Laserfiche WebLink
13 Residential Building Permit Guidelines <br />BUILDING PERMIT FEES <br />httn://www.hawaiicounty.gov/lb-file-review/files/countv-code/chapter05.ndf <br />Section 5-31. Permit fees. <br />The building permit fees for dwellings (R-3) and accessory (U) occupancies are $20.00 per 100 square feet of <br />R-3 floor area or fraction thereof, and $10.00 per 100 square feet of U floor area or a fraction thereof. <br />Table 1-A below applies for all other building work (i.e., alterations, repairs, move, demolition, water tanks, <br />pools, solar systems, retaining walls, etc.). When work for which a building permit is required has commenced <br />without first obtaining said permit, the fees specified are doubled. <br />TABLE 1-A BUILDING PERMIT FEES <br />TOTAL VALUATION FEE <br />Up to $500 $10 <br />More than $501, to & including $2,000 <br />More than $2,001 to & including $25,000 <br />More than $25,001, to & including $50,000 <br />More than $50,000 <br />$10 for first $500 plus $1.50 for each additional $100 or <br />fraction thereof <br />$32.50 for first $2,000 plus $7.50 for each additional <br />$1,000 or fraction thereof <br />$205 for first $25,000 plus $6 for each additional <br />$1,000 or fraction thereof <br />$355 for first $50,000 plus $3 for each additional <br />$1,000 or fraction thereof <br />ELECTRICAL PERMIT FEES Section 9-40. Fee schedule. <br />httn://www.hawaiicounty.gov/lb-file-review/files/countv-code/chaytel09.ndf <br />(a) Issuing Permits. <br />A fee shall be paid for issuing each permit in addition to all other charges specified herein <br />$5 each <br />(b) Service Installations. <br />For the required size of service equipment on single phase construction (including meter loop) not <br />over 100 amperes. <br />$8 <br />Over 100 but not over 200 amperes. <br />$10 <br />Not over 100 amperes <br />$10 <br />Over 100 but not over 200 amperes. <br />$12 <br />(c) Feeder Circuits <br />For required size of feeder equipment. Not over 100 amperes. <br />$6 <br />Over 100 but not over 200 amperes. <br />$8 <br />Each circuit for general light and convenience outlets <br />$4 <br />Control wiring air conditioning and refrigeration for each compressor unit. <br />$6 <br />Fire and burglar alarm system. <br />$30 <br />