Laserfiche WebLink
IMPORTANT: In these spaces, copy the corresponding information from Section A. I For Insurance ComDanv Use: II <br />or P.O. Route and Box <br />CityKamuela Stat%waii §g V I Company NAIC Number II <br />SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION (CONTINUED) <br />Copy both sides of this Elevation Certificate for (1) community official, (2) Insurance agent/company, and (3) building owner. <br />omm to <br />op on wall 40 ft. seaward of dwelling and on property is 8.34 ft. <br />GFI outlet servicing AC units and pool equipment at elevation 10.86 ft. <br />On demand,49t water heater ayelevation 11.40 ft. <br />),.,,SCJ fi,Gr:&ss= 1-16-2009 <br />E - BUILDING ELEVATION INFORMATION (SURVEY NOT REQUIRED) FOR <br />For Zones AO and A (without BFE), complete Items Et -E5. If the Certificate Is Intended to support a LOMA or LOMR-F request, complete Sections A, B, <br />and C. For Items Et -E4, use natural grade, If available. Check the measurement used. In Puerto Rico only, enter meters. <br />E1. Provide elevation information for the following and check the appropriate boxes to show whether the elevation Is above or below the highest adjacent <br />grade (HAG) and the lowest adjacent grade (LAG). <br />a) Top of bottom floor (including basement, crawl space, or enclosure) is _ ❑ feet ❑ meters ❑ above or® below the HAG. <br />b) Top of bottom floor (including basement, crawl space, or enclosure) Is _ ❑ feet ❑ meters ❑ above or below the LAG. <br />E2. For Building Diagrams 6.8 with permanent flood openings provided in Sect l�4 Items 8 @�,Qlor 9 (see a e 8 of Instructions), the next higher floor <br />(elevation C2.b in the diagrams) of the building Is _ ❑ feet L� meters L -J above or U below the HAG. <br />E3. Attached garage (top of slab) is . _ ❑ feet ❑ meters ❑ above or ❑ below the HAG. <br />E4. Top of platform of machinery andlor equipment servicing the building is _ ❑ feet ❑ meters ❑ above or ❑ below the HAG. <br />E5, Zone AO only: If no flood depth number Is available, Is the top of the bottom floor elevated In accordance with the community's floodplain management <br />ordinance? ❑ Yes ❑ No ❑ Unknown. The local official must certify this Information in Section G. <br />SECTION F - PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION' <br />The property owner or owner's authorized representative who completes Sections A, B, and E for Zone A (without a FEMA -Issued or community -Issued BFE) <br />y,Zone AO must sign here. The statements In Sections A, B, and E are eared to the best of my knowledge. <br />Owner's or Owners Authorized Representauve's Name <br />Address City State ZIP Code <br />Signature Date Telephone <br />Comments <br />The local offidal who is authorized by law or ordinance to administer the community's floodplain management ordinance can complete Sk <br />and G of this Elevation Certificate. Complete the applicable Item(s) and sign below. Check the measurement used in Items G8. and G9. <br />G7. ❑ The Information in Section C was taken from other documentabon that has been signed and sealed by a licensed surveyor, engineer, or architect who <br />is authorized by law to certify elevation Information. (Indicate the source and date of the elevation data in the Comments area below.) <br />G2. ❑ A community official completed Section E for a building located In Zone A (without a FEMA -Issued or community -Issued BFE) or Zone AO. <br />G3. ❑ The following information (Items G4: G9.) Is provided for community floodplain management purposes. <br />G4. Permit Number G5. Date Permit Issued G6. Date Certificate Of Compliance/Occupancy Issued <br />G7. This permit has been issued for. ❑ New Construction ❑ Substantial Improvement <br />G8. Elevation of as -built lowest floor (Including basement) of the building: ❑ feet ❑ meters (PR) Datum <br />G9. BFE or (in Zone AO) depth of flooding at the building site: ❑ feet ❑ meters (PR) Datum <br />Local Official's Name Title <br />Name <br />Reviewed <br />Telephone <br />