My WebLink
|
Help
|
About
|
Sign Out
Home
2013-01-31 Report of Change Orders Authorized
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Authorized Change Orders Reports
>
2013
>
2013-01-31 Report of Change Orders Authorized
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2013 4:16:09 PM
Creation date
2/21/2013 4:16:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPORT OF CHANGE ORDERS AUTHORIZED <br />FOR THE PERIOD OF: 1/16/13-1/31/13 <br />OriginalOriginal % ofCumulative% of <br />ExecutionJob Contract ProjectContractDept.ContractContractCO/SACO/SAOrigCO/SAOrigContractorProjectProjectPurpose <br />Date##TitleTypeAmountDateNo.AmountContTotalContManagerStatus <br />Reed's Island Bridge Abhe & Cres Revise contractor field office <br />1/28/2013E-4069C.003601CDPW$6,392,990.008/13/20121$0.000.00%$0.000.00%Open <br />Structural Rehab.Svoboda Inc.Rambayonrequirements. <br />Body Removal Dodo Mortuary <br />1/31/2013IFB2751N/APTAHPD$0.0012/1/20111$0.000.00%$0.000.00%Nori IshiiOpenExtend contract for option year. <br />Services for HPDInc. <br />Mo'oheau Park To correct, modify and adjust the <br />Site Engineering James <br />1/31/2013B-3649C.003608CDPW$660,300.008/9/20121$3,430.670.52%$3,430.670.52%Open <br />Accessibility existing site conditions and <br />Inc.Imanaka <br />Improvementsunforeseen building conditions. <br />North Peck Road <br />Site Engineering Cres Revise item quantities to match <br />1/31/2013E-4112C.003628CDPW$31,900.009/20/20121-$9,583.34-30.04%-$9,583.34-30.04%Open <br />Bridge Rehabilitation, <br />Inc.Rambayonactual field measurements. <br />Bridge No. 18-3 <br />Planning, Design and <br />Isemoto <br />Casey Time extension and the relocation of <br />Construction of Island <br />1/31/2013E-4066BC.003315CDPW$599,000.0010/10/20113$20,282.753.39%$81,261.9613.57%Contracting Co Open <br />Yanagiharaitem no. 7 bus stop and bus shelter. <br />Wide Bus Stops and <br />Ltd <br />Shelters, Part B <br />Hamakua Community PBR Hawaii and Christian Contact extension for an additional <br />1/31/2013n/aC.002803PSPlanning$411,000.006/16/20101$0.000.00%$0.000.00%Open <br />Development PlanAssociates, Inc.Kayyear and revised scope of services. <br />Green Aina Funding increase and time <br />Christian <br />1/31/2013N/AC.001862Northeast Hawai‘i CDPPSPlanning$25,000.007/8/20084$13,305.0053.22%$63,305.00253.22%Planning and Openextension to support the completion <br />Kay <br />Engineering LLCof Hamakua CDP. <br />Provider of Juvenile <br />To extend the contract period to <br />1/31/2013n/aC.003293GSPros. Atty.$50,000.009/13/20111$26,173.0052.35%$76,173.00152.35%Hale Kipa, Inc.Lee LordOpen <br />Services to Offenders <br />4/13/13. <br />and their Families <br />Total # ofTotal Original Contract <br />Total CO/SA <br />15$8,305,179.3115 <br />ContractsAmount <br />for Period <br />Total CO/SA <br />$166,158.08 <br />Amount for Period <br />
The URL can be used to link to this page
Your browser does not support the video tag.