Laserfiche WebLink
from Section A. <br />Copy both sides of this Elevation Certificate for )eorr(1) community official, (2) Insurance agent/company, and (3) building owner. <br />fir, <br />Comments e (��� Ar JF;U%c <br />ror cones AG and A (without BFE), complete Items E1 -E5. If the CertiflCale Is Intended to support a LOMA or LOMR-F request, complete Sections A, B, <br />and C. For Items E1 -E4, use natural grade, if available. Check the measurement used. In Puerto Rico only, enter meters. <br />E1. Provide elevation Information for the following and check the appropriate boxes to show whether the elevation Is above Or below the highest adjacent <br />grade (HAG) and the lowest adjacent grade (LAG). <br />a) Top of bottom floor (Including basement, crawlspaoe, or enclosure) Is ❑ feet ❑ meters <br />b) Top of bottom floor (including basement, crawlspace, or enclosurefeet ❑stars E3the is ❑ above or ❑ below Me NAG. <br />above or ❑ below LAO, <br />F2. For Building Dlagreme 8-9 wait permanent flood openings provided in Section A Items 6 and/or 9 (see pages 8-9 of Instructions), the next higher floor <br />(elevation C2.b in the diagrams) of the building Is ❑ feet ❑ meters ❑ above or ❑ below the HAG. <br />E3. Attached garage (top of stab) is _ _ ❑ feet ❑ meters ❑ above or ❑ below the HAG. <br />E4. Top ofplatform of machinery and/or equipment servicing the building is _._ ❑ feet ❑ meters ❑ above or ❑ below the HAG. <br />E5. Zone AG only: If no flood depth number is available, Is the top of the bottom floor elevated in accordance with the community's floodplain management <br />ordinance? ❑ Yes ❑ No ❑ Unknown The local official must cewly this Information In Section G. <br />F - <br />The property owner or owner's authorized representative who completes Sections A, B, and E for Zone A (without a FEMA -Issued or community -issued BFE) <br />or Zone AO must sign here. The statements in Sections A, B, and E are correct to the best of my knowledge. <br />Property Owner's or Owner's Authorized Representative's Name <br />Address <br />city <br />complete <br />and G of this Elevation Certificate. Complete the applicable item(s).and sign below Checkpiain e <br />the measurement u managementld In Ite snG8 and Ga. Sections A, B. C (or E), <br />G1. ❑ The information in Section C was taken from other documentation that has been signed and mated by a licensed surveyor, engineer, or architect who <br />Is authorized by law to certify elevation Information. (Indicate the source and date of the elevation data in the Comments area below.) <br />G2. ❑ A community official completed Section E for a building located in Zone A (without a FEMA -Issued or community -Issued BFE) or Zone AO. <br />G3. ❑ The following information (items G4 -G9) is provided for community floodplain management purposes. <br />G7. This permit has been Issued for: ❑ New Construction ❑ Substantial Improvement <br />G8. Elevation of as-buik lowest floor onduding basement) of the building:_-_ ❑ feet ❑ meters (PR) Datum. <br />Ga. BFE or (in Zone Ac) depth of flooding at the building site: _ <br />G10. Community's design flood _ El feet meters (PR) Datum <br />"Wd'Deportment of Public V"-1 ❑ fent ❑ meters (PR) Datum <br />Local Official's Nanta IvlS Gn CS revlewe Title <br />Name <br />recommend <br />81-31, Mar 09 <br />mi' <br />Replaces all previous editions <br />