Laserfiche WebLink
IMPORTANT: In these spaces, copy the corresponding information from Section A. For:tnsurance Company Ise '_;'-: <br /> _ <br /> Building Street Address(including Apt.,Unit,Suite,and/or Bldg.No.)or P.O.Route and Box No. Policy Numb `404y*Wr ;:; <br /> 1985 Kalanianaole Street lilt_ 'Z—\—OJ ; b5(c, ;: , ` 'f <br /> City State ZIP CodeComanyMIAIC Numb ` ux <br /> Hilo HI 96720 :'"!''',:t.,',,n **. ...:_ <br /> SECTION D -SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION (CONTINUED) <br /> -Jpy both sides of this Elevation Certificate for(1)community official,(2)insurance agent/company,and(3)building owner. <br /> Comments <br /> SignatureDate <br /> Signature <br /> aei/jo ,1\94....„A <br /> ________. ---_- - VV--7 O _ 0---Check-here if attachments - <br /> SECTION E4-B.IALDING ELEVATION INFORMATION (SURVEY NOT REQUIRED) FOR ZONE AO AND ZONE A(WITHOUT BFE) <br /> For Zones AO and A(without BFE),complete Items E1-E5. If the Certificate is intended to support a LOMA or LOMR-F request,complete Sections A,B, <br /> and C. For Items El-E4,use natural grade,if available. Check the measurement used. In Puerto Rico only,enter meters. <br /> El. Provide elevation information for the following and check the appropriate boxes to show whether the elevation is above or below the highest adjacent <br /> grade(HAG)and the lowest adjacent grade(LAG). <br /> a)Top of bottom floor(including basement,crawlspace,or enclosure)is _ ❑feet CI meters ❑above or ❑below the HAG. <br /> b)Top of bottom floor(including basement,crawlspace,or enclosure)is ❑feet ❑meters Dabove or ❑below the LAG. <br /> E2. For Building Diagrams 6-9 with permanent flood openings provided in Section A Items 8 and/or 9(see gA,ges 8-9 of Instructions),the next higher floor <br /> (elevation C2.b in the diagrams)of the building is ❑feet ❑meters ❑above or LI below the HAG. <br /> E3. Attached garage(top of slab)is . ❑feet❑meters 0 above or ❑ below the HAG. <br /> E4. Top of platform of machinery and/or equipment servicing the building is ❑feet ❑meters ❑above or ❑below the HAG. <br /> E5.- Zone AO only: If no flood depth number is available,is the top of the bottom floor elevated in accordance with the community's floodplain management <br /> ordinance? ❑ Yes ❑ No ❑ Unknown. The local official must certify this information in Section G. <br /> SECTION F-PROPERTY OWNER(OR OWNER'S REPRESENTATIVE)CERTIFICATION <br /> The property owner or owner's authorized representative who completes Sections A, B,and E for Zone A(without a FEMA-issued or community-issued BFE) <br /> or Zone AO must sign here. The statements in Sections A,B,and E are correct to the best of my knowledge. <br /> Property Owner's or Owner's Authorized Representative's Name <br /> iress City State ZIP Code <br /> Signature Date Telephone <br /> Comments <br /> ❑Check here if attachments <br /> SECTION G -COMMUNITY INFORMATION (OPTIONAL) <br /> The local official who is authorized by law or ordinance to administer the community's floodplain management ordinance can complete Sections A,B,C(or E), <br /> and G of this Elevation Certificate. Complete the applicable item(s)and sign below. Check the measurement used in Items G8 and G9. <br /> Gl. ❑ The information in Section C was taken from other documentation that has been signed and sealed by a licensed surveyor,engineer,or architect who <br /> is authorized by law to certify elevation information. (Indicate the source and date of the elevation data in the Comments area below.) <br /> G2. ❑ A community official completed Section E for a building located in Zone A(without a FEMA-issued or community-issued BFE)or Zone AO. <br /> G3. ❑ The following information(Items G4-G9)is provided for community floodplain management purposes. <br /> G4.Permit Number G5. Date Permit Issued G6. Date Certificate Of Compliance/Occupancy Issued <br /> G7. This permit has been issued for: ❑ New Construction ❑Substantial Improvement <br /> G8. Elevation of as-built lowest floor(including basement)of the building . ❑feet ❑meters(PR) Datum <br /> G9. BFE or(in Zone AO)depth of flooding at the building site . ❑feet ❑meters(PR) Datum <br /> G10.Community's design flood elevatiol 1e Department of Public Works ❑feet 0 meters(PR) Datum <br /> Fn-- c: -Division tab reviewedtle <br /> Local Official's Name <br /> the Elevation C'e tArra <br /> ;ficntw nom! <br /> Community Name t!ecc: Ine,:4 S Telephone <br /> does no: recG?a'camel Date <br /> Signature final ir.,nm'.. i <br /> nments <br /> By, 1 'A r✓C0 <br /> Dote.�JUL 2 8 - ❑Check here if attachments <br /> FEMA Form 81-31, Mar 09 Replaces all previous editions <br />