My WebLink
|
Help
|
About
|
Sign Out
Home
2013-33 LB-AC Third Progress Report
PublicDocuments
>
Planning Department
>
Action Committees (AC)
>
Puna Community Development Plan Action Committee
>
Pre-2018 Files
>
Communications to AC
>
2013
>
2013-33 LB-AC Third Progress Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2013 1:56:49 PM
Creation date
7/2/2013 1:55:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PCDP Goal, Objective & Action Items <br />Progress Update <br />45 mph between the Kea`au Bypass and <br />& Hwy. 130 intersection completed. <br />`Ainaloa Boulevard; <br />• HDOT presented design for roundabout at <br />intersection of Pahoa Village Rd. and Hwy. <br />130 at Malama Marketplace. Public and <br />county concerns with initial design were <br />significantly addressed in redesign. <br />• At the urging of S en. Russell Ruderman, <br />HDOT reduced the speed limit on Hwy. 130 <br />to 45 mph between Shower Dr. and `Ainaloa <br />Blvd. <br />4.5.3 f. Improve Highway 137 (Red Road) <br />. KAPONO is applying to the state DOT for <br />as a scenic corridor... <br />designation of the Red Road as a Scenic <br />Byway. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.