Laserfiche WebLink
IMPORTANT: In these spaces, copy the corresponding information from Section A. ) For Insurance Company Use: i <br />h <br />CITY <br />'0 <br />OR ARCHITECT <br />Copy both sides of this Elevation Certificate for (1) community official, (2) insurance agent/company, and (3) building owner. <br />SECTION E - BUILDING ELEVATION INFORMATION (SURVEY NOT REQUIRED) FOR ZONE AO AND ZONE A (WITHOUT BFE) <br />For Zone AO and Zone A (without BFE), complete Items E1. through E5. If the Elevation Certificate is Intended for use as supporting <br />Information for a LOMA or LOMR-F, Section C must be completed. <br />E1. Building Diagram Number _ (Select the building diagram most similar to the building for which this certificate is being completed - <br />see pages 6 and 7. If no diagram accurately represents the building, provide a sketch or photograph.) <br />E2. The top of the bottom floor (including basement or enclosure) of the building is III R. (m) LLI in. (cm) LI above or LI below <br />(check one) the highest adjacent grade. (Use natural grade, if available.) <br />E3. For Building Diagrams 6-8 with openings (see page 7), the next higher floor or elevated floor (elevation b) of the building is <br />L—IJ ft. (m) 1_I_1in. (cm) above the highest adjacent grade. Complete Items C3.h and C3.1 on front of form. <br />E4. The top of the platform of machinery and/or equipment servicing the building is LLI R• (in) LIJ in. (cm) 1_J above or LI below <br />(check one) the highest adjacent grade. (Use natural grade, if available.) <br />E5. For Zone AO only: If no good depth number is available, is the top of the bottom floor elevated in accordance with the community's <br />property owner or o <br />out a FEMA -issued <br />SECTION F - PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION <br />'esentative who completes Sections A, B. C (Items C3.h and C3.i only), and E for Zone A <br />BFE) or Zone AO must sign here. The statements In Sections A, B, C, and E are correct to <br />REPRESENTATIVE'S NAME <br />SIGNATURE j // DATE 6, -r( TELEPHONE �i,� � .7C <br />COMMENTS <br />SECTION G - <br />here if <br />The local official who is authorized bylaw or ordinance to administer the community's floodplain management ordinance can complete <br />Sections A, B. C (or E), and G of this Elevation Certificate. Complete the applicable item(s) and sign below. <br />G1. IJ The Information in Section C was taken from other documentation that has been signed and embossed by a licensed surveyor, <br />engineer, or architect who is authorized by state or local law to certify elevation information- (Indicate the source and date of the <br />elevation data inthe,Comments area below.) <br />G2. LI A community official completed Section.E for a building located In Zone A (without a FEMA -issued or community -issued BFE) or <br />Zone AO. <br />G3. 1_I,The following info mtation (Items G4-Gg) is provided for community floodplain management purposes. <br />G4. PERMIT <br />PERMIT <br />G8. Elevation of as -built lowest floor (Including basement) of the building is: <br />G9. BFE or (in Zone AO) depth of flooding at the building site is: <br />LOCAL OFFICIAL'S NAME TITLE <br />COMMUNITY NAME TELEPHONE <br />SIGNATURE DATE <br />—ft. (m) Datum: <br />—ft. (m) Datum: <br />L I Check here if attachments <br />FEMA Form 81-31, January 2003 Replaces all previous editions <br />