Laserfiche WebLink
IMPORTANT: In these spaces, copy the corresponding information from Section A. I For Insurance Company Use: <br />BUILDING STREET ADDRESS (Including Apt., Unit. Suite, and/or Bldg. No.) OR P.O. ROUTE AND BOX NO. I Policy Number —1 <br />CITY <br />STATE <br />ZIP CQ Company NAIC Number <br />SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION (CONTINUED) <br />Copy both sides of this Elevation Certificate for (1) community official, (2) insurance agenticompany, and (3) building owner. <br />COMMENTS <br />J_J Check here if attachments <br />SECTION E - BUILDING ELEVATION INFORMATION (SURVEY NOT REQUIRED) FOR ZONE AO and ZONE A (WITHOUT BFE) <br />For Zone AO and Zone A (without BFE), complete Items E1 through E3. If the Elevation Certificate is intended for use as supporting <br />information for a LOMA or LOMR-F, Section C must be completed. <br />E1. Building Diagram Number (Select the building diagram most similar to the building for which this certificate is being completed — <br />see pages 6 and 7. If no diagram accurately represents the building, provide a sketch or photograph.) <br />E2. The top of the bottom floor (including basement or enclosure) of the building is I" ft.(m) IIlin.(cm) LJ above or LJ below <br />(check one) the highest adjacent grade. <br />E3. For Zone AO only; no flood depth number is available, is the top of the bottom floor elevated in accordance with the community's <br />floodplain management ordinance? J_J Yes' J_J No J_J Unknown. The local official must certify this information in Section G. <br />SECTION F - PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION <br />The property owner or owner's authorized representative who completes Sections A. B, and E for Zone A (without a FEMA4ssued or <br />community -issued BFE) or Zone AO must sign here. <br />ROPERTY OWNER'S OR OWNER'S AUTHORIZED REPRESENTATIVE'S NAME <br />ADDRESS CITY STATE ZIP CODE <br />SIGNATURE DATE TELEPHONE <br />COMMENTS <br />1_1 Check here if attachments <br />SECTION G - COMMUNITY INFORMATION (OPTIONAL) <br />The local official who is authorized by law or ordinance to administer the community's floodplain management ordinance can complete <br />Sections A. B, C (or E), and G of this Elevation Certificate. Complete the applicable items) and sign below. <br />G1. J_J The information in Section C was taken from other documentation that has been signed and embossed by a licensed surveyor, <br />engineer, or architect who is authorized by state or local law to certify elevation information. (Indicate the source and date of the <br />elevation data in the Comments area below.) <br />G2. J_J A community official completed Section E for a building located in Zone A (without a FEMA -issued or community -issued BFE) or <br />Zone AO. <br />G3. 1_1 The following information (items G4 -G9) is provided for community floodplain management purposes. <br />G4. PERMIT NUMBER 35. DATE PERMIT ISSUED -G6. CERTIFICATE OF COMPLIANCEIOCCUPANCY <br />ISSUED <br />G7. This permit has been issued for: J_J New Construction II Substantial Improvement <br />G8. Elevation of as -built Iestfloor (including basemenlg of the building is: _ ft.(m) Datum: <br />G9. BFE or (in Zone AO) ti Rth OT i tth9&1IH� UrsitW9r _ ft.(m) Datum: <br />LOCAL OFFICIAL'S NAM TITLE <br />he Elevation Certificate and <br />OMMUNITY NAME IR recommends TELEPHONE <br />NATURE Lf Goes not recommend DATE <br />fined approval <br />COMMENTS <br />By <br />