Laserfiche WebLink
69-1826 Puako Beach Drive <br />City Puako State Hawaii ZIP Code 96743 <br />SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION (CONTII <br />both sides of this Elevation Certificate for (1) community official, (2) Insurance agent/company, and (3) building owner. <br />lents Lowest eoutoment being an electrical meter <br />SECTIOWE - BUILDING ELEVATION INFORMATION (SURVEY NOT REQUIRED) FOR ZONE AO AND ZONE A (WITHOUT SFE) <br />For Zones AO and A (without BFE), complete Items E1 -E5. Hthe Certificate is Intended to support a LOMA or LOMR-F request, Complete Sections A B. <br />and C. For Items E1 f4, use natural grade, 9 available. Check the measurement used. In Puerto Rion only, enter meters. <br />Ell. Provide elevation Information for 90 following and check the appropriate booms to show whether the elevation Is above or below the highest adjacent <br />grade (HAG) and the lowest adlIscant grade (LAG). <br />a) Top of bottom floor (including basement, crawl space, or enclosure) Is — _ ❑ feet ❑ meters ❑ above or ❑ below the HAG. <br />b) Top of bottom floor (including basement, crawl space, or enclosure) Is _ _ ❑ feet ❑ meters ❑ above or ❑ below the LAG. <br />E2. For Building Diagrams 6-8 with permanent flood openings provided In Section A Items 8 and/or 9 (see age 8 of Instructions), the next higher floor <br />(elevation C2.b in the diagrams) of the building Is — _ ❑ feet ❑ maters ❑ above or ❑ below the WIG. <br />E3. Attached garage (top of slab) is —.— ❑feel ❑ meters ❑ above or ❑ below the HAG. <br />E4. Top of platform of machinery and/or equipment servicing the building Is _ _ ❑ fast ❑ meters ❑ above or ❑ below the HAG. <br />E5, Zone AO only: If no flood depth number is available, is the top of the bottom floor elevated in accordance with the community's floodplain management <br />ordinance? ❑ Yes ❑ No ❑ Unknown. The local official must certify this information in Section 0. <br />SECTION F - PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION <br />The property owner or owner's authorized representative who completes Sections A. B, and E for Zone A (without a FEMA-lasued or cornmunttyaasued BFE) <br />or Zone AO must sign here. The statements in Sections A. B, and E are correct to rhe best of my knowledge. <br />Property Owner's or Owner's Authorized Represemadvds Name <br />cess City State ZIP Code <br />Signature Date Telephone <br />Comments <br />SECTION G - COMMUNITY INFORMATION (OPTIONAL) <br />The local official who Is authorized by law or ordinance to adminlater the community* floodplain management ordinance can complete Sections A. B, C (or E), <br />and G of this Elevation Certificate. Complete the applicable item(s) and sign below. Check the measurement used M Items G8. and Gil. <br />G1. ❑ The Information in Section C was taken from other documentation that has been signed and sealed by a licensed surveyor, engineer, or architect who <br />is authorized by law to certify elevation information. (Indicate the source and date of the elevation date in the Comments area below.) <br />G2, ❑ A community official completed Section E for a building located in Zone A (without a FEMA -Issued or community -Issued BFE) or Zone A0. <br />G1 ❑ The following Information (Items G4. -Gil.) Is provided for community floodplain management purposes. <br />Of Compliance/Ooarpancy lasted <br />G7. This perch has been issued for: ❑ New Construction ❑ Substantial Improvement <br />GB, Elevation of as-buia lowest floor (including basement) of the building: — _ _❑ feet ❑ meters (PR) Datum <br />G9. BFE or (in Zone AO) depth of flooding at the building site: _ _ ❑ feet ❑ meters (PR) Datum _ <br />Signature Rer4ewad Qum Data <br />I&ments <br />r-7 <br />L7 APProved Not Approved <br />[j Approved ns Noted <br />❑ Check here it attachments <br />FEMA Form 81-31, February 2006 Replaces all previous editions <br />