My WebLink
|
Help
|
About
|
Sign Out
Home
2011-10-25 Water Board Minutes
PublicDocuments
>
Water Supply, Department of
>
Water Board
>
Minutes
>
2011 - 2015
>
2011
>
2011-10-25 Water Board Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2011 8:29:27 AM
Creation date
11/7/2011 8:28:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Arizumi to help DWS to get everything done on time. Subsequent to that conversation, Mr. Inaba <br /> will try to work something out with Mr. Arizumi,the Manager-Chief Engineer said. <br /> Mr. Inaba said that when DWS communicates with HELCO, it is usually a customer service <br /> representative who handles things, instead of the person assigned to the project. He mentioned a <br /> miscommunication whereby HELCO's field person on the Palam project got the tank site wrong. He <br /> said he will be working with Mr. Arizumi. <br /> Mr. Taniguchi said that DWS should keep in mind that the Department is HELCO's biggest customer; <br /> DWS should not be dealing with the customer service person. He said that someone higher up in <br /> HELCO should be giving DWS attention. He said that he spoke with Mr. Arizumi at the HWWA <br /> conference, and Mr. Arizumi agrees with Mr. Taniguchi. Mr. Arizumi is very customer-oriented, but <br /> HELCO should have someone higher up give its biggest customer more attention—not the customer <br /> service person. <br /> The Manager-Chief Engineer said that he had mentioned to Mr. Arizumi that DWS is indeed HELCO's <br /> biggest customer. <br /> Chairperson Mukai said that DWS should work with HELCO to get a HELCO employee dedicated <br /> only to handling DWS's requests. He said he also talked with Mr. Arizumi and got a favorable <br /> response. He noted that HELCO needs DWS, its biggest customer. <br /> The Manager-Chief Engineer agreed, and said that DWS should give Mr. Arizumi a heads-up when a <br /> project is coming up so that Mr. Arizumi can push from his side. He said that Mr. Arizumi apologized <br /> a lot for the delays, about which he was unaware. <br /> Mr. Okamoto said Mr. Inaba was trying to set up a meeting with HELCO to find out who can be <br /> dedicated to DWS's projects. That person will be invited to DWS's pre-bid and pre-construction <br /> meetings. <br /> ACTION: Motion carried unanimously by voice vote. <br /> 6) HILO: <br /> A. JOB NO. 2002-802, CONSTRUCTION OF THE PI`IHONUA RESERVOIR NO. 2 <br /> REPLACEMENT: <br /> The contractor, Isemoto Contracting Co, Ltd., has requested a 139-calendar day time extension. This <br /> request consists of additional time to take delivery of the Motor Control Center(MCC) equipment, <br /> complete the installation, and make the system operational, and then demolish the existing water tank <br /> and appurtenances. <br /> Subsequent to the first time extension request, further revisions were required prior to manufacturing <br /> the MCC. This was the main factor behind the delay of delivery of the MCC. <br /> Staff has reviewed the request and finds the 139 calendar days are justified. <br /> This is the second time extension request. <br /> Ext From(Date) To (Date) Days Reason <br /> # (Calendar) <br /> 1 12/28/2010 11/8/2011 315 Days required to order the MCC, and <br /> complete the remainder of the project <br /> including demolition of the existing <br /> Page 7 of 21 10-25-11—Water Board Minutes js <br />
The URL can be used to link to this page
Your browser does not support the video tag.