My WebLink
|
Help
|
About
|
Sign Out
Home
2011-10-25 Water Board Minutes
PublicDocuments
>
Water Supply, Department of
>
Water Board
>
Minutes
>
2011 - 2015
>
2011
>
2011-10-25 Water Board Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2011 8:29:27 AM
Creation date
11/7/2011 8:28:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Perry asked if he was correct in thinking that the security of the MCC is related to one door. He <br /> asked if the door would be adequate. He asked whether there would also be fencing. <br /> Mr. Inaba said the metal door will be adequate. There will be a fence, but someone can jump over it, he <br /> said. DWS wants to have the site as visible as possible, without bushes that would shield trespassers. <br /> The Manager-Chief Engineer said that in some cases in the past,the MCC would be put in through the <br /> roof by a crane after the doors were installed, because the concerns about security were so great. The <br /> MCC is really expensive equipment, he said. <br /> ACTION: Motion carried unanimously by voice vote. <br /> 7) NORTH KONA: <br /> A. KOHANAIKI REIMBURSEMENT AGREEMENT-- QUEEN KA`AHUMANU HIGHWAY <br /> WIDENING, PHASE 2: <br /> (This Item was covered earlier in the meeting.) <br /> B. JOB NO. 2003-823, PALANI ROAD TRANSMISSION WATERLINE (MAMALAHOA HWY <br /> TO PALANI NO. 2 RESERVOIR): <br /> The contractor, CTS Earthmoving, Inc., has submitted a request for a contract time extension of twenty <br /> (20)work days, due to a delay by HELCO, which is being caused by a lack of available materials. <br /> This would be the fourth time extension to the contract. <br /> If approved,the contract completion date will be extended from October 31, 2011 until November 30, <br /> 2011. Engineering staff has reviewed the request, and finds that the twenty(20) work day time <br /> extension is a reasonable request by the contractor to allow HELCO to obtain materials, get on site and <br /> complete their work, as well as allow the electrical subcontractor finish their work after HELCO is <br /> done. <br /> Extension From(Date) To (Date) Days (Work) Reason <br /> 1 8/21/11 9/07/11 12 Add'1 Work request <br /> by DWS <br /> 2 9/07/11 9/29/11 16 Add'1 Work request <br /> by DWS <br /> 3 9/29/11 10/31/11 33 Add'1 Work(DWS) <br /> &HELCO DELAY <br /> 4 10/31/11 11/30/11 20 HELCO DELAY <br /> (Materials) <br /> Total Work Days 81 <br /> (incl.this ext.) <br /> The Manager-Chief Engineer recommended that the Board grant this extension of contract time of <br /> twenty(20) calendar days,to CTS Earthmoving, Inc., for JOB NO. 2003-823, PALANI ROAD <br /> TRANSMISSION WATERLINE (MAMALAHOA HWY TO PALANI NO. 2 RESERVOIR). <br /> MOTION: Mr. Meierdiercks moved to approve; seconded by Mr. Greenwell. <br /> Mr. Beck said that HELCO has received the materials, but they are already three weeks behind <br /> schedule. However,the project is going forward, he added. <br /> Page 9 of 21 10-25-11—Water Board Minutes js <br />
The URL can be used to link to this page
Your browser does not support the video tag.