My WebLink
|
Help
|
About
|
Sign Out
Home
2014-05-15 Leeward Exh B (Amend SMA 388)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2014
>
2014-05-15 Leeward Exh B (Amend SMA 388)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2014 9:30:07 AM
Creation date
7/18/2014 9:30:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BEAUDET: Is that sidewalk, curb and gutter -. <br /> <br />FOULK: Sidewalk, curb and gutter, drywells, roadway, intersection improvements, the whole nine <br />yards, yeah. <br /> <br />BEAUDET: Is the intention to wrap around on the makai side of the development area as well? <br /> <br />FOULK: It goes around part of the makai side, yes. <br /> <br />BEAUDET: Thank you. Any more questions or comments of our commissioners? <br /> <br />COMMAND: Mr. Chairman? Mr. Foulk, when was the last time that this project was run before <br />the KVDC, the Kailua Village Design Commission? <br /> <br />FOULK: That was a long time ago. I think, I’d have to say that I put this before the KVDC in 2004 <br />maybe, somewhere around there, about ten years ago. <br /> <br />COMMAND: I would suggest that you go ahead and just update them. <br /> <br />FOULK: Sure, yeah. <br /> <br />COMMAND: And just let them know what you are going to do so they are not blindsided, so that <br />they are not, I mean, it’s been a long time since this project has, you know -. <br /> <br />FOULK: Yeah, and it’s a new panel and stuff, you know -. <br /> <br />COMMAND: Right, right. <br /> <br />FOULK: So they’ve got new thoughts. <br /> <br />COMMAND: And the only other thing I would say, and I think we talked about this before, was <br />that if you look at Condition 2, it says, “Construction of the proposed development shall be <br />completed within 5 years from the effective date of this second amendment”; “second” is <br />underlined, and it’s underlined for a reason. And we are hoping that you will follow through on this <br />project, because the first extension was administrative, the second one was before the Planning <br />Commission, and all other ones are, you know, you are at the mercy of the Planning Commission. <br />So we certainly hope that you will follow through. <br /> <br />FOULK: Yeah -. <br /> <br />COMMAND: Or your clients will. <br /> <br />FOULK: I don’t enjoy coming in here at all. <br /> <br />COMMAND: Yeah, I know you don’t, but. <br /> <br />FOULK: I mean nothing personal, but, yeah. <br /> <br />4 <br />EXHIBIT B <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.