My WebLink
|
Help
|
About
|
Sign Out
Home
2014-05-27 Water Board Minutes
PublicDocuments
>
Water Supply, Department of
>
Water Board
>
Minutes
>
2011 - 2015
>
2014
>
2014-05-27 Water Board Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2014 3:37:45 PM
Creation date
6/24/2014 3:37:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
on, and Derrick was taken a bit off-guard; DWS was doing major excavation by the transformer pad at <br />the site. <br /> <br />Mr. Arikawa asked whether five weeks would be enough time to get everything done, including taking <br />delivery and doing the installation. <br /> <br />Ms. Moreira said yes, if everything goes as planned. <br /> <br />Mr. Arikawa asked whether six weeks would be okay. <br /> <br />Ms. Moreira said that would be okay, providing Derrick’s gets the pump in time. She noted that her <br />first time extension request was to September, to provide enough time for testing after the pump is <br />installed. <br /> <br />Ms. Moreira said she was not sure how everything was going to pan out after the pump is installed; she <br />was not clear whether DWS would be ready for testing at that time. Testing is part of the contract, she <br />added. <br /> <br />Chairperson Kaneshiro said that at this point, somebody needed to make a Motion on whether or not to <br />provide a time extension. <br /> <br />Ms. Garson said the Motion should also state how long the time extension would be. <br /> <br />Mr. Greenwell said that he would make a Motion. He thought that September was a little bit excessive; <br />he thought that August 1 or the end of July would be better. The Board needs to push this forward. <br /> <br />Ms. Moreira said that when she asked for September, she was seeking a bit of a cushion because she did <br />not know how matters stood with the pump. <br /> <br />Mr. Greenwell said he understood; Ms. Moreira must have been totally lost. He asked her if the pump <br />would be delivered within three weeks. <br /> <br />Ms. Moreira said that she was hopeful that it would be two or three weeks for the manufacturer to <br />complete the repair, and ocean freight always takes 10 days. The pump would be coming from Arizona <br />to the port at Los Angeles. Ocean freight to Hilo always leaves on a Saturday, and takes 10 days to <br />arrive. Shipping to Kona takes a three additional days, so Derrick’s usually trucks it over themselves, so <br />Ms. Moreira figured it would be three to four weeks for delivery. <br /> <br />MOTION: Mr. Greenwell said his Motion was for the time extension to be to August 1. <br /> <br />Chairperson Kaneshiro asked if Mr. Greenwell wanted his Motion to stipulate how many additional <br />weeks the time extension would be, instead of a date. <br /> <br />Ms. Garson said there is a Motion to grant a time extension to August 1; she asked if there was a second <br />to enable the Board to discuss the Motion. <br /> <br />Mr. Arikawa seconded. <br /> <br />Mr. Uyeda said that he would prefer instead that the time extension went until the July Board meeting; <br />in case in the meantime there was an issue regarding a further delay in the pump’s delivery, the Board <br />could discuss it. He said that the pump would be delivered by the July meeting. <br /> <br />Mr. Arikawa and Ms. Garson noted that the Board meeting would be held on July 22. <br /> <br />Page 8 of 27 Water Board Minutes 5-27-14 js <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.