My WebLink
|
Help
|
About
|
Sign Out
Home
Residential Permit Guidelines
PublicDocuments
>
Public Works
>
Building Division
>
Forms & Permit Applications
>
Residential Building Permit Checklist,Guidelines, and Plan Review Guidelines
>
Residential Permit Guidelines
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2014 1:07:17 PM
Creation date
6/2/2014 1:06:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 Residential Building Permit Guidelines <br />For more information visit the Department of Health Wastewater Branch website: <br />httn://hawaii.gov/wastewater/index.html or call 933-0401. <br />6. Wastewater Division, Department of Environmental Management, County (808) 961-8338, <br />httn://records.co.hawaii.hi.us/Weblink8/l/doc/61905/Pagel.aspx: Properties adjacent to the County <br />wastewater collection system require a sewer connection installation as part of the building permit. <br />OTHER REVIEWING AGENCIES: <br />1. Highway Division, State Department of Transportation, (808) 933-8866. Permits to work with the state <br />right-of-way; to connect a driveway or street to the State highway. <br />http://hidot.hawaii. gov/highways/home/doing-business/guide-to-permits/routine-construction-within-a-state- <br />hi wa /: <br />2. Historic Preservation Division, State Department of Land and Natural Resources, (808) 327-3690: State <br />Historic Preservation Program - for historic features and structures over 50 years old, grading permit approval is required. <br />3. State of Hawai' i Department of Business, Economic Development and Tourism (DBEDT) - <br />Solar Water Heater drawing requirements: <br />a. The solar water heater is identified on the floor plan. <br />b. Panels on the roof are drawn on the elevation drawings. <br />c. Panels on the ground are indicated on the site plan Complete drawings are required for a structure. <br />d. If both water tank and panels are to be placed on the roof, elevation drawings shall show the <br />location. Structural support details are required. Plans for tank on the roof require an Architect or <br />Structural Engineer's approval. <br />If a variance from DBEDT was obtained, please remit a copy of the approval with your submittal. If a variance <br />petition is pending approval add "Pending approval of solar water heater variance from DBEDT". (Available <br />at: Hawaii. govwebsite http://energv.hawaii.gov/wp- <br />content/uploads/2011/09/FAQs-SWH-Variance-4 15 2013.ndf) <br />
The URL can be used to link to this page
Your browser does not support the video tag.