My WebLink
|
Help
|
About
|
Sign Out
Home
Multi-Hazard Mitigation Plan: 18. Risk Assessment
PublicDocuments
>
Civil Defense
>
Multi-Hazard Mitigation Plan 2010
>
Multi-Hazard Mitigation Plan: 18. Risk Assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2011 8:04:16 AM
Creation date
8/11/2011 8:02:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 18:Risk Assessment <br /> 18.1.11 Energy Systems <br /> 18.1.11.1 Electrical/Feel <br /> The Hawaii Electric Light Company, Inc. (HELCO) operates the electrical system on this is- <br /> land. The electrical system consists of power generating plants, substations, and transmission <br /> lines (see Figure 18-14). HELCO power plants are located at Keahole,North Kona, Waimea, <br /> South Kohala, Waiakea Peninsula and Kanoclehua, South Hilo, and Keaau, Puna. Generating <br /> plants rely on petroleum to produce 75% of the power, with the balance generated from <br /> renewable sources such as geothermal, hydroelectric, and wind. Should the supply of <br /> petroleum become a problem, HELCO has fuel storage to generate power from oil for an <br /> average 30 days, per a PUC requirement. The fuel tanks are at the Hilo base and located out <br /> of flood,tsunami, and lava hazard zones. All major transmission lines are overhead. <br /> 18-31 Hawaii County Multi-Hazard Mitigation Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.