Laserfiche WebLink
IMPORTANT: In these spaces, copy the corresponding Information from Section A. I .For Insurance Company Use: <br />or <br />City _ - _. . - State <br />AML SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION (CONTINUED) <br />ZWpy both sides of this Elevation Certificate for (1) community official, (2) insurance agent/company, and (3) building owner. <br />Lowest Electrical Equipment = Elevator Door opening 6.18 feet. Note: Underground <br />SECTION E,4AUILDINbrIELEVATAN INFORMATION (SURVEY NOT REQUIRED) FOR ZONE AO AND ZONE A (WITHOUT BFE) <br />For. Zones AO and A (without. BFE), complete Items Et -ES.. If the Certificate is Intended to support a LOMA or LOMR-F request, complete Sections A, B, <br />and C. For Items E1 -E4, use natural grade, if available. Check the measurement used. In Puerto Rico only, enter meters. <br />E1. Provide elevation Information for the following and check the appropriate boxes to show whether the elevation is above or below the highest adjacent <br />grade (HAG) and the lowest adjacent grade (LAG). <br />a) Top of bottom floor (including basement, crawl space, or enclosure) is _ _ ❑ feet ❑ meters ❑ above or® below the HAG. <br />b) Top of bottom floor (Including basement, crawl space, or enclosure) Is _ _ ❑ feet El meters El above or below the LAG. <br />E2. For Building Diagrams 6-8 with permanent flood openings provided in SedigIlA Items 8 and/or 9 (see pale 8 of Instructions), the next higher floor <br />(elevation C2.b In the diagrams) of the building is _ ❑ feet LJ meters ❑ above or Ll below the HAG. <br />E3. Attached garage (top of slab) Is _ ❑ feet ❑ meters ❑ above or ❑ below the HAG. <br />E4. Top of platform of machinery and/or equipment servicing the building is _ ❑ feet ❑ meters ❑ above or ❑ below the HAG. <br />ES. Zone AO only: If no flood depth number Is available, is the top of the bottom floor elevated In accordance with the community's floodplain management <br />ordinance? ❑ Yes ❑ No ❑ Unknown. The local official must certify this information in Section G. <br />SECTION F - PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION <br />The property owner or owner's authorized representative who completes Sections A, B, and E for Zone A (without a FEMA -issued or community -Issued BFE) <br />or Zone AO must sign here. The statements in Sections A, B, and E are correct to the best of my knowledge. <br />or Owner's Authorized <br />Address City State ZIP Code <br />Signature Date Telephone <br />SECTION G - COMMUNITY INFORMATION (OPTIONAL) <br />The local official who is authorized by law or ordinance to administer the community's floodplain management ordinance can complete Sections A, 8, C (or E), <br />and G of this Elevation Certificate. Complete the applicable item(s) and sign below. Check the measurement used in Items G8. and G9. <br />G1. ❑ The information in Section C was taken from other documentation that has been signed and sealed by a licensed surveyor, engineer, or architect who <br />is authorized by law to certify elevation information. (Indicate the source and date of the elevation data In the Comments area below.) <br />G2. ❑ A community official completed Section E for a building located in Zone A (without a FEMA -Issued or community -issued BFE) or Zone AO. <br />G3. ❑ The following Information (Items G4. -G9.) is provided for community floodplain management purposes. <br />G4. Permit Number G5. bate Permit Issued G6. Date Certificate Of Compliance/Occupancy Issued <br />G7. This permit has been Issued for: LJ New Construction II Substantial Improvement <br />Ge. Elevation of as -bulk lowest floor (Including basement) of the building: ❑ feet ❑ meters (PR) Datum <br />G9. BFE or (In Zone AD) depth of flooding at the building site: - ❑ feel ❑ meters (PR) Datum <br />Local Official's Name Title <br />Community Name Telephone <br />Signature Date <br />❑ Check here if attachments <br />FEMA Form 81-31, February 2006 Replaces all previous editions <br />