Laserfiche WebLink
Chapter 2:Mitigation Planning <br /> On an importance scale of H(high),M(medium),or L(low),which of these hazards are <br /> the most important for your personal planning/preparation? <br /> 250- <br /> zoo <br /> 150 <br /> �H <br /> 100 MM <br /> ML <br /> 50 <br /> 0 <br /> � a T <br /> A <br /> 0 @ 0 O. <br /> N <br /> Was the risk of any of these hazards a factor when you selected the location of your home or <br /> place of employment?(Can enter multiple selections) <br /> 100 <br /> 464%(83) <br /> so <br /> 40.2:(72) <br /> 37-4%(58) <br /> 33.5%(60) <br /> 60 - - <br /> 3.5 5a(42) <br /> 40 _ - 21.2%(38) <br /> 17.3%(31) <br /> 11-2%(20) <br /> 134%(24) / <br /> 11.2%(20) <br /> d/ <br /> 0 <br /> $ <br /> m s <br /> m 3 a3. 3 <br /> 3'a 3 <br /> b <br /> m <br /> 2-14 Hawaii County Multi-Hazard Mitigation Plan <br />