Laserfiche WebLink
• <br /> _ <br /> IMPORTANT: In these spaces,copy the corresponding information from Section A. For Insurance Company Use: <br /> Building Street Address(including Apt.,Unit,Suite,and/or Bldg.No.)or P.O. Route and Box No. Policy Number <br /> 72-100 Kaupulehu Drive, Suite 1 (Bridge Suite 6) <br /> Ci State ZIP Code Company NAIC Number <br /> K'ailua—Kona, Hawaii 96745 <br /> SECTION D-SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION(CONTINUED) <br /> Copy both sides of this Elevation Certificate for(1)community official,(2)insurance agent/company,and(3)building owner. • <br /> Comments <br /> Elevation listed in C2.e is for air conditioning units within the suites. <br /> — ' 28, 2009 <br /> SignatureDate <br /> ❑ Check here if attachment: <br /> SECTION E BUILDING ELEVATION INFORMATION(SURVEY NOT REQUIRED)FOR ZONE AO AND ZONE A(WITHOUT BFE) <br /> For Zones AO and A(without BFE),complete Items El-E5. If the Certificate is intended to support a LOMA or LOMR-F request,complete Sections A, B, <br /> and C. For Items El-E4,use natural grade,if available. Check the measurement used. In Puerto Rico only,enter meters. <br /> El. Provide elevation information for the following and check the appropriate boxes to show whether the elevation is above or below the highest adjacent <br /> grade(HAG)and the lowest adjacent grade(LAG). <br /> a)Top of bottom floor(including basement,crawlspace,or enclosure)is •_ ❑feet meters ❑above or ❑below the HAG. <br /> b)Top of bottom floor(including basement,crawlspace,or enclosure)is _ Ofeet ❑meters ['above or ['below the LAG. <br /> E2. For Building Diagrams 6-9 with permanent flood openings provided in Sectio Items 8 and/or 9(see ages 8-9 of Instructions),the next higher floor <br /> (elevation C2.b in the diagrams)of the building is _❑feet u meters 0 above or u below the HAG. <br /> E3. Attached garage(top of slab)is 0 feet 0 meters 0 above or 0 below the HAG. <br /> E4. Top of platform of machinery and/or equipment servicing the building is _0 feet 0 meters 0 above or 0 below the HAG. <br /> E5. Zone AO only: If no flood depth number is available,is the top of the bottom floor elevated in accordance with the community's floodplain management <br /> ordinance? 0 Yes ❑No 0 Unknown. The local official must certify this information in Section G. <br /> SECTION F-PROPERTY OWNER(OR OWNER'S REPRESENTATIVE)CERTIFICATION <br /> The property owner or owner's authorized representative who completes Sections A,B,and E for Zone A(without a FEMA-issued or community-issued BFE) <br /> or Zone AO must sign here. The statements in Sections A,B,and E are correct to the best of my knowledge. <br /> Property Owner's or Owner's Authorized Representative's Name <br /> Address City State ZIP Code <br /> Signature Date Telephone <br /> • <br /> Comments <br /> ❑Check here if attachments <br /> SECTION G-COMMUNITY INFORMATION(OPTIONAL) <br /> The local official who is authorized by law or ordinance to administer the community's floodplain management ordinance can complete Sections A,B,C(or E), <br /> and G of this Elevation Certificate. Complete the applicable item(s)and sign below. Check the measurement used in Items G8 and 09, <br /> G1. 0 The information in Section C was taken from other documentation that hasbeen signed and sealed by a licensed surveyor,engineer,or architect who <br /> is authorized by law to certify elevation information. (Indicate the source and date of the elevation data in the Comments area below.) <br /> G2. 0 A community official completed Section E for a building located in Zone A(without a FEMA-issued or community-issued BFE)or Zone AO. <br /> G3. 0 The following information(Items G4-G9)is provided for community floodplain management purposes. <br /> I G4.Permit Number I G5. Date Permit Issued G6. Date Certificate Of Compliance/Occupancy Issued 1 <br /> G7. This permithas been.issued for: 0 New Construction 0 Substantial Improvement J <br /> 08. Elevation of as-built lowest floor(including basement)of the building ❑feet CImeters(PR) Datum <br /> G9. BFE or(in Zone AO)depth of flooding at the building site 0 feet 0 meters(PR) Datum <br /> G10.Community's design flood elevation ❑feet 0 meters(PR) Datum <br /> Local Official's Name Title <br /> Engineering Division has revld <br /> Community Name the Elevation Certificate and Telephone <br /> Signature recommends Date <br /> Comments ❑ docs not rccommend <br /> final approval <br /> l05/1;.%)- ❑Check here if attach rnents <br /> FEMA Form 81-31, Mar 09 Da* ��` — Replaces all previous editions <br />