My WebLink
|
Help
|
About
|
Sign Out
Home
2013-35 HPP Pathways Master Plan June 2013 Final
PublicDocuments
>
Planning Department
>
Action Committees (AC)
>
Puna Community Development Plan Action Committee
>
Pre-2018 Files
>
Communications to AC
>
2013
>
2013-35 HPP Pathways Master Plan June 2013 Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2013 11:28:06 AM
Creation date
7/2/2013 11:08:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HPP Pathways Master Plan <br />June 2013 <br />Implementation <br />Implementation of this HPP Pathways Master Plan will take place in multiple phases. <br />The content of each phase will be determined by prioritization of certain areas, funding <br />availability, cost estimates, and community input. <br />The first phase toward completing the HPPOA Pathways Master Plan is developing a <br />Multi -Use Non - Motorized Lane along Paradise Drive from Highway 130 to Beach Rd., a <br />distance of 4.3 miles (denoted in blue, Figure 1). Paradise Dr. was chosen for priority <br />Phase I development for a few reasons: 1) It is a central road in HPP, 2) the roadway <br />right of way is relatively clear of rock, ditches, and trees that would need to be cleared <br />or filled for path development (when compared to Maku'u, Kaloli and Shower Drives), <br />thus reducing cost, and 3) It is a direct connection between highway 130 and the coastal <br />County Park. <br />Development of this Phase 1 plan is currently underway. The preliminary cost estimate <br />of Phase 1 is $524,533.33, a per mile cost of $121,984.50. To clear and grub the right <br />of way, then install the base course costs $277,493.33. To apply the finished chip seal <br />surface costs $277,040.00. Supplies, signs, and striping cost an additional $20,000.00. <br />While the HPPOA Board of Directors has approved the first phase concept, the funding <br />of this first phase is currently a work in progress. <br />Conclusion <br />According to the Hawaiian Paradise Park Community Master Plan (2005), " HPPOA <br />embraces the construction of pedestrian walkways and bicycle paths throughout the <br />subdivision." Making this idea a reality has been the work of many residents since the <br />original writing of the HPP Community Master Plan. The HPP Pathways Master Plan is <br />the culmination of that work. As a growing community, we must develop pathways that <br />will increase access for walking and biking activities. As residents collaborate and plan <br />to create this network of pathways, people of all ages will finally be able to travel safely <br />throughout Hawaiian Paradise Park. By adding this new Pathways Plan to the HPPOA <br />Master Plan, we are providing a detailed plan for safe biking and walking in one of the <br />largest residential areas in the County of Hawaii. In this way, HPPOA can demonstrate <br />to the general community and funding groups a rational plan for improving safety and <br />wellness for our island community. <br />
The URL can be used to link to this page
Your browser does not support the video tag.