Laserfiche WebLink
rsUIwwc;=S I KtL I ADDRESS(Including-Apt,' Suite,.and/or Bldg:'No.)OR P.O. ROUTE AND BO: Policy Number <br /> CITY STATE ZIP CODE Company NAIC Number <br /> SECTION D-SURVEYOR,ENGINEER,OR ARCHITECT CERTIFICATION(CONTINUED) <br /> Copy both sides of this Elevation Certificate for(1)community official,(2)insurance agent/company,and(3)building owner. <br /> COMMENTS _. <br /> 1-1 Check here if attachments <br /> SECTION E-BUILDING ELEVATION INFORMATION(SURVEY NOT REQUIRED)FOR ZONE AO AND ZONE A(WITHOUT BFE) <br /> For Zone AO and Zone A(without BFE),complete Items El through E4. If the Elevation Certificate is intended for use as supporting <br /> information for a LOMA or LOMR-F, Section C must be completed. <br /> El.Building Diagram Number (Select the building diagram most similar to the building for which this certificate is being completed— <br /> see pages 6 and 7. If no diagram accurately represents the building,provide a sketch or photograph.) <br /> E2.The top of the bottom floor(including basement or enclosure)of the building is I I I ft•(m)1 I iin•(cm) I-1 above or 1_1 below <br /> (check one)the highest adjacent grade. <br /> E3.For Building Diagrams 6-8 with openings(see page 7),the next higher floor or elevated floor(elevation b)of the building is <br /> I 1J ft•(m)I I_Iin.(cm)above the highest adjacent grade. <br /> E4.For Zone AO only. If no flood depth number is available,is the top of the bottom floor elevated in accordance with the community's <br /> floodplain management ordinance?1_1 Yes (_J No 11 Unknown. The local official must certify this information in Section G. <br /> SECTION F-PROPERTY OWNER(OR OWNER'S REPRESENTATIVE)CERTIFICATION <br /> The property owner or owner's authorized representative who completes Sections A,B,and E for Zone A(without a FEMA-issued or <br /> community-issued BFE)or Zone AO must sign here. <br /> PROPERTY OWNER'S OR OWNER'S AUTHORIZED REPRESENTATIVE'S NAME <br /> ADDRESS CITY STATE ZIP CODE <br /> SIGNATURE DATE TELEPHONE <br /> COMMENTS <br /> ( 1 Check here if attachments <br /> SECTION G-COMMUNITY INFORMATION(OPTIONAL) <br /> The local official who is authorized by law or ordinance to administer the community's floodplain management ordinance can complete <br /> Sections A, B,C(or E),and G of this Elevation Certificate. Complete the applicable item(s)and sign below. <br /> G 1.1 1 The information in Section C was taken from other documentation that has been signed and embossed by a licensed surveyor, <br /> engineer,or architect who is authorized by state or local law to certify elevation information. (Indicate the source and date of the <br /> elevation data in the Comments area below.) <br /> G2. I 1 A community official completed Section E for a building located in Zone A(without a FEMA-issued or community-issued BFE)or <br /> Zone AO. <br /> G3. I I The following information(Items G4-G9)is provided for community floodplain management purposes. <br /> G4. PERMIT NUMBER G5. DATE PERMIT ISSUED G6. DATE CERTIFICATE OF COMPLIANCE/OCCUPANCY <br /> ISSUED <br /> G7.This permit has been issued for: I1 New Construction 1_1 Substantial Improvement <br /> G8. Elevation of as-built lowest floor(including basement)of the building is: _ft.(m)Datum: <br /> G9. BFE or(in Zone AO)deoth ofgoodin at the b 'Id'nggsite is: ft.(m)Datum: <br /> •Pne epartmenf of Public VAinrkc <br /> LOCAL OFFICIAL'S NAME Engineering Division has reviewed TITLE <br /> COMMUNITY NAME the tlevation Ctificate ander TELEPHONE <br /> Jr1} recommends <br /> SIGNATURE DATE <br /> 0 <br /> does not recommend <br /> COMMENTS final approval <br /> By �9 <br /> Dude 012,1102- 1_1 Check here if attachments <br /> FP RA Fnrm Pt I_11 M I(.00 <br /> PDI ACPC GI I DDFVnnI Ic FnITInnIc <br />