Laserfiche WebLink
REPORT OF CHANGE ORDERS AUTHORIZED <br />FOR THE PERIOD OF: 6/1/12-6/15/12 <br />OriginalOriginal % ofCumulative% of <br />ExecutionJob Contract ProjectContractDept.ContractContractCO/SACO/SAOrigCO/SAOrigContractorProjectProjectPurpose <br />Date##TitleTypeAmountDateNo.AmountContTotalContManagerStatus <br />Reconstruction of additional <br />pavement sections initially weakened <br />Mamalahoa Highway <br />from earthquake and further <br />Isemoto Ben Ishii <br />Earthquake Repairs. <br />Contracting Co Engineering deteriorated; allow for price <br />6/13/2012P-3780C.002678CDPW$4,269,280.001/5/20106$218,351.255.11%$490,111.8111.48%Open <br />Federal Aid Project No. <br />Ltd.Divisionadjustment of short supply materials; <br />ER-15(9) <br />additional time required for additional <br />excavation and additional paving. <br />To address hidden structural damage <br />Waimea Park Ballfield Jeff Ochi, <br />to light poles' bases and ensure their <br />6/13/2012PR-4080C.003320CDPW$164,000.0010/14/20112$3,498.542.13%$19,003.6911.59%E Ten, Inc.Open <br />Lights ReplacementP&R <br />integrity upon reinstallation. <br />Total # ofTotal Original Contract <br />Total CO/SA <br />9$36,542,015.749 <br />ContractsAmount <br />for Period <br />Total CO/SA <br />$675,791.22 <br />Amount for Period <br />