My WebLink
|
Help
|
About
|
Sign Out
Home
Draft Ord_Bill 324_Hoffmann_2008COM 1329 015 2006-2008
PublicDocuments
>
Planning Department
>
General Planning Department Information
>
IPFNA
>
County Council Bills
>
2008 Effort
>
Draft Ord_Bill 324_Hoffmann_2008COM 1329 015 2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2011 9:02:14 AM
Creation date
12/21/2011 1:22:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 36.14. Independent fee calculation formulae. <br />(a) The independent fee calculation study shall be based on the same service standards and <br />unit costs for facilities used in the needs assessment study (as adjusted by the same cost <br />inflation factors used in a.nhual adjustments since the study was prepared), and shall <br />document the methodologies and assumptions used. <br />(b) An independent fee calculation study submitted for the purpose of calculating a road <br />impact fee may be based on data, information or assumptions from independent sources, <br />provided that: <br />(1) The independent source is an accepted standard source of transportation <br />engineering or planning data; or <br />(2) The independent source is a local study on trip characteristics carried out by a <br />qualified transportation planner or engineer pursuant to an accepted methodology <br />of transportation planning or engineering. <br />(c) The independent fee calculation is the sum of the road impact fees, the park impact fees, <br />the fire/EMS impact fees, police impact fees, and solid -waste impact fees. The formulae <br />for calculation of these fees are listed below. <br />(1) The road impact fees shall be calculated according to the following formula: <br />ROAD IMPACT FEE = VMT x NET COSTIVMT <br />Where: <br />VMT <br />= <br />TRIPS x % NEW x LENGTH <br />NET CGSTIVMT <br />= <br />COSTNMC x VMCNMT - CREDITIVl1 T <br />TRIPS <br />— <br />Trip ends during an average weekday <br />% NEW <br />= <br />Percent of trips that are primary trips, as opposed to pass-by or <br />diverted -link trips <br />LENGTH <br />= <br />Average length of a trip on the major roadway facilities <br />2 <br />-= <br />Avoids double-counting trips for origin and destination <br />COSTNMC <br />Average cost to add a new daily vehicle -mi' le of capacity <br />VMCNMT <br />— <br />System -wide ratio of VMC to VMT on the maj or roadway <br />facilities (assumed 1:1) <br />REDITIVMT <br />= <br />DEBTNMT + PASTIVMT + GRANTNMT <br />DEBTIVMT <br />— <br />Outstanding debt used for capacity improvements on existing road <br />facilities divided by total existing VMT <br />PASTNMT <br />— <br />The net present value of property taxes paid over the last five years <br />by vacant land for road capacity improvements, including general <br />fund expenditures as well as debt service aments, per VMT <br />GRANTIVT <br />= <br />The net present value of future Federal and State roadway capacity <br />funding anticipated to be forthcoming per VMT over the next 20 <br />years <br />r <br />f <br />Y <br />• R <br />
The URL can be used to link to this page
Your browser does not support the video tag.