Laserfiche WebLink
REPORT OF CHANGE ORDERS AUTHORIZED <br /> Legend: <br /> CO Change Order FOR THE PERIOD OF:4/16/11.4/30/11 <br /> SA Supplemental Agreement <br /> PS Professlonal Services <br /> C Construction <br /> PTA Price Term Agreement <br /> GS Other Goads&Services <br /> Original Original %or Commutative /.or <br /> Execution lob Contract Protect Contract Dept. Contract Contract CO/SA CO/SA ON CO/sA prig Contractor Protect Protect Purpose <br /> Dale # # Title Type .Amount Date No. Amount Coal Total Coat Manager Status <br /> Kona Chocolate Naalehu Stephanie Extension of time by 6 months and <br /> 4120/2011 NIA C.003029 Festival GS R&D $4,000.00 1127/2011 1 $3,600.00 75.00% $3,000.00 75.60%Theatre Denche Open additional funding to promote new <br /> event date. <br /> Ben dhll Adjustments to quantities based on <br /> 412D/2011 E-3987 C.002899 Halt Street Connector C DPW 5225,180.06 8/212010 1 -$13.505.01 -5.D0% -$13.505.01 -5.D0%Bolton Inc. Engineering Open actual field measurements. <br /> Dlvislan <br /> To provide a chassis with locking <br /> Freedom Fire Steve <br /> To capabllltles whlch was not <br /> 4120/2011 IFB-2656 C.002992 Fire Water Tanker GS Fire 5218,58200 1113/2911 1 $2.500.00 1.14% $2,500.00 1.14%Equipment Wilhelm Open originally specified,but required for <br /> vehicle application.Price still lower <br /> than second bidder. <br /> 4125/2011 N/A C.002612 Promotional Campaign GS R&D $15,069.90 11/2312609 2 $0.00 0.00% 50. 6.00/Hawaii Dept.of Dayday Open Tlm <br /> A rlctlture Hopkins e extension through 12131111 <br /> To extend exlsting contract by a <br /> period of up to 180 days(tram 511111 <br /> to 10/31111)In sccomancewlih HAR <br /> 4129/2011 RFP-2482 C092279 Operating Recycling GS DELI 5283,673.00 412912009 2 $132.586.50 46.74% $397,759.50 140.22%Recycle Hawall Steve Open §3-1223 while new specifications <br /> and Reuse Centers Wilhelm continue to be completed for new bid <br /> proposal.The cumulative total <br /> Includes 1 option year casts and 180 <br /> day extension cost. <br /> Total#of Total Original Contract Total C0/SA <br /> Contracts 5 Amount $746,435.06 for Period 5 <br /> Total JIM $124,591.49 <br /> Amount"fur Period <br />