E) further exemplifies the need for a process to assess <br /> and prioritize capital projects, and additionally ensure that funding allotments are directed to <br /> those projects deemed the highest priority. For example, the listed repairs to the leaking roofs <br /> of Yano Hall, Gilbert Carvalho Park Gym, and Honomu Gym have still not been completed. <br /> 26 <br />