My WebLink
|
Help
|
About
|
Sign Out
Home
AC Minutes 13Aug2013 DRAFT
PublicDocuments
>
Planning Department
>
Action Committees (AC)
>
Puna Community Development Plan Action Committee
>
Minutes
>
2013
>
AC Minutes 13Aug2013 DRAFT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2013 4:14:10 PM
Creation date
8/26/2013 4:05:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
outcomes of the fair. She also reported on a request from DPW for a list of roadway <br />connection projects in Puna. <br />2. Mass Transit Subcommittee (MTSC). <br />Marty Mimmack submitted a written report being the minutes for the MTSC meetings held on <br />July 23 and reported on a few highlights from the meeting. <br />3. Mountain View Village Center Plan Update. <br />Frank Commendador reported that about 12 regular participants are en aged in the Mt. View <br />planning effort. The geographic planning area is from Kukui Camp Roa mauka to North and <br />South Glenwood Roads. On line community surveys using Survey Monkey and a separate <br />survey of elementary to high school students have been initiated. Hard copies of the survey are <br />also being made available through several locations in the community. <br />4. Volcano Village Center Plan Report. Dan Taylor handed out a preliminary list of the top 15 <br />projects identified in the draft Volcano plan and an action statement template that will identify <br />an implementation process for each project and track its pro V s. <br />5. Communication No. 2012 -49: PCDP Action High Priority Lit. <br />Farris briefly described the additions and changes made to the list based on previous discussion <br />and new information provided by AC Members. A project description section is being added <br />for each project and he suggested also adding a budget item for each. <br />6. Budget Subcommittee. Farris moved to appoint a June, Oshi, Patti and himself to the <br />Budget Subcommittee for the next fiscal cycle. Second by Patti. Motion passed with 8 <br />votes aye. <br />7. Geothermal Operations in Puna. <br />Public Testimony: <br />iii. Paul Kuykendall, Suzanne's husband, stated that state and county monitoring of PGV <br />can't be relied on to ensure public safety. <br />iv. Luana Jones offered her interpretation of the native Hawaiian perspective on the <br />appropriateness of geothermal power generation in Puna. <br />V. Laura Trav* , part of a geothermal study group initiated by Mayor Kenoi, commented on <br />some of the health impacts associated with geothermal operations. <br />vi. Tom Travis, part of the geothermal public health working group, spoke about the amount <br />of water resources consumed in geothermal power generating operations. The importance <br />of location of geothermal operations has not been adequately studied. <br />vii. Faye Hanohano, District 4 State Representative, testified that she and her family having <br />lived in proximity to volcanic vents have not experienced and health issues. She also <br />offered her native Hawaiian perspective regarding use of natural resources. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.