My WebLink
|
Help
|
About
|
Sign Out
Home
2012-01-15 Report of Change Orders Authorized
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Authorized Change Orders Reports
>
2012
>
2012-01-15 Report of Change Orders Authorized
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2012 8:34:57 AM
Creation date
2/7/2012 8:34:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPORT OF CHANGE ORDERS AUTHORIZED <br />FOR THE PERIOD OF: 1/1/12-1/15/12 <br />OriginalOriginal % ofCumulative% of <br />ExecutionJob Contract ProjectContractDept.ContractContractCO/SACO/SAOrigCO/SAOrigContractorProjectProjectPurpose <br />Date##TitleTypeAmountDateNo.AmountContTotalContManagerStatus <br />New Park Site Inclement weather and unworkable <br />Ludwig <br />Kevin Sakai, <br />Development at conditions; addressing safety <br />Construction, <br />1/11/2012B-3731C.003116CDPW$629,825.345/19/20111$18,638.002.96%$18,638.002.96%Open <br />P&R <br />Machado Acres concerns arising after design; <br />Inc. <br />Subdivisionmaintenance issues modifications. <br />Carvalho Park & <br />Site Replacement of subfloors at <br />Jeff Ochi, <br />Piihonua Gym <br />Engineering restrooms due to hidden damage of <br />1/11/2012B-3650C.003180CDPW$793,000.006/15/20113$13,005.001.64%$20,253.002.55%Open <br />P&R <br />Accessibility <br />Inc.termites and moisture-related rot. <br />Improvements <br />Total # ofTotal Original Contract <br />Total CO/SA <br />9$4,187,649.349 <br />ContractsAmount <br />for Period <br />Total CO/SA <br />$117,032.00 <br />Amount for Period <br />
The URL can be used to link to this page
Your browser does not support the video tag.