|
looking further down, continue to look makai along Hualālai Road. This is now looking back up
<br />with the subject property off to your right this time.
<br />
<br />Once again, the Director is recommending favorable consideration of the State Land Use Boundary
<br />amendment and the change of zone request.
<br />
<br />I know Commissioner Giffin made mention, and I fail to do that earlier, she wanted me to kind of
<br />identify some of the commonly-referred-to roads within the background report. This is where
<br />Hualālai Heights is, and Sugar Cane Lane, this is Pualena Street in this proximity here, which would
<br />then connect to the stub-out on the south side of the Hualālai development concept. And as you can
<br />see, this is Hu Ko Pa, which already has its zoning approvals, which would allow for I think it was a
<br />53-lot subdivision, and for which this project will interconnect with the Hu Ko Pa interior
<br />roadways. Part of their interior roadways will also provide for a southerly connection with Pualena
<br />Street, which is also located in this proximity here; as you can see, it connects to Puapuaanui, which
<br />then connects to Queen Ka‘ahumanu Highway. So hopefully, that, is that sufficient, Madam
<br />Chairwoman?
<br />
<br />GIFFIN: Yeah, so just for clarity, the road that actually connects the proposed subdivision to the
<br />Queen Ka‘ahumanu Highway is, which one, Daryn?
<br />
<br />ARAI: It would eventually be Pualena. Now, in the future, should this property here, which is
<br />referred to as Parcel 22, should the landowner in the future apply for entitlements like rezoning,
<br />state land use boundary to develop their properties, then through the review process we would
<br />require connection to Pualena Street here, as well as the stub-out to the Hualalai Partners
<br />development. So eventually, there will be like two connection points to Puapuaanui.
<br />
<br />GIFFIN: Good. And then, again, over and over I read some sort of north-south connector roads,
<br />okay. Are they different from these two roads that I asked you to clarify?
<br />
<br />ARAI: The north-south connector road that we are looking at within the Hualalai Partners project is
<br />an extension of Pualena Street, which is located on the mauka side of the Hualālai Heights, Pualani
<br />Estates development area, and – sorry, I wish I kept the slides together, I guess, there.
<br />
<br />I should note that since your last July meeting we’ve received a number of correspondences, all of
<br />which we were able to make copies, some of them were delivered just today, and all of them have
<br />been distributed to you for your review.
<br />
<br />GIFFIN: Thank you very much. Commissioners, any questions of Daryn? Director.
<br />
<br />COMMAND: Madam Chair, may I ask a question of the staff?
<br />
<br />GIFFIN: Yes.
<br />
<br />COMMAND: Daryn, I don’t know if you will be able to do it, but if, maybe the applicant when
<br />they come up, tell us what the line at the far right there is, the darker, I guess it looks like a walking
<br />path or something, to the far right, yeah.
<br />
<br />ARAI: This right here?
<br />4
<br />EXHIBIT B
<br />
<br />
|