Laserfiche WebLink
FEDERAL EMERGENCY MANAGEMENT AGENCY <br />NATIONAL FLOOD INSLIRANCE PROGRAM <br />ELEVATION CERTIFICATE <br />• Important: Read the Instructions on pages 1 - 7. _ <br />SECTION A - PROPERTY OWNER INFORMATION <br />BUIZeG OWNER'S 4ME <br />BUILDING STREET ADD/7t/-4 <br />R€SS (Indudi Apt.. Unit. Suite, and/or Bldg. No.) OR P.O. ROUTE AND BOX NO. <br />7 B- Ie)9f+ /7t /- c -4 <br />CITY - -. , STATE <br />—PROPERTY DESCRIPTION (Lot and Bim' um er!,am aQ um �;_�p� etc.) <br />1, <br />O.M.B. No. 3067-0077 O <br />Expires July 31, 2002 <br />For Insurance <br />LATITUDEILONGITUDE (OPTIONAL) ' �n HORIZONTAL DATUM: : LI (Type): <br />Rs,W or 0.i 06) Ipl NAD 1927 " NAD 1963 LJ USGS Quad Map I --I 011ier. Co v .v r B M <br />SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION <br />B10. Indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered In B9. <br />Lj FIS Profile * FIRM IJ Community Determined I_j Other (Describe): <br />811. Indicate the elevation datum used for the BFE in B9: JXJ NGVD 1929 LJ NAVD 1988 U Other (Describer <br />B12. Is the building located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPAJ? Lj Yes QSJ No <br />Designation Date: <br />SECTION C - BUILDING ELEVATION INFORMATION (SURVEY REQUIRED) <br />• <br />I. Building elevations are based on: I_jConstruction Drawings' - "Building Under Construction* &6Finished Construction <br />•A new Elevation Certificate will be required when construction of the building is complete. <br />C2. Building Diagram Number / (Select the building diagram most similar to the building for which this certificate is being completed -see <br />pages 6 and 7. If no diagram accurately represents the building, provide a sketch or photograph.) <br />C3. Elevations - Zones At -A30, AE, AH, A (with BFE), VE, V1430, V (with BFE), AR, AR/A, ARAE, AR/A1-A30, AR/AH, ARIAO <br />Complete Items C3.a-i below according to the building diagram specified in Item C2. State the datum used. If the datum is different from <br />the datum used for the BFE in Section B, convert the datum to that used for the BFE. Show field measurements and datum conversion <br />calculation. Use the space provided or the Comments area of Section D or Section G, as appropriate, to document the datum conversion. <br />Datum _ Conversion/Comment <br />Elevation reference mark used _e ' 2f s /l Does the elevation reference mark used appear on the FIRM? L_j Yes jX1 No <br />O a) Top of bottom floor (including basement or enclosure) <br />B4. MAP P <br />77 <br />nn sA E <br />85 1. CDATE <br />INDEX <br />87. FIRM PANEL <br />EFFECTIVFJREVISED DATE <br />88. FLOOD <br />ONE(S) <br />89. BASE FLOOD per of floadirg)) <br />(Zone AO, use doIRM <br />_ ft.(m) 0 0 <br />O d) Attached garage (top of slab) <br />2 <br />__rp ❑ e) Lowest elevation of machinery and/or equipment <br />a e <br />B10. Indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered In B9. <br />Lj FIS Profile * FIRM IJ Community Determined I_j Other (Describe): <br />811. Indicate the elevation datum used for the BFE in B9: JXJ NGVD 1929 LJ NAVD 1988 U Other (Describer <br />B12. Is the building located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPAJ? Lj Yes QSJ No <br />Designation Date: <br />SECTION C - BUILDING ELEVATION INFORMATION (SURVEY REQUIRED) <br />• <br />I. Building elevations are based on: I_jConstruction Drawings' - "Building Under Construction* &6Finished Construction <br />•A new Elevation Certificate will be required when construction of the building is complete. <br />C2. Building Diagram Number / (Select the building diagram most similar to the building for which this certificate is being completed -see <br />pages 6 and 7. If no diagram accurately represents the building, provide a sketch or photograph.) <br />C3. Elevations - Zones At -A30, AE, AH, A (with BFE), VE, V1430, V (with BFE), AR, AR/A, ARAE, AR/A1-A30, AR/AH, ARIAO <br />Complete Items C3.a-i below according to the building diagram specified in Item C2. State the datum used. If the datum is different from <br />the datum used for the BFE in Section B, convert the datum to that used for the BFE. Show field measurements and datum conversion <br />calculation. Use the space provided or the Comments area of Section D or Section G, as appropriate, to document the datum conversion. <br />Datum _ Conversion/Comment <br />Elevation reference mark used _e ' 2f s /l Does the elevation reference mark used appear on the FIRM? L_j Yes jX1 No <br />O a) Top of bottom floor (including basement or enclosure) <br />Z 4 .2 / ft.(m) <br />ft.(m) 'g% <br />U b) Top of next higher floor <br />_ <br />❑ c) Bottom of lowest horizontal structural member (V zones only) <br />_ ft.(m) 0 0 <br />O d) Attached garage (top of slab) <br />2 <br />__rp ❑ e) Lowest elevation of machinery and/or equipment <br />a e <br />servicing the building (Describe in a Comments area.) <br />O f) Lowest adjacent (finished) grade (LAG) <br />Z 0 . <br />TTS <br />L ft.(m) 1 <br />y„ N <br />O g) Highest adjacent (finished) grade (HAG) <br />2 y . <br />�)o ft.(m) <br />O h) No, of permanent openings (flood vents) within 1 ft. above adjacent <br />grade <br />(a i) Total area of all permanent openings (flood vents) in C3.h <br />sq. in. (sq. <br />cm) <br />SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION <br />This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation intorieation. <br />I certify that the inks A, B. and C on this certificate represents my best efforts to interpret the'deta available. <br />I understand that any false statement may be punishable by fine or imprisonment under 18 U.S. Code, Section 1001.' <br />Mt moi+ ^� - .. ua.owc ,vvmocn <br />i.,LW1`AA1T NAME <br />✓i...t. �' ..+.r. '.f �! ,'/r <br />Fnrm R1-77 .1111 <br />CFF RFVFRAF SIr1F <br />ONE / <br />N Af:FC At 1 PRF%Ilr111C FnIT1r1NC <br />