there and looked at this road, and we had water truck haulers bring two 6,000-gallon trucks side-by-side up
<br />that road, and park. And as Milton recognized, that this was not a safe road for two water trucks to pass
<br />each other, as which was designed, originally designed, to have two water trucks pass each other. But it’s
<br />not capable of doing that. And so, it’s now a one-lane, one-way road for water haulers, so that a water
<br />truck that’s 350 feet up at the standpipe, as it is exiting, has to now proceed with possibly water trucks on
<br />the road on Lehua Lane, and if there’s 15 trucks servicing the area, there’s a possibility of congestion on
<br />the highway… which is a 55-miles-per-hour road. So we… by not having a two-lane road with a long
<br />entrance road into that filling site, we’re actually opening up other problems out on the highway and our
<br />lane. So I think that has to still be addressed. The turn area on the bottleneck that we had… Milton
<br />addressed that issue with Bolton, and the extended that area, making it wider. There was an obvious
<br />bottleneck; it was not going to work the way it was, and so they agreed to widen that area at a cost of
<br />$20,000.00… I’m not sure what they came up with, Milton, but somewhere around there. But that issue
<br />still needs to be addressed as to whose taxpayers, I feel, should really be paying for, you know, design
<br />flaws that were… gravel that had been sold by the contractor to the public, and that gravel could actually
<br />have been used to expand that area. So that needs to be addressed. We also have… the final issue, I guess,
<br />that needs to be presented here is just that the water pressure on the site may not be adequate to fill the
<br />trucks in a timely fashion. It’s my understanding at this meeting that the water flow rate is considerably
<br />less than Nā‘ālehu. And maybe we can address certain issues, that we can get that flow rate higher… I
<br />think it’s like 150 to 175 gallons per minute, where on a 2-inch pipe in Nā‘ālehu… somewhere around
<br />250. So it’s gonna take longer to fill the trucks, and so, what we have is… if you’re a resident in Kona,
<br />and you have water piped to your house, you can get 30,000 gallons for about $135.00. In Ocean View, it
<br />will cost you seven times that amount. It’s gonna cost $945.00 or so just to get 30,000 gallons. You
<br />know, we pay more for water… considerably more for water. And what we’d like… what we were hoping
<br />for, was to pay less… that the water trucks are gonna go down there, fill up and get back into the
<br />community so that we could, you know, cut our costs we’re paying… It’s a horrendous amount of money
<br />to have water. So because of the difficulties, these concerns, that… Some of them have been addressed,
<br />others haven’t. We’re still paying a very high amount of money for water. So… But other than that, we
<br />want the Department of Water Supply… I talked to several people… We feel very good about having
<br />them manage our site. I think that some of Milton’s engineers have maybe not come through as well as he
<br />had hoped for… and to maybe work with some of the… with the contractor… and some of these concerns
<br />fell by the wayside. I think we have total confidence in the County to do a good job here. So, anyway,
<br />thank you for your time.
<br />
<br />(Mr. Dubois left the meeting at 10:11 a.m.) (Mr. Kim left at 10:13 a.m.)
<br />
<br />3) APPROVAL OF MINUTES
<br />
<br />The Chairperson entertained a Motion to approve the Minutes of the August 23, 2011, Public Hearing on
<br />the Power Cost Charge.
<br />
<br />ACTION: Mr. Meierdiercks moved to approve; seconded by Mr. Taniguchi, and carried unanimously by
<br />voice vote.
<br />
<br />The Chairperson entertained a Motion to approve the Minutes of the August 23, 2011, Water Board
<br />meeting.
<br />
<br />ACTION: Mr. Meierdiercks moved to approve; seconded by Mr. Lindsey, and carried unanimously by
<br />voice vote.
<br />
<br />The Chairperson entertained a Motion to approve the Minutes of the September 15, 2011, Special Meeting
<br />on the Selection of the new Manager-Chief Engineer.
<br />
<br />Page 3 of 29 9-27-11 ~ Water Board Minutes js
<br />
<br />
<br />
|