My WebLink
|
Help
|
About
|
Sign Out
Home
2012-05-17 Leeward Exh C - Deluz Trucking
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2012
>
2012-05-17 Leeward Exh C - Deluz Trucking
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2012 3:01:15 PM
Creation date
6/21/2012 3:01:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />GIFFIN: And your names, please, beginning with you, Kevin. <br /> <br />BALOG: Kevin Balog, P.O. Box 368 Pa‘auilo, Hawai‘i 96776. <br /> <br />GIFFIN: Thank you. And you, sir? <br /> <br />HAITSUKA: My name is Ed Haitsuka. I’m an attorney for the applicant. My address is 75-1000 <br />Henry Street, Suite 209, Kailua-Kona, Hawai‘i. <br /> <br />GIFFIN: Thank you very much. Is there anything, sir -? I don’t know, Kevin, you’re going to <br />speak or -. Okay, you’re -. Sir, would you like to add anything that have been presented by Jeff <br />from our staff? <br /> <br />HAITSUKA: The only thing I would add further is that the applicant has been working with a soils <br />engineer, the applicant has an established relationship with Construction Engineering Labs, that the <br />applicant has met with a representative who has been assigned to do the soils engineering report and <br />study. A site inspection has been conducted, or site inspections have been conducted. And then <br />unfortunately, during this process, it’s my understanding that the person who was assigned to this <br />project was called away to do a report for a quarry out in Ocean View, and that that particular <br />project has been completed, or is near completion. And we have been assured by Construction <br />Engineering Labs that they are going to give every effort to get the report that we need. <br /> <br />GIFFIN: Thank you. Kevin, I know that you are ma‘a enough to know that you’ve checked all of <br />the conditions as proposed by the Planning Director? <br /> <br />BALOG: Yes. <br /> <br />GIFFIN: Do you have any questions or anything you would like to add? <br /> <br />BALOG: No. <br /> <br />GIFFIN: Thank you. Commissioners, is there anything you would like to ask the applicant? Is <br />there something you would like to add, sir? <br /> <br />HAITSUKA: No. Kevin was asking me about the Planning Director’s recommendation that, we <br />had initially requested an extension to June 30, 2012 -. <br /> <br />GIFFIN: Right. <br /> <br />HAITSUKA: But the Planning Director’s recommendation was to carry that one more year just for <br />unforeseen circumstances. And we would, of course, agree with the Planning Director’s <br />recommendation, given what we have experienced so far. <br /> <br />GIFFIN: Sure, sure. So, any other comments, questions, Commissioners? Hearing none, do I hear <br />a motion? <br /> <br />IOKEPA: Madam Commissioner? <br /> <br />3 <br />EXHIBIT C <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.