My WebLink
|
Help
|
About
|
Sign Out
Home
2009-09-22 Water Board Public Hearing Minutes
PublicDocuments
>
Water Supply, Department of
>
Water Board
>
Minutes
>
2006 - 2010
>
2009
>
2009-09-22 Water Board Public Hearing Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2011 12:06:52 PM
Creation date
7/28/2011 12:06:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACTION TO MOVE AGENDA ITEMS:?? <br /> ??Chairperson Smith noted a request to move Item 8 (A), INTRODUCTION OF STATE <br /> PIPE TAPPING TEAM CHAMPIONS OF 2009 to the top of the Agenda, ahead of Item 5 <br /> (A), Job No. 2007-043, CONSTRUCTION OF THE WAIKOLOA RESERVOIR NO. 2 <br /> EARTHQUAKE REPAIRS, COUNTY OF HAWAII, STATE OF HAWAII, FEMA-1644- <br /> DR-HI, FIPS NO. 00 1-UVKJ8-00, PW NO. 638. <br /> The Board approved the changes in sequence, by consensus. <br /> SOUTH KOHALA: <br /> A. JOB NO. 2007-043, CONSTRUCTION OF THE WAIKOLOA RESERVOIR NO. 2 <br /> EARTHQUAKE REPAIRS, COUNTY OF HAWAI`i, STATE OF HAWAII, FEMA- <br /> 1644-DR-HI, FIPS NO. 001-UVKJ8-00, PW NO. 638: <br /> The contractor, Goodfellow Bros., Inc., has requested an 82-calendar day time extension. This <br /> request is due to delays beyond the control of the contractor, and consists of 72 calendar days <br /> for rain-outs and unworkable conditions, and 10 calendar days for investigating the pending <br /> closure of the DuPont Hypalon CSM polymer manufacturing plant. <br /> Burke Industries, the supplier of the Hypalon liner to be used for this project, was required to <br /> delay the shop drawing submittal while looking for an adequate alternate source of Hypalon <br /> CSM polymer. An alternate source was located, but Burke Industries issued another letter <br /> saying DuPont will manufacture enough CSM polymer to meet most, if not all, of the 2009 <br /> demand. <br /> Note: There is no additional cost associated with this time extension. <br /> Staff has reviewed the request and finds that the 82 calendar days are justified. This is the first <br /> time extension request. <br /> 1st time extension—82 calendar days <br /> The Manager recommended that the Board approve a contract time extension to Goodfellow <br /> Bros., Inc. of 82 calendar days for JOB NO. 2007-043, CONSTRUCTION OF THE <br /> WAIKOLOA RESERVOIR NO. 2 EARTHQUAKE REPAIRS, COUNTY OF HAWAII, <br /> STATE OF HAWAII, FEMA-1644-DR-HI, FIPS NO. 001-UVKJ8-00, PW NO. 638. If so <br /> approved, the contract completion date will be revised from November 9, 2009 to <br /> January 30, 2010. <br /> NORTH KONA: <br /> A. NO. 2004-839, KEOPU-PU`UHONUA PRODUCTION WELL AND 1.0 MG <br /> RESERVOIR: <br /> The contractor, Isemoto Contracting Co., Ltd., requests a 74-calendar day time extension. <br /> This request is due to additional work requested by the Department for off-site waterline work <br /> needed to allow water from this project to feed into the Department's existing distribution <br /> system. <br /> Page 4 of 9 Water Board Minutes-5-25-09 j <br />
The URL can be used to link to this page
Your browser does not support the video tag.