My WebLink
|
Help
|
About
|
Sign Out
Home
EDH 2025 Progress Report_Jan 09-Dec 10
PublicDocuments
>
Planning Department
>
EnVision Downtown Hilo Documents
>
Progress Reports
>
EDH 2025 Progress Report_Jan 09-Dec 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2011 9:24:42 AM
Creation date
10/24/2011 2:51:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Vision Focus Area 6 - Managing Growth <br />Total Actions: 21 <br />Initiated Actions J6_ <br />I_ <br />Completed Actions <br />New Actions 11, <br />0 2 4 6 8 10 12 <br />New Strategies and Actions: <br />Action 6.11 Develop a master plan to include traffic circulation, parking, and pedestrian <br />streetscapes <br />Action 6.14 Improve multi -modal and pedestrian access on designated streets in <br />Downtown <br />Action 6.15 Identify streets for implementing traffic calming measures <br />Action 6.16 Develop landscaped curb extensions <br />Action 6.21 Construct a multi -story parking structure around the edge of Downtown <br />Action 6.32 Amend the CDH District and Plan Approval sections of the Zoning Code to <br />be consistent with the Overarching Vision for 2025 <br />Action 6.33 Host an AI A Sustainable Design Assessment Team Program for Downtown <br />Hilo <br />Action 6.34 Create a Base Map to incorporate current conditions, resources, assets, and <br />infrastructure <br />Action 6.35 Create a Vision Concept that incorporates the EDH 2025 Action Plan <br />Action 6.41 emend Ch. 27 Flood Plain Management Code to minimize restrictions on <br />building renovation and construction <br />Action 6.52 Conduct a feasibility study for implementing a co- housing project with <br />options for seniors and people with disabilities in appropriate locations <br />Envision Downtown Hilo 2025 Progress Report January 2009 -June 2010 Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.