My WebLink
|
Help
|
About
|
Sign Out
Home
2013-09-26 Leeward Exh B - Hualalai Partners
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2013
>
2013-09-26 Leeward Exh B - Hualalai Partners
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2013 1:43:59 PM
Creation date
10/17/2013 1:40:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 has incorrect information. The project site is not adequately served by transportation or <br />utilities. Hualālai Road is a substandard road. And utilities include storm water runoff, as <br />demonstrated yesterday by our river that ran down Hualālai Road, along with rocks and debris. <br />And if anyone hasn’t driven on it, I would request that you do drive on Hualālai Road and evaluate <br />it for yourself first hand, and make any approval you make a condition of the 50-foot wide <br />recommendation that you did address in your request. The project site is part of a larger <br />development, and no drainage study has been done on the 96 acres. <br /> <br />The Planning Department is requiring a north-south connector road across private property adjacent <br />and contiguous to the south of the project site. The owner of this parcel has not been contacted by <br />anyone as of September 18, 2013, regarding granting, selling, or getting access across his property, <br />as is verified by the developer who just testified. Page 2 has incorrect information. The south, <br />north-south connector road has to cross privately owned property, as mentioned above. <br /> <br />And page 3, the project site’s proximity to schools would foster educational opportunities. The <br />school system is already overburdened. Page 3 states that Hualālai Road is substandard based on <br />width alignment, roadside and hazard clearance. No plan has been submitted to rectify this <br />situation. The T.I.A.R. impact analysis report is at best incomplete, which only addresses the <br />project site, not the 96 acres that this development is part of, and concludes that the level of service <br />at the intersections of Puapuaanui Street and Queen Ka‘ahumanu Highway and Hualālai Road and <br />Queen Ka‘ahumanu Highway are, and the entrance to the project, are either A or B classifications. <br />We the citizens are not concerned with the level of service during peak hours at these intersections. <br />The intersections are not the concern – and that’s what the T.I.A.R. addresses – it’s Hualālai Road. <br />Thank you. <br /> <br />GIFFIN: Commissioners, any questions of the testifier? Hearing none, thank you. Sir, your name. <br /> <br />VAN PERNIS: Mark Van Pernis. I testified earlier. I’ll try not to repeat. <br /> <br />GIFFIN: Thank you. <br /> <br />VAN PERNIS: First, let me digress by saying, I did, I, as a Kona attorney and one who’s involved <br />with land development, was offended by Mr. Lim’s threats to you that if you don’t approve this <br />development, everything is going to shut down in Kona. I would point out that there’s over 130,000 <br />units already approved for development in Kona. And the K to K area where this property is <br />situated is all open for development. <br /> <br />Now, let me point out on this map a few things. Those six lots -. <br /> <br />GIFFIN: You need to speak into the mike. <br /> <br />VAN PERNIS: Those six lots did not exist prior to 2004, that’s what Mr. McInnis was referring to. <br />Mr. Bolton owns two, Barrett owns two, Schuler owns two. They’re all being, the Land Use <br />Commission rules for over 15 acres are being abused here. You’re being exploited by the 15-acre <br />per lot development here, right under 15 acres. Mr. Barrett owns the top two through various <br />entities that he controls. And he has admitted that he is developing both, in the last proceeding, <br />both parcels, 30 acres, develop them together. That requires land use involvement; there are streets, <br />roads, drainage and many other issues that need to be addressed before the Land Use Commission. <br />19 <br />EXHIBIT B <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.