HawaiÒi County Fire Commission <br />Minutes of July 11, 2012 <br />Page 2 <br />funds for additional apparatus if monies were left over. Some of the balance was <br />due to vacancies. Of the balance, they still have to pay out on the apparatus <br />leases. There will be some carryover from 2012 to 2013. Their goal is to get fleet <br />replacement as a line item in the next budget. <br />FY 2012-2013: <br /> The budget reflected 1.8% increase which included two additional <br />Class A pumpers. <br />ALTERNATIVE FUNDING AND GRANTS <br /> <br />FY 2011 CDBG Grant for Pahoa Apparatus: <br /> They expect completion in mid <br />September to early October at the Pierce Manufacturing Plant in Wisconsin. <br />FY 2012 CDBG Grant for Pahoa Tanker: <br /> The bid specifications were completed <br />and will be sent to purchasing shortly. <br />FY 2011 SAFER Grant: <br /> This grant is for additional 32 positions. If 2011 grant <br />application is not approved, they apply for the 2012 grant. <br />FY 2012 Assistance to Fire Firefighters Grant Application: <br /> The application <br />period ended last week. They submitted applications for an ambu <br />CPR devices, and fire fighter ground survival course. The total grant is upwards of <br />$300,000, of which 70% is federal funding and 30% is matching. <br />Capital Improvement Projects <br /> <br /> Makalei Fire Station: They put in orders for things such as lockers, bedding, <br />and kitchen supplies and are waiting delivery. A punch list sti <br />completed. Issues between the outside contractor and the utility have been <br />resolved. They do not want to occupy the building until it is turned over to them <br />officially. They are on budget. <br /> <br /> KaÓu Public Safety Package: The tower for PunaluÒu was delivered and is <br />working well. They will be able to stow most of the equipment in the tower. <br />The second part of this package was the two volunteer garages structures. <br />That bid was finally awarded. They are finalizing the contract with the <br />awardee, and hopefully they will start construction soon. <br /> <br /> Hpuna Water Safety Tower: The tower was delivered. It is currently at the <br />South Kohala fire station. Battalion Chief Kosaki is working on <br />tower on the beach. They want it in an area owned by the Hpuna Prince <br />Hotel. ThereÓs a lot of permitting involved. If they put it on State land, it will be <br />right next to an existing tower (not desired). They prefer to locate it on the far <br />north portion of the State beach so it would give a view of the portion of the <br />beach fronting the hotel. The hotel does not provide lifeguard services for the <br />area. The tower was paid with CIP funding. For manpower, they will just move <br /> <br />