My WebLink
|
Help
|
About
|
Sign Out
Home
Draft Ord_Bill 324_Hoffmann_2008COM 1329 015 2006-2008
PublicDocuments
>
Planning Department
>
General Planning Department Information
>
IPFNA
>
County Council Bills
>
2008 Effort
>
Draft Ord_Bill 324_Hoffmann_2008COM 1329 015 2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2011 9:02:14 AM
Creation date
12/21/2011 1:22:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9. Bill 324, the table associated with section 36- 14(c)(3), specifically EDUsIUNIT, is <br />amended to read as follows: <br />"(3) The fire/EMS impact fees shall be calculated according to the following formula: <br />FIRE/EMS IMPACT FEE = EDUs x NET COST/EDU <br />Where: <br />EDUs <br />= <br />UNITS X EDUA NIT <br />UNITS <br />= <br />Number of dwelling units of each housing type in the development <br />or thousands of square feet of nonresidential buildings of each <br />land use type <br />Equivalent Dwelling Units represented by one dwelling unit of a <br />EDUA NIT <br />= <br />given housing type or 1,000 square feet of nonresidential floor <br />area of a given land use type, ftked] calculated as the ratio <br />of the functional population per dwelling unit or per 1,000 square <br />feet to the functional population of the typical single family <br />detached u.nit[;l: <br />For residential development, functional population per unit is one - <br />half the average household size for that housing type <br />For nonresidential development, the functional population per unit <br />is determined by the following formula: <br />Functional population/1000 sf = (employee hours/ 1000 sf + visitor. <br />hours/ 1000 sf) - 4 hours/day <br />Where: • <br />Employee hours11000 sf = employees/1000 sf x 10 hrslday <br />Visitor hours/ 1000 sf = visitors/1 000 sf x 1 hour /visit <br />Visitors / 1000 sf = weekday ADT11 000 sf x avg, vehicle <br />occupancy - emploees11000 sf <br />Weekday ADT11000 sf = one -moray average daily trips (total trip <br />ends—.* 2) <br />NET COSPEDU <br />= <br />COST/EDU - CREDIVEDU <br />OSPEDU <br />= <br />Total replacement cost of existing fire/EMS facilities divided <br />by total existing residential and nonresidential development <br />in the County, expressed in terms of EDU <br />EDITIEDU <br />= <br />DEBT/EDU + PAST/EDU + GRANT/EDU <br />DEBT/EDU <br />= <br />Outstanding debt on existing fire/EMS facilities divided by <br />total existing EDUs <br />PAST/EDU <br />= <br />The net present value of property taxes paid over the last five <br />years by vacant land for fire/EMS capacity improvements, <br />including general fund expenditures as well as debt service <br />payments, per EDU <br />GRANT/EDU <br />= <br />The net present value of future Federal and State grant <br />funding anticipated to be forthcoming per EDU over the next <br />20 years" <br />
The URL can be used to link to this page
Your browser does not support the video tag.