My WebLink
|
Help
|
About
|
Sign Out
Home
Multi-Hazard Mitigation Plan: 17. Shelters
PublicDocuments
>
Civil Defense
>
Multi-Hazard Mitigation Plan 2010
>
Multi-Hazard Mitigation Plan: 17. Shelters
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2011 7:59:24 AM
Creation date
8/11/2011 7:57:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 17:Shelters <br /> 17.1.1.2 Waikoloa Elementary School- Classroom Building D <br /> i <br /> i <br /> SaffiL-Sim�srr�SLRaLrn Calu-�uli�s a�ld Sh�ltu� Classes <br /> F n'colc vu-•nm <br /> ',•ncax and 6ocr <br /> � � m <br /> Category 1 <br /> Category C#te -0 Ca#egory 4 0 <br /> CUnefR Str u <br /> o UMI capaolty Pussibla Partial) Enclosed'- vaoaci 82 a2 142 112 22 132 142 162 162 972 182 15? <br /> 3Scuond Perak Gust VVindspccd Strength Capacity <br /> Classroom Building D in its current condition complies with the strength capacity wind load <br /> requirements of a Type B hurricane shelter, and although unrated openings and impact <br /> protection exist it can safely be assumed that the existing openings and protection devices <br /> meet the wind load requirements for this shelter type and the required missile impact level A. <br /> However, some structural deficiencies were noticed during the inspection. The items listed <br /> below require attention to assure compliance: <br /> • Although the structural analysis determined that the uplift capacity of the hip girder <br /> truss just meets the requirements of a Type B shelter, the missing uplift connector is <br /> considered a structural flaw and should be retrofitted. This can be accomplished by <br /> installing uplift connectors per Figure 13, or equivalent method(minimum capacity of <br /> 1000 lbs. each), at the top and bottom chords of each hip-girder truss to setback- <br /> girder at each truss connection. <br /> • Install remedial uplift connectors at the hip truss connections to the setback girders, <br /> anywhere improper installation is noticed. Provide the missing fasteners at all other <br /> improperly installed connectors,particularly at the hip truss connections to the bottom <br /> 17-10 Hawaii County Multi-Hazard Mitigation Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.