My WebLink
|
Help
|
About
|
Sign Out
Home
Impact Fee Ord_Duncan Draft_ 9_15_06
PublicDocuments
>
Planning Department
>
General Planning Department Information
>
IPFNA
>
IPFNA Study
>
Impact Fee Ord_Duncan Draft_ 9_15_06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2011 11:17:08 AM
Creation date
12/21/2011 11:17:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT <br />(i) The police impact fees shall be calculated according to the following formula. <br />FEE=EDUs x NET COST/EDU <br />Where: <br />EDUs = UNITS X EDUs/UNIT <br />UNITS= Number of dwelling units of each housing type in the <br />development or thousands of square feet of nonresidential <br />buildings of each land use type <br />EDUs/UNIT= Equivalent Dwelling Units represented by one dwelling unit of <br />a given housing type or 1,000 square feet of nonresidential <br />floor area of a given land use type. Calculated as the ratio of <br />the functional population per dwelling unit or per 1,000 <br />square feet to the functional population of the typical single- <br />family detached unit. For residential development, functional <br />population per unit is one-half the average household size for <br />that housing type. For nonresidential development, the <br />functional population per unit is determined by the following <br />formula: <br />Functional population/1000 sf = (employee hours/1000 sf + <br />visitor hours/1000 sf) ÷ 24 hours/day <br />Where: <br />Employee hours/1000 sf = employees/1000 sf x 10 hrs/day <br />Visitor hours/1000 sf = visitors/1000 sf x 1 hour/visit <br />Visitors/1000 sf = weekday ADT/1000 sf x avg. vehicle <br />occupancy - employees/1000 sf <br />Weekday ADT/1000 sf = one-way average daily trips (total <br />trip ends ÷ 2) <br />NET COST/EDU= COST/EDU - CREDIT/EDU <br />COST/EDU= Total replacement cost of existing police facilities divided by <br />total existing residential and nonresidential development in <br />the county, expressed in terms of EDUs <br />CREDIT/EDU= DEBT/EDU + PAST/EDU + GRANT/EDU <br />DEBT/EDU= Outstanding debt on existing police facilities divided by total <br />existing EDUs <br />PAST/EDU=The net present value of property taxes paid over the last five <br />years by vacant land for police capacity improvements, <br />including general fund expenditures as well as debt service <br />payments, per EDU <br />GRANT/EDU= The net present value of future Federal and State grant <br />funding anticipated to be forthcoming per EDU over the next <br />20 years <br />Draft Hawaii County Impact Fee Ordinance Duncan Associates, September 15, 2006, p. 12 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.