Laserfiche WebLink
there and looked at this road, and we had water truck haulers bring two 6,000-gallon trucks side-by-side up <br />that road, and park. And as Milton recognized, that this was not a safe road for two water trucks to pass <br />each other, as which was designed, originally designed, to have two water trucks pass each other. But it’s <br />not capable of doing that. And so, it’s now a one-lane, one-way road for water haulers, so that a water <br />truck that’s 350 feet up at the standpipe, as it is exiting, has to now proceed with possibly water trucks on <br />the road on Lehua Lane, and if there’s 15 trucks servicing the area, there’s a possibility of congestion on <br />the highway… which is a 55-miles-per-hour road. So we… by not having a two-lane road with a long <br />entrance road into that filling site, we’re actually opening up other problems out on the highway and our <br />lane. So I think that has to still be addressed. The turn area on the bottleneck that we had… Milton <br />addressed that issue with Bolton, and the extended that area, making it wider. There was an obvious <br />bottleneck; it was not going to work the way it was, and so they agreed to widen that area at a cost of <br />$20,000.00… I’m not sure what they came up with, Milton, but somewhere around there. But that issue <br />still needs to be addressed as to whose taxpayers, I feel, should really be paying for, you know, design <br />flaws that were… gravel that had been sold by the contractor to the public, and that gravel could actually <br />have been used to expand that area. So that needs to be addressed. We also have… the final issue, I guess, <br />that needs to be presented here is just that the water pressure on the site may not be adequate to fill the <br />trucks in a timely fashion. It’s my understanding at this meeting that the water flow rate is considerably <br />less than Nā‘ālehu. And maybe we can address certain issues, that we can get that flow rate higher… I <br />think it’s like 150 to 175 gallons per minute, where on a 2-inch pipe in Nā‘ālehu… somewhere around <br />250. So it’s gonna take longer to fill the trucks, and so, what we have is… if you’re a resident in Kona, <br />and you have water piped to your house, you can get 30,000 gallons for about $135.00. In Ocean View, it <br />will cost you seven times that amount. It’s gonna cost $945.00 or so just to get 30,000 gallons. You <br />know, we pay more for water… considerably more for water. And what we’d like… what we were hoping <br />for, was to pay less… that the water trucks are gonna go down there, fill up and get back into the <br />community so that we could, you know, cut our costs we’re paying… It’s a horrendous amount of money <br />to have water. So because of the difficulties, these concerns, that… Some of them have been addressed, <br />others haven’t. We’re still paying a very high amount of money for water. So… But other than that, we <br />want the Department of Water Supply… I talked to several people… We feel very good about having <br />them manage our site. I think that some of Milton’s engineers have maybe not come through as well as he <br />had hoped for… and to maybe work with some of the… with the contractor… and some of these concerns <br />fell by the wayside. I think we have total confidence in the County to do a good job here. So, anyway, <br />thank you for your time. <br /> <br />(Mr. Dubois left the meeting at 10:11 a.m.) (Mr. Kim left at 10:13 a.m.) <br /> <br />3) APPROVAL OF MINUTES <br /> <br />The Chairperson entertained a Motion to approve the Minutes of the August 23, 2011, Public Hearing on <br />the Power Cost Charge. <br /> <br />ACTION: Mr. Meierdiercks moved to approve; seconded by Mr. Taniguchi, and carried unanimously by <br />voice vote. <br /> <br />The Chairperson entertained a Motion to approve the Minutes of the August 23, 2011, Water Board <br />meeting. <br /> <br />ACTION: Mr. Meierdiercks moved to approve; seconded by Mr. Lindsey, and carried unanimously by <br />voice vote. <br /> <br />The Chairperson entertained a Motion to approve the Minutes of the September 15, 2011, Special Meeting <br />on the Selection of the new Manager-Chief Engineer. <br /> <br />Page 3 of 29 9-27-11 ~ Water Board Minutes js <br /> <br /> <br />