HomeMy WebLinkAbout2011-10-25 Water Board Minutes MINUTES
DEPARTMENT OF WATER SUPPLY
COUNTY OF HAWAII
WATER BOARD MEETING
October 25, 2011
Department of Water Supply, Operations Conference Room, 889 Leilani Street, Hilo
MEMBERS PRESENT: Mr. Dwayne Mukai, Chairperson
Mr. Robert Meierdiercks, Vice-Chairperson
Mr. David Greenwell
Mr. Kenneth Kaneshiro
Mr. Bryan Lindsey
Mr. Delan Perry
Mr. Art Taniguchi
Mr. Milton Pavao, Manager-Chief Engineer, Department of Water Supply
(ex-officio member)
ABSENT: Ms. Bobby Jean Leithead-Todd, Director, Planning Department(ex-officio
member)
Mr. Warren Lee, Director, Department of Public Works (ex-officio member)
OTHERS PRESENT: Ms. Kathy Garson, Assistant Corporation Counsel
Ms. Emarie Carvalho, Legal Technician, Corporation Counsel
Mr. Steve Lim, Carlsmith Ball LLC
Mr. Jason Knable, Carlsmith Ball LLC
Mr. Kaimi Judd, Kohanaiki Shores, LLC
Department of Water Supply Staff
Mr. Quirino Antonio, Jr., Deputy
Mr. Kurt Inaba, Engineering Division Head
Mr. Rick Sumada,Waterworks Controller
Mr. Daryl Ikeda, Chief of Operations
Ms. Julie Myhre, Energy Management Specialist
Mr. Keith Okamoto, Engineering Division
Mr. Kawika Uyehara, Engineering Division
Ms. Kanam Aton, Public Information and Education Specialist
Mr. Clyde Young, Operations
Ms. Crestita Hudman, Customer Service Supervisor(arrived at 11:25 a.m.)
Ms. Tennyson Noyes, Cashier I(arrived at 11:25 a.m.)
1) CALL TO ORDER—Chairperson Mukai called the meeting to order at 10:02 a.m.
2) STATEMENTS FROM THE PUBLIC
None.
Page 1 of 21 10-25-11—Water Board Minutes js
3) APPROVAL OF MINUTES
The Chairperson entertained a Motion to approve the Minutes of the September 27, 2011,Water Board
meeting.
ACTION: Mr. Meierdiercks moved to approve; seconded by Mr. Kaneshiro, and carried unanimously by
voice vote.
The Chairperson entertained a Motion to approve the Minutes of the October 10, 2011, Special Meeting on
the Selection of new Manager-Chief Engineer.
ACTION: Mr. Greenwell moved to approve; seconded by Mr. Perry, and carried unanimously by voice
vote.
4) APPROVAL OF ADDENDUM AND/OR SUPPLEMENTAL AGENDA
(Note: Addendum requires Roll Call Vote)
Chairperson Mukai entertained a Motion to approve an Addendum, 7(B), JOB NO. 2003-823, PALANI
ROAD TRANSMISSION WATERLINE (MAMALAHOA HWY TO PALANI NO. 2 RESERVOIR).
ACTION: Mr. Meierdiercks moved to approve; seconded by Mr. Taniguchi. The following roll call vote
was held: Messrs. Kaneshiro (Aye), Greenwell (Aye), Lindsey(Aye), Meierdiercks (Aye), Taniguchi
(Aye), Perry(Aye) and Chairperson Mukai(Aye). Motion carried unanimously with seven(7) Ayes.
Chairperson Mukai asked that Item 7(A), KOHANAIKI REIMBURSEMENT AGREEMENT-- QUEEN
KA`AHUMANU HIGHWAY WIDENING, PHASE 2, and Item 7(B), JOB NO. 2003-823, PALANI
ROAD TRANSMISSION WATERLINE (MAMALAHOA HWY TO PALANI NO. 2 RESERVOIR)be
moved to the top of the Agenda.
7) NORTH KONA:
A. KOHANAIKI REIMBURSEMENT AGREEMENT-- QUEEN KA`AHUMANU HIGHWAY
WIDENING, PHASE 2:
The developer, KOHANAIKI SHORES, LLC (Kohanaiki), is requesting the Water Board to enter into
a reimbursement agreement, under which Kohanaiki shall reimburse DWS for changes to the new 16-
inch waterline that will be installed with the Queen Ka`ahumanu Highway Widening Phase 2 Project.
The proposed changes will help improve the flow of water along Queen Ka`ahumanu Highway in both
directions.
The preliminary design has been reviewed, and the contractor, Goodfellow Bros, Inc., established a
cost estimate, which Kohanaiki has accepted, and is subsequently proposing to enter into the subject
reimbursement agreement with the Water Board.
The Manager-Chief Engineer said that the State Department of Transportation(DOT)wants to improve
the highway from Honokokau Harbor intersection all the way to the (Keahole International)Airport.
As part of those improvements, DWS will install some waterlines within the Right of Way, which
DWS is paying for. In addition, Kohanaiki has requested that some changes be made. However, since
the DOT is dealing directly with DWS (and not Kohanaiki) on this project, DWS will be doing the
work,the Manager-Chief Engineer said. Kohanaiki will reimburse DWS for that portion of the work
that pertains to Kohanaiki's improvements (i.e.,the portion that is necessary to provide service to
Kohanaiki).
Page 2 of 21 10-25-11—Water Board Minutes js
Mr. Inaba said that the current reimbursement agreement is similar to the one between DWS and
Kohanaiki last year on the design portion of the project. This is a design-build project; DWS agrees to
a"not to exceed"amount, and the contractor and Kohanaiki gave DWS the funds to execute the change
order, he said. Under the current reimbursement agreement, DWS will receive the funds and DWS will
execute the change order with the contractor. This agreement is to do the construction portion of the
project.
Ms. Garson said she wanted to make clear that there was never a written agreement on the design
contract. The current agreement encompasses the design portion because the parties never came to an
agreement on the exact terms. Therefore,this agreement encompasses some of the design costs, and
construction. She also clarified that the version of the agreement that the Board received is DWS's
version. The developer, Kohanaiki, had some changes that they wanted to request the Board to make,
she said. This morning,the Board received the developer's black-lined version of the agreement that
the Board got from DWS. She suggested that the developer might want to explain why they wanted or
needed the changes to the proposed agreement.
Chairperson Mukai asked Mr. Lim,the attorney representing Kohanaiki,to summarize the differences
between the DWS version and the changes he recommended.
Mr. Lim said that he had made comments on the first version of the agreement, which Ms. Garson had
provided to the Board. He said those comments were marked"Draft"on the top right hand of the page,
and"Draft dated October 24"on the bottom. This is really a red-line of his proposed changes, Mr. Lim
said. Mr. Lim gave the history of the agreement, which is part of the June 15, 1999 water agreement,
whose three parties at this point in time are Hiluhilu Development on the Palamanui project, Kohanaiki
Shores and the Water Board. The first amendment to the water agreement was dated January 11, 2007.
The improvements at hand are all detailed in Exhibit A, Mr. Lim said. There are very detailed plans
worked out over the past six to eight months, and this is probably the fourth iteration of the plans in
terms of what will go into the Queen Ka`ahumanu Highway to service the project. Mr. Lim said he is
pretty comfortable that this is the final design, and that is the reason for his proposed amendments.
Turning to the proposed changes, Mr. Lim noted that in the DWS version, Kohanaiki must pay its
share of the improvements, and if there are any changes to the improvements that are going to service
Kohanaiki's project,then Kohanaiki will have to pay for everything. Mr. Lim said he does not have a
problem with that concept; he only has a problem with the lack of control over the concept. Kohanaiki
does not determine what is going to go into the highway, and Kohanaiki does not design the water
system. However,these are all requirements that are required by DWS, he said. The big change that
Kohanaiki is asking for is that once there are additional, unforeseen costs or changes, Kohanaiki will
be responsible for paying the fair share pursuant to the mutual agreement of DWS and Kohanaiki. If
there is a change later on, for whatever unforeseen reason, Kohanaiki wants to be able to at least have
a negotiation over that change, for the purposes of this present design that is attached to the
agreement, Mr. Lim said. He noted that that is a total of about$704,523.00 of the Kohanaiki share,
which Kohanaiki is committed to pay within 30 days of the execution of the Memorandum of
Agreement. That would allow DWS to have the certainty of the money in hand. Kohanaiki would
then be able to tell DOT to accept Kohanaiki's change order for this work, and things can proceed, Mr.
Lim said. He said he hoped that this is a reasonable change for the Water Board to accept.
Mr. Taniguchi asked whether Kohanaiki was asking for the right to at least get an explanation if the
amount exceeds the original $704,523.00 due to unforeseen circumstances, etc. He asked if Kohanaiki
was also agreeing to pay its fair share.
Mr. Lim confirmed this, saying that within 30 days after the determination of the fair share, Kohanaiki
will pay that amount to DWS. He noted that Mr. Inaba had reported at a previous meeting that part of
these infrastructure improvements with the highway are to enable DWS to adequately make its
Page 3 of 21 10-25-11—Water Board Minutes js
connections to DWS's northernmost mauka-makai connector going through the Palamanui project.
Part of these improvements are aimed at better serving DWS's existing customers like the airport and
the Natural Energy Laboratory Authority of Hawaii (NELHA). Mr. Lim said that is why Kohanaiki
wants to be able to have that negotiation at the end of the day, because otherwise Kohanaiki would just
write the check--and have no protection. Kohanaiki is pretty comfortable with the design and does
not expect anything else to come up, but Mr. Lim said he wants to protect his clients from exposure to
undue cost.
Mr. Taniguchi asked for an example of what would constitute a reasonable fair share, and he asked
what might cause Mr. Lim to advise his client that it is not a reasonable fair share.
Mr. Lim gave the example of an additional connecting transmission line that DWS wants to put in,
where some of the line would get water to Kohanaiki, but where the lion's share would service the
entire northern Kona system. That would be the kind of scenario where Kohanaiki would want to be
able say, for example,the cost is $300,000.00, but Kohanaiki's share should be only$100,000.00;
Kohanaiki would want to negotiate that number, Mr. Lim said. Mr. Lim said he was perfectly willing
to do this; Kohanaiki wants to have the project go forward, and has a timetable that it wants to go
forward on. He mentioned the County park at Kohanaiki Shores that is dependent on the water system
going in, which Kohanaiki is very interested in doing.
Mr. Greenwell asked for the Manager-Chief Engineer to comment.
The Manager-Chief Engineer said that DWS always tries to be fair, and has no problems with the true
concept of fair share. He said that he thought that the language was reasonable, and DWS has always
tried to treat developers fairly. If something is the developer's fault,then the developer pays for it. If
something is not the developer's fault,then the developer is not going to pay for it—it is plain and
simple, he said.
Mr. Inaba said that either agreement would have been fine. He said he understands that Kohanaiki
wants protection.
The Manager-Chief Engineer expressed confidence that DWS has been really fair with Kohanaiki, and
that Mr. Lim knows that.
Mr. Lim said he agreed with this, on the record.
Mr. Meierdiercks noted that with construction contracts, DWS usually has a 10 percent contingency,
but he did not see a contingency in this agreement.
Mr. Inaba explained that the contingency is built into the contractor's estimate at this point.
Mr. Meierdiercks said that this was still an estimate, but he did not see a 10 percent contingency here.
Mr. Inaba said that this is a final change order cost, noting that this is a design-build project. In the
cost breakdown, it shows that this is the leeway they have to work with.
Mr. Meierdiercks asked if it was already in there.
Mr. Inaba said that it is to account for things like minor design flaws.
Mr. Meierdiercks asked if this was the maximum, and whether it may come in cheaper than this.
Mr. Inaba said no,that is the cost, and Kohanaiki is taking some risk with it because it is a design-build
project. Kohanaiki would be responsible for any changes to the original design(i.e., due to something
in the original design that does not work). He said that Mr. Lim was referring to possible changes
Page 4 of 21 10-25-11—Water Board Minutes js
whereby DWS sees a benefit to the system if DWS adds a connection or changes the line size. That
kind of thing would be something above and beyond the contract, Mr. Inaba said. He gave the example
of a party that wants a separate connection to their property;that would obviously be out of the scope
of the amount in question.
The Manager-Chief Engineer noted that this is a design-build contract, similar to the one in Hawaiian
Ocean View Estates. A design-build project takes some of the control away from the governing
agency, he said. The reason for doing the design-build is timing. DWS would prefer projects that are
the conventional pattern of design first,then build. In this case,the contractor does the design and also
does the construction. The contractor is responsible for the price he gave, because theoretically he
went through the entire design and priced it out, he said. The contingency should have been built into
the contractor's fee,the Manager-Chief Engineer said.
The Deputy said that with a design-build,the contractor and the consultant are one team, and DWS is
on the other side. The design consultant works with DWS to make sure that the design is what DWS
wants. That is why DWS is paying for everything, he said. The contingency amount is covered in
there, he added.
Mr. Kaneshiro noted that there may be some changes, and asked whether there is some type of leeway
in the contract or a contingency, on the Department's side.
Mr. Inaba said that DWS did include a contingency on the Department's side, which gives DWS the
leeway to have the added changes over and beyond what the contractor originally bid on to design and
construct. DWS would have a limited amount to do added changes, Mr. Inaba said.
Ms. Garson requested three revisions to the agreement. She said that normally, DWS works very well
with all of the developers, and they are very reasonable. She wanted language that covered instances
where the parties do not agree. She asked for the Board's authorization to add a clause to provide for
some sort of alternative dispute resolution for times when the parties do not agree. She suggested the
Honolulu arbitration group called DPR.
Mr. Lim, introducing Kohanaiki's development manager, Mr. Kaimi Judd, said that he and Mr. Judd
will agree to alternative dispute resolution with DPR.
Ms. Garson said that clause would be added. She noted that at the bottom of Paragraph 3, Kohanaiki
understands that DWS is not going to process or submit any requests for a change order unless
Kohanaiki deposits the full monetary amount caused by Kohanaiki's modifications. Ms. Garson said
she wanted to add that DWS is not going to submit a request for change order unless the monetary
amount is deposited under any circumstance, not only when Kohanaiki requests a modification but also
including when there are unforeseen circumstances. She said this is just a clarification.
Mr. Lim said that was acceptable to him and his client.
Ms. Garson said the third item is a clarification in Paragraph 4. Kohanaiki added the statement that
any payments made by Kohanaiki are also going to be credited to the prevailing facilities charges.
Ms. Garson wanted to clarify that this is subject to the 24 percent mentioned in the agreement.
Mr. Lim said he agrees with that.
Ms. Garson apologized for making these changes in front of the Board. The parties did not have time
to make all the clarifications before the Board meeting; Kohanaiki needed to have this Item on this
month's Agenda.
Page 5 of 21 10-25-11—Water Board Minutes js
ACTION: Mr. Meierdiercks moved to approve the amendments; seconded by Mr. Taniguchi, and
carried unanimously by voice vote.
Chairperson Mukai asked whether the Motion was just for the amendment or the amended agreement.
Ms. Garson said that there had not been a Recommendation on this Item because DWS did not come
forward with a Recommendation. The Motion was to approve the amended agreement, she confirmed.
Chairperson Mukai said he had misspoken earlier about wanting to move up Item 7(B), JOB NO.
2003-823, PALANI ROAD TRANSMISSION WATERLINE (MAMALAHOA HWY TO PALANI
NO. 2 RESERVOIR). He said the next Item should be 5(A), JOB No. 2066-899, CONSTRUCTION
OF THE OLA`A NO. 6 PRODUCTION WELL AND 1.0 MG RESERVOIR.
5) PUNA:
A. JOB NO. 2006-899, CONSTRUCTION OF THE `OLA`A NO. 6 PRODUCTION WELL AND
1.0 MG RESERVOIR:
The contractor, Isemoto Contracting Company, Ltd., is requesting a contract time extension of 21
calendar days. This is the second time extension request for this project.
Ext. Days
4 From(Date) To (Date) (Calendar) Reason
1 5/26/11 11/25/11 183 Delays in receiving approval of the Medium
Voltage switchgear submittal from HELCO.
2 11/25/11 12/16/11 21 Delay in receiving test electrical power from
HELCO.
Total Days (including this request) 204
The project completion date must be extended due to delays in obtaining test electrical power from
HELCO. The test power was scheduled to be provided by mid-September 2011. However,test
electrical power was not provided to the contractor until mid-October 2011.
Staff has reviewed the request, and finds that the extension of 21 calendar days is justified.
The Manager-Chief Engineer recommended that the Board grant this contract time extension of 21
calendar days to Isemoto Contracting Company, Ltd., for JOB NO. 2006-899, `OLA`A NO. 6
PRODUCTION WELL AND 1.0 MG RESERVOIR. Upon approval,the contract completion date will
be extended from November 25, 2011 to December 16, 2011.
MOTION: Mr. Perry moved to approve; seconded by Mr. Greenwell.
Mr. Uyehara said that HELCO was three weeks behind schedule, but as of today,they are supposed to
begin testing power in early or mid-November, about three weeks from now. DWS is hoping to test
the wells at the end of November.
Chairperson Mukai said that DWS should open lines of communication with HELCO,to let HELCO
know how DWS's jobs are progressing. This will let HELCO know when it is time for them to come
in. DWS needs to give HELCO lead time because they are working on a skeleton crew. Hopefully,
opening lines of communication with HELCO will prevent these kinds of delays in future, he said. If
HELCO knows when the projects are coming up, HELCO can adjust its manpower accordingly.
The Manager-Chief Engineer said he had had a discussion with Mr. Jon Arizumi of HELCO about two
weeks ago. Mr. Arizumi was unaware of all of these delays, and the Manager-Chief Engineer asked
Page 6 of 21 10-25-11—Water Board Minutes js
Mr. Arizumi to help DWS to get everything done on time. Subsequent to that conversation, Mr. Inaba
will try to work something out with Mr. Arizumi,the Manager-Chief Engineer said.
Mr. Inaba said that when DWS communicates with HELCO, it is usually a customer service
representative who handles things, instead of the person assigned to the project. He mentioned a
miscommunication whereby HELCO's field person on the Palam project got the tank site wrong. He
said he will be working with Mr. Arizumi.
Mr. Taniguchi said that DWS should keep in mind that the Department is HELCO's biggest customer;
DWS should not be dealing with the customer service person. He said that someone higher up in
HELCO should be giving DWS attention. He said that he spoke with Mr. Arizumi at the HWWA
conference, and Mr. Arizumi agrees with Mr. Taniguchi. Mr. Arizumi is very customer-oriented, but
HELCO should have someone higher up give its biggest customer more attention—not the customer
service person.
The Manager-Chief Engineer said that he had mentioned to Mr. Arizumi that DWS is indeed HELCO's
biggest customer.
Chairperson Mukai said that DWS should work with HELCO to get a HELCO employee dedicated
only to handling DWS's requests. He said he also talked with Mr. Arizumi and got a favorable
response. He noted that HELCO needs DWS, its biggest customer.
The Manager-Chief Engineer agreed, and said that DWS should give Mr. Arizumi a heads-up when a
project is coming up so that Mr. Arizumi can push from his side. He said that Mr. Arizumi apologized
a lot for the delays, about which he was unaware.
Mr. Okamoto said Mr. Inaba was trying to set up a meeting with HELCO to find out who can be
dedicated to DWS's projects. That person will be invited to DWS's pre-bid and pre-construction
meetings.
ACTION: Motion carried unanimously by voice vote.
6) HILO:
A. JOB NO. 2002-802, CONSTRUCTION OF THE PI`IHONUA RESERVOIR NO. 2
REPLACEMENT:
The contractor, Isemoto Contracting Co, Ltd., has requested a 139-calendar day time extension. This
request consists of additional time to take delivery of the Motor Control Center(MCC) equipment,
complete the installation, and make the system operational, and then demolish the existing water tank
and appurtenances.
Subsequent to the first time extension request, further revisions were required prior to manufacturing
the MCC. This was the main factor behind the delay of delivery of the MCC.
Staff has reviewed the request and finds the 139 calendar days are justified.
This is the second time extension request.
Ext From(Date) To (Date) Days Reason
# (Calendar)
1 12/28/2010 11/8/2011 315 Days required to order the MCC, and
complete the remainder of the project
including demolition of the existing
Page 7 of 21 10-25-11—Water Board Minutes js
facilities.
2 11/8/2011 3/26/2012 139 Days required to take delivery and install
the MCC, and complete the remainder of
the project including demolition of the
existing facilities.
Total Days (including this request) 454
The Manager-Chief Engineer recommended that the Board approve a contract time extension to Isemoto
Contracting Co., Ltd., of one hundred thirty-nine (13 9) calendar days from November 8, 2011,to March
26, 2012, for JOB NO. 2002-802, CONSTRUCTION OF THE PI`IHONUA RESERVOIR NO. 2
REPLACEMENT.
MOTION: Mr. Perry moved to approve; seconded by Mr. Lindsey.
Mr. Inaba apologized for not bringing this Item to the Board sooner, when it became apparent that there
would be a delay. The delivery of the MCC was delayed by almost three months;this delay was beyond
the control of the contractor. There was a long downtime on this project, due to this delay. In addition,
when the plans went in for the building permit,the comment came back that the door needed to be
revised; a fire-rated door was needed. In the revised specifications, DWS specified a metal door with
steel wool core. A further delay came when the supplier said he could not get the door that the
contractor ordered;the supplier suggested a metal core door with fiber glass-type insulation. This was
acceptable, Mr. Inaba said. Once the contractor started work on the building,the contractor discovered
that the rebars for the walls and roof had been stolen from the job site. The tank was also vandalized, as
was the electrician's van. The van's catalytic converter was stolen as well. Although the MCC is here
now,the electrical contractor and the programming technician who have components in that system do
not want the MCC installed until the building is secured. Based on what has happened already at the job
site,the electrical sub-contractor said they would not be able to get a warranty if they installed the MCC
now. Therefore,the contractor is going to wait until the building is completed, before installing the
MCC. That is the reason that the contractor is asking for more than 90 days, Mr. Inaba said.
The Manager-Chief Engineer said the job site is above the hospital, off Waianuenue Avenue. It is
tucked away and its isolation lends itself to vandalism, he said. The job site has been vandalized twice
already.
Mr. Taniguchi asked about the MCC.
The Manager-Chief Engineer explained that the MCC is a cabinet built to house all of the relays, starters
and the rest of the electrical gear that runs and operates the booster pumps, etc.
Mr. Inaba said that to have the MCC "approved,"it needs to be completely installed,tested and
certified. If a component is damaged or stolen from the MCC, it is not a matter of being able to just go
out and get a new unit.
The Manager-Chief Engineer said that all of the components in the cabinet are linked together, so that if
one section is taken away, all of the components need to be redone to make the unit function properly.
Mr. Taniguchi asked how long it takes to install an MCC.
Mr. Inaba said it takes a few weeks to install the MCC, and then the contractor has to tie in all of the
external wiring to the MCC. Therefore, it takes at least a month to complete everything. The work is
time-consuming, he said.
Page 8 of 21 10-25-11—Water Board Minutes js
Mr. Perry asked if he was correct in thinking that the security of the MCC is related to one door. He
asked if the door would be adequate. He asked whether there would also be fencing.
Mr. Inaba said the metal door will be adequate. There will be a fence, but someone can jump over it, he
said. DWS wants to have the site as visible as possible, without bushes that would shield trespassers.
The Manager-Chief Engineer said that in some cases in the past,the MCC would be put in through the
roof by a crane after the doors were installed, because the concerns about security were so great. The
MCC is really expensive equipment, he said.
ACTION: Motion carried unanimously by voice vote.
7) NORTH KONA:
A. KOHANAIKI REIMBURSEMENT AGREEMENT-- QUEEN KA`AHUMANU HIGHWAY
WIDENING, PHASE 2:
(This Item was covered earlier in the meeting.)
B. JOB NO. 2003-823, PALANI ROAD TRANSMISSION WATERLINE (MAMALAHOA HWY
TO PALANI NO. 2 RESERVOIR):
The contractor, CTS Earthmoving, Inc., has submitted a request for a contract time extension of twenty
(20)work days, due to a delay by HELCO, which is being caused by a lack of available materials.
This would be the fourth time extension to the contract.
If approved,the contract completion date will be extended from October 31, 2011 until November 30,
2011. Engineering staff has reviewed the request, and finds that the twenty(20) work day time
extension is a reasonable request by the contractor to allow HELCO to obtain materials, get on site and
complete their work, as well as allow the electrical subcontractor finish their work after HELCO is
done.
Extension From(Date) To (Date) Days (Work) Reason
1 8/21/11 9/07/11 12 Add'1 Work request
by DWS
2 9/07/11 9/29/11 16 Add'1 Work request
by DWS
3 9/29/11 10/31/11 33 Add'1 Work(DWS)
&HELCO DELAY
4 10/31/11 11/30/11 20 HELCO DELAY
(Materials)
Total Work Days 81
(incl.this ext.)
The Manager-Chief Engineer recommended that the Board grant this extension of contract time of
twenty(20) calendar days,to CTS Earthmoving, Inc., for JOB NO. 2003-823, PALANI ROAD
TRANSMISSION WATERLINE (MAMALAHOA HWY TO PALANI NO. 2 RESERVOIR).
MOTION: Mr. Meierdiercks moved to approve; seconded by Mr. Greenwell.
Mr. Beck said that HELCO has received the materials, but they are already three weeks behind
schedule. However,the project is going forward, he added.
Page 9 of 21 10-25-11—Water Board Minutes js
Chairperson Mukai said that hopefully, items like this will not come before the Board in the future.
ACTION: Motion carried unanimously by voice vote.
8) KA'U:
A. JOB NO. 2009-959 (RE-BID),PAHALA WELL #1 REPAIR:
The contractor, Beylik Drilling and Pump Service, Inc., has requested a contract time extension of 94
calendar days. This is due to unforeseen events involving vandalism and property damage that occurred
in the process of the pump installation. The pump and motor incurred damage during the incident, and
required shipment back to the manufacturer for repair. In addition, new power cable and air line tubing
needed to be re-ordered.
Note: There is no additional cost associated with this time extension. Material and labor costs shall be
covered by the contractor's insurance.
Staff has reviewed the request, and finds that the extension of 94 calendar days is justified.
This is the first time extension request, which revises the contract completion date from
September 28, 2011 to December 31, 2011.
The Manager-Chief Engineer recommended that the Board approve a contract time extension to Beylik
Drilling and Pump Service, Inc., of 94 calendar days for JOB NO. 2009-959 (RE-BID), PAHALA
WELL 41 REPAIR. If approved,the contract completion date will be revised from September 28, 2011
to December 31, 2011.
MOTION: Mr. Meierdiercks moved to approve; seconded by Mr. Perry.
The Manager-Chief Engineer said this was another site that was vandalized. DWS's well sites in Pahala
are above the old camp in the cane fields, an isolated area which is subject to vandalism.
Mr. Young reported that the contractor was in the process of installing the new pump and motor, and
100 feet of pipe had already been set in the hole with the pump and motor. The vandalism took place in
the early morning hours of July 11, 2011. The belief is that more than one person was involved in the
incident, during which the fence was cut and the facility was broken into, Mr. Young said. The
perpetrators were probably going after the copper in the submersible cable, he said. Mr. Young showed
on the overhead projector some photos of the damage the intruders caused. He showed what he called
the elevator, which supports the entire column pipe that sits in the hole with the motor. The vandals
decided to remove the elevator, and in the process,the pump started to fall into the hole. There were a
little over 100 feet of column pipe, or more than 1.5 tons of weight pulling down the cable, Mr. Young
said. The falling pump and column pipe pulled down the submersible cable off the mounts, and it
slammed against the rig and the discharge pipe. Mr.Young showed the shaft that had supported the
cable spool, and noted that some DWS equipment was damaged as well as the cable and the air line in
the hole. Mr. Young said the vandals must have just taken off after the big cable spool flew off its
mounts. He said the vandals were lucky that they did not get killed. Mr.Young showed some more
photos of the damage, including a damaged flow switch, piping, etc. Because of the damage, DWS
needs to get new cables and a new air line. The pump and motor have to be sent back to the
manufacturer for repairs and testing, a process that takes months to complete.
The Manager-Chief Engineer said it was just fortunate that nobody got hurt in the enormous jolt that
occurred after the vandals removed the elevator.
Page 10 of 21 10-25-11—Water Board Minutes js
Mr. Young said that a police report was filed, but so far no arrests have taken place. He said he believed
that insurance covered the contractor's costs in the incident; it was not DWS's responsibility.
Mr. Taniguchi noted that the Board never got the first time extension request;this time extension
request is the second one.
The Manager-Chief Engineer suggested that when the Board has its full complement of nine members,
the Board should request a tour of a well site that has a well, a booster pump, a tank and an MCC.
Seeing all of these things will make it easier to understand when topics such as pumps and electrical
equipment, etc. are being discussed at a Board meeting.
Mr. Okamoto said that DWS could actually have lost this entire well if the pump wedged in the hole.
The Manager-Chief Engineer agreed, saying that had happened in the past.
Mr. Young said if the cable had snapped,the pump would have fallen right into the hole.
Chairperson Mukai asked Ms. Aton if some kind of press release could be done about the well being
vandalized, along with the possible ramifications including injury to the vandals.
Ms. Aton asked if the Chairperson meant something educational.
Mr. Meierdiercks said there were pluses and minuses to doing such a press release.
Mr. Inaba expressed misgivings about exposing too many details.
Chairperson Mukai said the press release should not say the vandals went to steal copper, etc.
Mr. Inaba feared that somebody mad at the world might get an idea.
Ms. Aton said it might expose the vulnerability of the site.
The Manager-Chief Engineer suggested posting a sign warning: "Electrical Fence."
Mr. Meierdiercks suggested it say"High Voltage."
Mr. Taniguchi said it was a good idea.
ACTION: Motion carried unanimously by voice vote.
9) MISCELLANEOUS:
A. REPORT OF AD HOC FINANCE COMMITTEE:
The Water Board's Ad Hoc Finance Committee Chairperson, Mr. Art Taniguchi, has been investigating
the three focus areas (DWS's policies on credit card use, cash control and vehicle take-home), which
encompass the scope of the Committee's work. At this meeting,the Committee may do the following:
Possible approval of DWS's vehicle policy, based on modifications following union
comments;
Decals on DWS vehicles;
Discussion of DWS's cash handling procedures and proposed changes. Discussion may
include a possible switchover to Oahu's billing system.
No report at this meeting.
Page 11 of 21 10-25-11—Water Board Minutes js
B. DISCUSSION REGARDING DRAFT OF PROPOSED RULE CHANGE REGARDING WATER
SERVICE TO CONSUMERS/RESPONSIBILITY FOR PAYMENT OF BILLS:
Ms. Garson said she did not have a chance to discuss this thoroughly with Customer Service. In the
meantime, Mr. Sumada had submitted a number of other rules that he wanted to revise, she said.
Ms. Garson suggested that the Board look at a comprehensive revision of the Rules and Regulations
beginning in January next year. She noted that the last such revision took place in 2004. She said that
in conversations with the Department,there was a desire to revise certain things such as the facilities
charge and how developers get credited, etc. Ms. Garson suggested putting the matter off until next
year, when there is a full Board and a new Manager-Chief Engineer. At that point,the Board can take a
good look at all of the Rules, but may choose to revise the Rules piecemeal. For any Rule change, a
Public Hearing must be held. Therefore, it would be easier if the Board went to Public Hearing with a
bunch of revised Rules at the same time, she said. In any case, it is the Board's call. If the Board wants
to push this particular Rule Change (regarding water service to consumers/responsibility for payment of
bills)towards the end of the year, it would be up to the Board to decide.
Chairperson Mukai said he concurred with Ms. Garson's advice to put it off to next year,when his term
as Chairperson is over.
Ms. Garson said that if the Board agrees, she will remove this Item from the Agenda, and put it back on
the Agenda in January.
C. REPORT OF AD HOC COMMITTEE TO REVISE THE MANAGER-CHIEF ENGINEER'S
EVALUATION FORM:
The Water Board's Chairperson of the Ad Hoc Committee to Revise the Manager-Chief Engineer's
Evaluation Form, Mr. Ken Kaneshiro, has been looking at a revised Manager-Chief Engineer Evaluation
Form.
Mr. Kaneshiro said there was no report. He said that the Board needed to move on this matter before
the new Manager-Chief Engineer is on board.
D. ENERGY MANAGEMENT ANALYST UPDATE:
Ms. Myhre reported that she presented at the HWWA conference on energy management best practices,
on why the four counties' water departments should partner, and on Hawaii County's perspective. She
noted that she drew a tough time slot, at 3:00 p.m. when many attendees were sleepy. She did get some
good feedback from attendees who paid attention to the presentation, she added. Prior to the
presentation, Ms. Myhre met with Maui County engineers, who are interested in installing a hydro-
generator. She took the engineers to DWS's various hydro-generator sites. Maui is looking into hiring
an energy management person, she said.
E. MONTHLY PROGRESS REPORT:
No discussion.
F. REVIEW OF MONTHLY FINANCIAL STATEMENTS:
Mr. Taniguchi asked what caused DWS's receivables to increase so much, noting that it was a huge
jump. He asked whether it was a matter of timing of the billing.
Mr. Sumada said yes, in this case it was a matter of timing. He said that it takes two months to bill the
entire island so the change in the balance sheet from one month to the next only shows half of the
accounts.
Page 12 of 21 10-25-11—Water Board Minutes js
Mr. Taniguchi said the receivables had remained pretty constant before, but this time the receivables
jumped.
Mr. Sumada said that the number goes up and down; although the number of accounts is constant from
one month to the next,the amount that is billed is very different. This can be seen when looking at the
consumption that is billed from month to month, he said. It can be 800 million gallons one month, and
then go down to 600 million gallons the next month. The fluctuations are of that magnitude from month
to month, and that impacts the receivable amount, which is related to consumption.
The Manager-Chief Engineer said that Mr. Sumada had recently done an interesting report about
consumption. DWS has had a huge reduction in consumption over the years,which is leading to less-
than-desirable revenues, he said.
Mr. Sumada said that the report, which looks at Operating Results for Fiscal Year(FY) 2011, includes
an analysis of consumption for the past five years. From FY10 to FYI 1, consumption dropped about
700 million gallons; in FYI 0, DWS billed for 9.5 billion gallons and in FYI 1, it dropped to 8.8 billion
gallons. This represents a tremendous decline in consumption. Mr. Sumada said that Ms. Myhre had
looked at pumpage over the same period, and the pumpage followed the same trend as consumption.
Because consumption plummeted so sharply,the revenues that DWS thought would increase in FYI I
failed to increase at all. In fact, DWS lost money in FYI 1, budget-wise. DWS was expecting to
generate $2.8 million in FYI I to help contribute to C.I.P. construction. However, because consumption
fell so much, DWS ended up losing $400,000.00 for the year, Mr. Sumada said.
Mr. Inaba said that another contributing factor to the decline in consumption was the high level of
rainfall in Kona over an extended period recently. That area posted the biggest drop in consumption, he
said.
The Manager-Chief Engineer said that another factor is the lack of construction projects, which are a
major consumer of water. Construction projects use huge volumes of water for dust control and to keep
the job sites clean. With few construction projects underway,that kind of consumption is absent.
Mr. Sumada said that in conjunction with consumption was the Power Cost. Looking at FYI 1,the
Power Cost that DWS paid was $1.8 million more than the Power Cost revenues that DWS collected.
That, along with the decline in consumption, wiped out any revenues that DWS thought it would be able
to contribute to C.I.P.,he said.
Mr. Taniguchi asked whether the receivables amount includes the Power Cost.
Mr. Sumada confirmed that it does.
Mr. Taniguchi said that the receivables this time jumped by about$1.7 million, which is a huge change.
Therefore, he was just wondering what caused that; all of a sudden, DWS was billing way more than it
had been billing. He now understood that it was the timing, and it could also be the Power Cost,that
caused the big jump.
The Manager-Chief Engineer said he did not see how DWS could adjust the Power Cost Charge more
frequently than every other month, because of the statutory Public Notice period.
Mr. Taniguchi said he was just asking why the receivables jumped so much.
Mr. Meierdiercks wondered whether the Board could use these numbers, assuming they keep going
consecutively,to anticipate the Power Cost and raise it accordingly. He said that, after all, it is an actual
cost, and it would be over time.
Page 13 of 21 10-25-11—Water Board Minutes js
The Manager-Chief Engineer said DWS has an obligation to charge the customer what it costs DWS;he
did not think DWS could go beyond that.
Mr. Meierdiercks said that it is an actual cost.
The Manager-Chief Engineer said yes, DWS has to go with the actual cost, but DWS cannot anticipate
something and tack it on to customers' bills.
Mr. Meierdiercks said that DWS has a track record of that.
The Manager-Chief Engineer countered that it would not be actual.
Mr. Meierdiercks countered that they are actual costs.
The Manager-Chief Engineer said they are anticipated actual costs. He asked Ms. Garson if DWS could
tack on anticipated actual costs.
Ms. Garson said that DWS would have to revise the formula that the Department is using for the Power
Cost.
Mr. Meierdiercks said that is what he meant. If DWS has the statistics that substantiate it, DWS should
be able to charge the anticipated cost, because DWS keeps losing it. If DWS keeps losing it,then at
least DWS has a track record that it is losing it. In other words, if DWS is not charging enough, DWS
had better charge what it can, at least to cover its costs. That, Mr. Meierdiercks said, is basically what it
is all about.
The Manager-Chief Engineer noted that sometimes, DWS puts the Public Notice in the paper, and in the
process of advertising the Public Hearing,the Power Cost goes up again and DWS is stuck with the rate
it advertised. Unfortunately, DWS cannot adjust the Power Cost Charge more frequently, because the
timing of the Public Notice will not allow it.
Mr. Kaneshiro said that eventually, DWS will get its money back;the recouping is delayed by about
three months, but the money does come back. He asked Ms. Garson if there is a possibility of doing
away with the Public Hearings on the Power Cost.
Ms. Garson said no.
Mr. Kaneshiro said the reason he was asking is that no one testifies at the Public Hearings on the Power
Cost, and it is wasting the Board's time. He asked if there is a way to tweak the Rules so that DWS can
adjust the Power Cost more frequently, without holding Public Hearings.
Ms. Garson said that the requirement to hold Public Hearings is a Statute.
Mr. Kaneshiro noted that his Oahu water bill never mentions any Power Cost increases. As he said
earlier, DWS eventually gets its money back. However, the bottom line looks bad for DWS and the
delay is not helping DWS, he said.
The Manager-Chief Engineer said that because the Power Cost Charge is considered a rate, and because
the Statute says that whenever DWS adjusts rates, DWS must hold a Public Hearing. The solution
might be if DWS can factor the Power Cost out from the rate, and not call it a rate. If the Power Cost is
not a rate,then DWS will not need to hold a Public Hearing, he said.
Mr. Taniguchi said the Power Cost is just a pass-through.
Mr. Kaneshiro said it is a pass-through of whatever HELCO charges DWS.
Page 14 of 21 10-25-11—Water Board Minutes js
Ms. Garson said she can look into the matter; she knows that Honolulu treats the Power Cost differently.
She said that she felt it better to play it safe to hold the Public Hearings before adjusting the Power Cost
Charge, because the Statute talks about rate increases, etc. She feared that if DWS did not hold a Public
Hearing,that the rate adjustment could be considered invalid. She said she would explore the matter,
acknowledging that DWS does treat the Power Cost differently than Honolulu does.
The Manager-Chief Engineer asked Ms. Garson whether it would make a difference if the Power Cost
was not part of DWS's rate structure, and if that would alleviate the need for Public Hearings.
Ms. Garson said she did not think it would make a difference, saying if you call it a duck, it is still a
duck.
Mr. Greenwell asked Mr. Taniguchi and Mr. Sumada about the possibility of setting up an escrow
account that would provide a cushion against such shortfalls. He said that when DWS does not receive
what it should, DWS is not only losing the money, but also a great deal of interest.
Mr. Taniguchi said that even if there were such an escrow account, it would still come out of DWS's
money.
Mr. Greenwell said that at least an escrow account would be earning a return while the money was just
sitting there.
Mr. Taniguchi said that would work if DWS had the money, but if DWS collects less,the balance would
drop and even possibly go into negative territory.
Mr. Greenwell said if DWS collects less, it could take the money out of the account, and then in the
following month if it collected more, it could put that back into the escrow account. An escrow account
would at least create a cushion, so that DWS is not always behind.
Chairperson Mukai asked how DWS would create funds to put into an escrow account. The money
would have to come from someplace, but the way the formula is written, DWS cannot overcharge
money to put into an escrow account.
Mr. Taniguchi said Mr. Kaneshiro's proposal has a lot of merit. DWS should look into doing what
Honolulu Board of Water Supply is doing on the Power Cost;this would give DWS the ability to adjust
rates without holding a Public Hearing. Honolulu must surely have done due diligence to come up with
their rationale, he said. He thought it was a good starting point. Mr. Taniguchi asked Ms. Garson if she
could look into it.
Ms. Garson said she would speak to the Honolulu Board of Water Supply's attorney.
G. MANAGER-CHIEF ENGINEER'S REPORT:
The Manager-Chief Engineer will provide an update or status on the following:
1) Palam Road Transmission Waterline Project—Noting the time extension approved earlier in
the meeting,the project is wrapping up and hopefully will be done by the end of the extension
period. This project will bring a lot of mauka water makai, and reduce the pumping at the
Kahalu`u Shaft. As a result,the quality of the water will be greatly improved for the customers
along Ali'i Drive.
2) Hawaiian Ocean View Estates Project—Mr. Inaba said that HELCO encountered a voltage
problem, and will be going back to the site on Thursday to resolve it. The Manager-Chief
Engineer said that once the electrical work is done, DWS can start the pump, do the efficiency
test,take the water samples and send them to the Department of Health(DOH). Mr. Okamoto
Page 15 of 21 10-25-11—Water Board Minutes js
said the DOH testing, etc., should be done by January. The Manager-Chief Engineer said that
hopefully,the system will be running by January.
3) Pu`ukala/Kona Ocean View Properties Subdivision Improvement District Update—DWS will
be meeting with the new head of the U.S. Department of Agriculture (USDA)tomorrow.
USDA provides a loan/grant program for improvement districts like this one, and is eager to
loan money,the Manager-Chief Engineer said. The meeting tomorrow is aimed at seeing how
DWS can take more advantage of their loan/grant program. The loans are low interest, and the
program is a good one. USDA seems to think that DWS can wrap up a loan program in 60
days; it used to take 9-10 months to get a USDA loan,the Manager-Chief Engineer said.
4) Public Information and Education Specialist Update—The Manager-Chief Engineer
congratulated Ms. Aton on a very good conference. Ms. Aton said it was a group effort among
all of DWS's divisions. She said that prior to the conference, DWS met with the Ocean View
community at a meeting facilitated by Council member Ms. Brittney Smart. DWS gave
updates on the construction of the fill station and the water quality timeline, based on when the
electrical power would be able to pump up water samples from the well. The timeline runs
three months out from the date of the meeting, she said. DWS explained the voltage issues and
how the water quality timeline would not start until the power was on and the samples were
taken. The community appeared to accept the explanation, she said. Most of the concerns that
the community expressed were regarding the fill station road. There were no major concerns
regarding the gate hours, she said. The Manager-Chief Engineer said that the community has
formed a committee to determine the gate hours;the committee was to meet in about two
weeks' time from the date of the meeting. The community will let DWS know what gate hours
the community considers to be reasonable. He noted that there is a residence right next to the
fill station, and DWS does not want to disrupt the residents. Ms. Aton said that another
community meeting is expected to take place soon.
5) HWWA conference report—Ms. Aton reported that there were 115 registrants, with 122
attending the meet-and-greet event and 123 at the banquet. The hotel offered the same food
and beverage rates for the conference as they did for the 2009 conference. Attendees
expressed appreciation at the diversity of presentation topics, she said. Among the suggestions
were a panel of water supply managers from each county and a panel of finance directors from
each county. Regarding upcoming educational events, Ms. Aton said there are Career Days
coming up at Kalaniana`ole Intermediate and at the Youth Challenge Academy at the former
Kulam Prison. The Manager-Chief Engineer expressed appreciation to the Board for attending
the conference. Mr. Taniguchi complimented the DWS Kona staff for their great hospitality.
Mr. Kaneshiro said he was particularly interested in the speaker on watershed protection, and
asked the Department if there were any initiatives regarding watershed protection and
groundwater recharge. Funding for such initiatives is always a consideration, and he suggested
that Ms. Garson talk with the hotel association here to see if they were willing to help with the
watershed coalition on a voluntary dollar-a-night fund. Hotel guests would be asked to pay a
voluntary dollar per each night's stay in the hotel,to be contributed to watershed protection.
Mr. Kaneshiro said that he had experienced such a fund-raising campaign while staying in
Puerto Rico for a coral reef initiative. He said nobody would refuse to pay a voluntary dollar a
night, and he thought it was something for DWS to think about. The Manager-Chief Engineer
noted that there had been similar bills before the Legislature, but none passed. The Manager-
Chief Engineer said that DWS is active in watershed restoration, participating in a number of
such groups. DWS has not actively raised funds for such initiatives, but Ms. Aton represents
DWS at watershed committee meetings. Ms. Aton confirmed this, noting that she will attend
such a meeting in November. DWS is basically continuing to keep the conversation going; it
is more at the talking level but the issue of watershed protection is coming to the fore,
Ms. Aton said. Mr. Kaneshiro said everything comes down to money, and the dollar a night
initiative is something to think about. Mr. Okamoto said that DWS is working with DOH,
Page 16 of 21 10-25-11—Water Board Minutes js
which has federal grant money available. Maui and Kauai are doing watershed initiatives, and
DWS is looking to do something along the lines of Kauai's model,through education, sign
placement, etc., Mr. Okamoto said. Mr. Perry said there was a speaker on watershed
protection at the recent Farm Bureau convention; Ms. Emma Yuen(former Planning Director
Chris Yuen's daughter) agreed to speak on the subject to DWS. Mr. Perry said that two
counties are making voluntary contributions for fencing and other kinds of things that keep
animals out of the watershed. Mr. Perry suggested that DWS look at that as another way of
funding watershed protection. The Manager-Chief Engineer said that there had been bills
before the Legislature to generate funds for watershed protection, but none passed. Mr. Perry
said that his impression is that the Department of Land and Natural Resources (DLNR)thinks
that they do not have to go to the Legislature to start charging water users. Mr. Kaneshiro said
that the County has a Commission on public access, open space and natural resource
preservation, and there is an initiative to earmark 2 percent of the budget by law. DWS may be
able to propose that some of the money go toward watershed protection. Mr. Kaneshiro said
that most of the Commission's land acquisitions have been along the coast; he thought that the
watershed is very important in protecting the coastal environment and in groundwater
recharge. Mr. Perry said that he talked with USDA's Mr. Tim McConnell about grants or loan
programs regarding water, and Mr. McConnell said there were lots of loans and grants out
there. Mr. Perry said this was worth checking out. The Manager-Chief Engineer said that he,
the Deputy and other engineers would be meeting tomorrow with the new head of USDA in
Hilo,to explore ways of getting loans and grants. USDA seems to think that the process of
getting funds can be speeded up; in the past,the process was painfully slow. USDA programs
like the one at Pu`ukala/Kona Ocean View mentioned earlier tie in with the Improvement
District process, and residents benefit greatly because they end up paying a fraction of what the
improvements cost. Mr. Inaba noted that two USDA people presented at the HWWA
conference.
6) Employee of the Quarter for Third Quarter 2011 —Ms.Hudman,the Customer Service
Supervisor, introduced Ms. Noyes, who joined the Department just over a year ago. She said it
is most impressive to be recognized like this after such a short time of service. Ms. Hudman
said that Customer Service is very proud to have Ms. Noyes as part of the family.
Chairperson Mukai said Ms. Noyes should be sure to attend the Board's end of the year
luncheon, among this year's Employees of the Quarter. Ms. Noyes said it was an honor to
work for DWS, and thanked the Board for the recognition.
H. CHAIRPERSON'S REPORT:
No report.
10) DISCUSSION OF PROCEDURES AND TIME FRAME TO SELECT NEW MANAGER-CHIEF
ENGINEER:
Chairperson Mukai reported that 15 or so letters were submitted to the Board from DWS employees
regarding the desired qualities for the next Manager-Chief Engineer.
Ms. Garson reported that on November 1, 2011,the nominations of two new Board members will go
before the Planning Committee of the County Council, and the nominations go for a vote in Council on
November 16, 2011. Assuming that both of the nominees are approved,they can be sworn in, in time
for the November 22, 2011 regular Board meeting. Ms. Garson said that the Board might want to
consider holding another Special Meeting in early December; otherwise the only remaining meetings
will be on November 22 and December 20.
Chairperson Mukai proposed setting up a date for a Special Meeting in December today.
Page 17 of 21 10-25-11—Water Board Minutes js
Mr. Meierdiercks proposed holding the Special Meeting on the second Tuesday of December, which
would be on December 13.
Ms. Garson said she would not be available on December 13.
Chairperson Mukai asked whether Wednesday, December 14, would be okay for the Special Meeting.
Ms. Garson said December 14 would be fine. She suggested that the Board hold back-to-back Special
Meetings, on both December 14 and December 15. She said it would depend on where the Board is in
the interview process. Even if the Board sets aside those two days, it can always cancel the second day
if it is unnecessary.
Chairperson Mukai said that December 14 is a Wednesday, and December 15 is a Thursday. If
December 15 turns out to be unnecessary,that date can be cancelled.
The Manager-Chief Engineer asked whether the interview process is considered a Public Meeting, with
the usual procedures of announcing it.
Ms. Garson said yes, an Agenda has to be posted because the entire Board is meeting.
The Manager-Chief Engineer said that might create problems trying to conduct interviews.
Ms. Garson said no, it would still be an Executive Session; it is still considered a Public Meeting.
Chairperson Mukai said yes,the Board takes public testimony at the very beginning like any Board
meeting, and then the Board goes into Executive Session.
The Manager-Chief Engineer asked whether it was the intent to have the two new Board members be
part of the interview panel.
Ms. Garson said she would assume so, and that is why she was asking for the two additional Special
Meeting days. With the new members confirmed on November 16,their first Board meeting would be
on November 22; it will be hard for them to get up to speed that first meeting.
Chairperson Mukai asked the Board if December 14 and December 15 were okay for the Special
Meetings. He asked whether the meeting location had to be decided today.
Ms. Garson said the Board could decide before November 22.
Chairperson Mukai proposed deciding on the locations now, with December 14 in Hilo and
December 15 in Kona. He said he proposed this because the members living outside of Hilo would
otherwise have to stay overnight.
Mr. Meierdiercks said he could stay overnight.
Chairperson Mukai asked what the Board's feeling was on this; he said he felt for the West Hawaii
Board members having to drive over.
The Manager-Chief Engineer said most of the Board lives in East Hawaii.
Chairperson Mukai said yes, but the two incoming Board members are from West Hawaii.
Mr. Taniguchi asked if the Special Meetings in December would be for interviews, or if they would be
just meetings.
Ms. Garson said she assumed that by that point,the Board would be interviewing.
Page 18 of 21 10-25-11—Water Board Minutes js
Mr. Taniguchi suggested waiting to see where most of the applicants are from. If all of the applicants
are from East Hawaii,there would be no sense holding interviews in West Hawaii.
Chairperson Mukai said the point was well taken.
Ms. Garson said that the location of the December Special Meetings could be set at one of the
November meetings.
Mr. Taniguchi said the Board should set the dates of the December Special Meetings now, at this
meeting.
Chairperson Mukai confirmed the dates would be December 14 and December 15.
Ms. Garson said the location is to be determined later.
The Manager-Chief Engineer asked Ms. Garson if the interview panel had to consist of the same people
throughout the interview process. In other words, if the panel starts with nine members, all of the
interview sessions would have to have all nine members in attendance.
Ms. Garson said that would be wise.
The Manager-Chief Engineer said it would be very important that everybody on the Board understands
that everybody needs to commit to the interviews.
Mr. Taniguchi asked if that was correct, or whether just the questions all need to be the same throughout
the interview process.
Ms. Garson said that the questions must be the same; she believed that it would be wise if everyone
were present for all of the interviews because the Board will need to make an assessment of the
applicants.
Mr. Greenwell said that if it is that critical that everyone be present at the interviews, the Board had
better go home and check their calendars to make sure the dates are okay.
Chairperson Mukai said in a perfect world, it would be good for everybody to be present both days of
interviews. However, if it is not possible, it is not possible.
Mr. Taniguchi asked what happens if somebody on the Board gets sick.
Chairperson Mukai said that in a perfect world, everybody should be present both days of interviews.
Mr. Taniguchi agreed with Mr. Greenwell that everybody should go back and check their calendars.
Ms. Garson said that both December 14 and December 15 will be tentatively reserved, and if
adjustments need to be made, adjustments will be made.
Mr. Taniguchi asked who the Board should notify as to their availability on December 14 and
December 15.
Ms. Garson said that Board members should notify the Secretai-v on their availability for December 14
and December 15.
Page 19 of 21 10-25-11—Water Board Minutes js
11) EXECUTIVE SESSION RE: PROCEDURES AND TIME FRAME TO SELECT NEW
MANAGER-CHIEF ENGINEER:
The Water Board anticipated convening an executive meeting, closed to the public, pursuant to Hawaii
Revised Statutes, Sections 92-4, 92-5(a)(2), 92-5(a)(4), 92-5(a)(8) and Hawaii County Charter Section
13-20(b) to discuss interview questions and the interview process for the position of Manager-Chief
Engineer, where consideration of matters affecting privacy will be involved,to deliberate or make
decisions upon matters that require the consideration of information that must be kept confidential
pursuant to state or federal law, or a court order, and for the purpose of consulting with the Water
Board's attorney on questions and issues pertaining to the Water Board's powers, duties, privileges,
immunities and liabilities. A two-thirds vote, pursuant to HRS Section 92-4, is necessary to hold an
executive meeting.
MOTION: Mr. Meierdiercks moved to go into Executive Session; seconded by Mr. Taniguchi, and
carried unanimously by voice vote.
Chairperson Mukai called a five-minute break before going into Executive Session.
The Manager-Chief Engineer asked whether he should recuse himself from the Executive Session.
Chairperson Mukai said yes, it would be best if the Manager-Chief Engineer were not present.
(Executive Session began at 11:38 a.m. and ended at 1:1 7 p.m.)
Ms. Garson said that there was a question about whether the Executive Session Minutes were always
going to be confidential. Her understanding was that the Office of Information Practices (OIP) rules say
that when the purpose for which the Executive Session was held is gone,that there is a possibility that
the Executive Session Minutes become public. In many cases, however,the purpose of the Executive
Session will last far beyond, for example,the hiring of the Manager-Chief Engineer. Ms. Garson could
not guarantee that the Executive Session Minutes would remain confidential forever; it depends on how
the OIP rules apply. However, as an example, Corporation Counsel goes into Executive Session with
the County Council at times to discuss the settlement of legal cases. Although a case might settle,
Corporation Counsel's opinion is that the details of a settlement must never become public. She noted
that no one should ever disparage other people during an Executive Session.
12) ANNOUNCEMENTS:
1. Next Regular Meeting:
The next meeting of the Water Board will be held on November 22, 2011,at 10:00 a.m. at the West
Hawaii Civic Center, Bldg. G, 74-5044 Ane Keahokalole Hwy, Kailua-Kona. (A special meeting
regarding the selection of the Manager-Chief Engineer will be held on Tuesday, November 8, 2011, at
the Department of Water Supply, Operations Conference Room, 889 Leilani Street, Hilo, HZ
2. Following Meeting:
The following meeting of the Water Board will be held on December 20, 2011, at the Department of
Water Supply, Operations Conference Room, 889 Leilam Street, Hilo, HI. (A special meeting
regarding the selection of the Manager-Chief Engineer will be held on Wednesday, December 14, 2011,
at a venue to be announced. Another special meeting regarding the selection of the Manager-Chief
Engineer is tentatively scheduled to be held on Thursday, December 15, 2011, at a venue to be
announced.)
Mr. Perry asked whether the Board could hold its December Special Meetings the week before, on the
first Tuesday of December.
Page 20 of 21 10-25-11—Water Board Minutes js
Mr. Kaneshiro said he would not be in town during the first week of December.
Chairperson Mukai said that because of a conflict, Mr. Kaneshiro would not be able to attend during the
first week of December.
Mr. Meierdiercks asked whether the first Tuesday of December was December 6.
Chairperson Mukai said that it would be Tuesday, December 6 and Wednesday, December 7. He said it
did not matter to him whether the Special Meetings were held the first or second week of December.
Mr. Taniguchi said he was okay with the first week of December,too.
Ms. Garson, noting that Mr. Kaneshiro would not be available during the first week of December, asked
the Board if it was okay if someone were absent.
Mr. Perry said that it might be difficult for him to attend a two-day session; a one-day session would be
okay.
Ms. Garson asked whether the Board could discuss this further at the Special Meeting on November 8.
By that time, it will be clear how many applicants there are, and it may be unnecessary to hold a Special
Meeting on December 15.
Chairperson Mukai agreed that for now,the Special Meeting will be set for December 14, for further
discussion.
13) ADJOURNMENT
Chairperson Mukai adjourned the meeting at 1:23 p.m.
Acting Secretary-Administrative Assistant
Anyone who requires an auxiliary aid or service for effective communication or a modification of policies or procedures to participate in this Water
Board Meeting should contact Doreen Jollimore,Secretary,at 961-8050 as soon as possible,but no later than five days before the scheduled
meeting. Notice to Lobbyists: If you area lobbyist,you must register with the Hawaii County Clerk within five days of becoming a lobbyist.
{Article 15,Section 2-91.3(b),Hawaii County Code} A lobbyist means"any individual engaged for pay or other consideration who spends more
than five hours in any month or$275 in any six-month period for the purpose of attempting to influence legislative or administrative action by
communicating or urging others to communicate with public officials." {Article 15,Section 2-91.3(a)(6),Hawaii County Code} Registration
forms and expenditure report documents are available at the Office of the County Clerk-Council,Hilo,Hawaii.
The Department of Water Supply is an Equal Opportunity provider and employer.
Page 21 of 21 10-25-11—Water Board Minutes js