Laserfiche WebLink
TECHNICAL MEMORANDUM CH2MHILL <br />Hawai'i County Mechanical - Biological Treatment <br />Facility Conceptual Design <br />PREPARED FOR: Mike Dworsky, Solid Waste Division Chief, County of Hawai i <br />PREPARED BY: Scott Gamble, CH2M HILL <br />Ron Alexander, Alexander and Associates <br />DATE: May 12, 2009 <br />PROJECT NUMBER: 37412$.11.01 <br />Introduction <br />As outlined in the draft Residuals Management Chapter of the County of Hawaii Integrated <br />Resources and Solid Waste Management Plan (IRSWMP) Update, there is enough operating <br />history within Europe and North America for the County of Hawaii to evaluate the potential <br />for developing one or more mechanical- biological treatment (MBT) facilities to process solid <br />wastes generated by island residents and businesses. <br />This memorandum assumes that two MBT facilities would be developed: one in East Hawaii at <br />the South Hilo Sanitary Landfill (SHSL) site, and a second facility at the West Hawaii Sanitary <br />Landfill (WHSL) site. Conceptually, both facilities would accept and process municipal solid <br />waste (MSW) from the existing transfer station network and from commercial sources on the <br />island. <br />In response to discussions and the need for further analyses around how mechanical - biological <br />treatment of MSW could be integrated into the IRSWMP, CH2M HILL has prepared this <br />conceptual design report for the two- facility concept. The purpose of the conceptual design <br />report is to: <br />• Provide a summary of the current and estimated future waste tonnages available for <br />diversion through the facilities. <br />• Outline the performance and functional requirements for the two facilities including the <br />identification of the appropriate processing technology and equipment requirements, <br />environmental protection measures, nuisance controls, product quality, and product market <br />issues. <br />• Develop conceptual layouts for each facility. <br />• Develop order -of- magnitude capital cost estimates for each facility. <br />