My WebLink
|
Help
|
About
|
Sign Out
Home
AC-PD 2013-14 CIP Budget Requests-Supplimental
PublicDocuments
>
Planning Department
>
Action Committees (AC)
>
Puna Community Development Plan Action Committee
>
Pre-2018 Files
>
Communications from AC
>
2013
>
AC-PD 2013-14 CIP Budget Requests-Supplimental
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2013 3:55:25 PM
Creation date
3/14/2013 3:50:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
County of Hawaii <br />PROJECT DATA /FINANCIAL IMPACT STATEMENT <br />Fiscal Year 2013 to 2014 <br />1. DEPARTMENT AND DIVISION: Planning Department 2. DATE: 3/13/2013 <br />3. PROJECT NAME: Volcano Village Center Master Plan 4. SUBMITTER: Puna CDP Action Committee (Larry Brown) <br />5. COUNCIL BENEFIT DISTRICT(S): 6 6. TMK /JUDICIAL: Various /Puna & Kau <br />7. LOCATION (COUNCIL DISTRICT): 6 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $100,000 <br />9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Planning, feasibility, or design studies. <br />10. PROJECT /PROGRAM DESCRIPTION: Create a Master Plan for the Volcano Village Center through a public participation process together with the Volcano Community Association. Sections 3.1.3.b.2) <br />& 2.1.3.a.1) of the Puna CDP identifies Volcano as a Village Center with a historic core and proposed for designation as a Special Design District with detailed planning, design standards and review <br />procedures. Sec. 2.2.3.a further calls for a separate biosphere buffer reserve overlay district for the Volcano area. Sec. 5.2.3 calls for the preparation of regional town center or village center plan to <br />define land uses, design themes and architectual and site design standards. <br />11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety through a strategic plan that will identify necessary improvements to basic infrastructure necessary to <br />support the appropriate levels of service; enhances quality of life for residents and visitors alike by defining a sustainable, walkable, and liviable town center based on the vision of its people. <br />12. LONG RANGE PLANS /COMMUNITY VALUES: General Plan, Sec. 15.1; Puna CDP, Sec. 3.1.3.b.2), 2.1.3.a.1), 2.2.3.a. and 5.2.3. <br />13. COUNTY MATCHING FUNDS REQ'D? (Y /N) No DESCRIBE: IF 1 <br />14. LEGAL MADATE? (Y /N) No DESCRIBE: IF- <br />15. IMPACT ON OPERATIONAL BUDGET: <br />16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitatlity, strengthens and sustains our community, promotes heatlh and safety, manages growth and fosters inter - departmental <br />collaboration and cross - sector implementation. <br />17. PROJECT READINESS (List all that apply): Currently underway (grass roots effort minimally supported by existing Planning Dept. staff without specific budget; status of work includes community <br />survey, beginning of asset mapping, conceptual draft elements in public review process; CDP project manager available to manage project; able to identify and contract with appropriate consultant(s) <br />18. EXPENDITURE PHASING (X $1000): <br />Prior Funds <br />Allotted <br />(not lapsed) <br />This FY 13 -14 <br />Request <br />FY 14 -15 <br />FY 15 -16 <br />FY 16 -17 <br />FY 17 -18 <br />FY 18 -19 <br />Beyond 6 <br />Years <br />TOTAL: <br />Planning <br />Land Acquisition <br />Design /Survey <br />Construction <br />100 <br />$100 <br />TOTAL: <br />$100 <br />$100 <br />119. O & M COSTS (x $1000): <br />F <br />F <br />20. FUNDING SOURCE (x $1000): <br />Cty G.O. Bond /Other <br />100 <br />$100 <br />State Revolving Fund <br />State CIP <br />Federal (including ARRA - Stimulus) <br />Private (Grants) <br />CBA (Fair Share, Park Dedication, etc) <br />TO <br />F $100 <br />$1001 <br />CIP 2013 -14 FIS Templates.xlxs Revised October 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.