Laserfiche WebLink
<br />REPORT OF CHANGE ORDERS AUTHORIZED <br />FOR THE PERIOD OF: 11/1/11-11/15/11 <br />Legend: <br />Change Order <br />CO <br />Supplemental Agreement <br />SA <br />Professional Services <br />PS <br />Construction <br />C <br />Price Term Agreement <br />PTA <br />Other Goods & Services <br />GS <br />OriginalOriginal % ofCummulative% of <br />ExecutionJob Contract ProjectContractDept.ContractContractCO/SACO/SAOrigCO/SAOrigContractorProjectProjectPurpose <br />Date##TitleTypeAmountDateNo.AmountContTotalContManagerStatus <br />Drywell location changed due to <br />Kason <br />conflicting site conditions. Additional <br />Waimea ADA <br />Pacheco - <br />Goodfellow <br />Sidewalks and Ramps, drilling required to penetrate through <br />11/15/2011E-3761C.003049CDPW$696,490.002/15/20112$41,000.005.89%$55,595.497.98%Open <br />Bros, Inc.Engineering <br />Mamalahoa Hwy.thick rock layer that was discovered. <br />Division <br />Eligible for 100% Federal Funding. <br />Removal of non-compliant ADA curb <br />ramp which will be re-constructed to <br />Waimea ADA Kason <br />ADA standards, resulted from FHWA <br />Sidewalks and Pacheco - <br />Goodfellow <br />11/15/2011E-3761C.003049CDPW$696,490.002/15/20113$22,585.983.24%$78,181.4711.23%Open <br />site visit. Reconstruction of catch <br />Ramps,Mamalahoa Bros, Inc.Engineering <br />basin top to be constructed to ADA <br />Hwy.Division <br />standards. Eligible for 100% Federal <br />Funding. <br />Implementation of Office of Hawaii <br />Clarysse Time extension for providing <br />11/15/2011RFP-2643C.003058GS$94,695.002/7/20111$0.000.00%$0.000.00%Open <br />Underage Drinking ManageAcademy of <br />Nunokawaservices, through 3/31/12. <br />Prevention ProgramsmentArts & Science <br />Hamakua <br />Implementation of Office of <br />Clarysse Time extension for providing <br />Youth <br />Underage Drinking Manage <br />11/15/2011RFP-2643C.003040GS$91,799.002/7/20111$0.000.00%$0.000.00%Open <br />Nunokawaservices, through 3/31/12. <br />Foundation, <br />Prevention Programsment <br />Inc. <br />The Institute for <br />Implementation of Office of <br />Clarysse Time extension for providing <br />Family <br />Underage Drinking Manage <br />11/15/2011RFP-2643C.003039GS$78,541.002/7/20111$0.000.00%$0.000.00%Open <br />Nunokawaservices, through 3/31/12. <br />Enrichment, <br />Prevention Programsment <br />LLC. <br />Implementation of Office of <br />University of Clarysse Time extension for providing <br />11/15/2011RFP-2643C.003059GS$59,759.003/1/20111$0.000.00%$0.000.00%Open <br />Underage Drinking Manage <br />Hawaii @ HiloNunokawaservices, through 3/31/12. <br />Prevention Programsment <br /> <br />