My WebLink
|
Help
|
About
|
Sign Out
Home
2014-12-04 Hearing Transcript-Steve Shropshire SMA 14-058
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2014
>
2014-12-04 Hearing Transcript-Steve Shropshire SMA 14-058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 3:53:20 PM
Creation date
1/8/2015 3:53:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />HEAUKULANI: Three. <br /> <br />DARROW: Yeah, Condition Three. We’ve, we’ve asked that this condition be in there, that it’s <br />either held back 60 feet or if they submit this report and it’s determined that there is stability and <br />the erosion, the coastal erosion rate is okay to go up to the minimum shoreline setback of 40 feet <br />along a certified shoreline, we can bring it into that 40 feet. But again, in looking at the report, <br />just prematurely, it looks like there may some areas in this that we may want to hold back farther <br />than other areas. So, that’s something that we can work out in the process, but right now, across <br />the board, it’s held back at 60 feet. With this report being submitted and with the approval of the <br />Planning Director, they may be able to come in further to the shoreline up to 40 feet. <br /> <br />HEAUKULANI: Thank you. <br /> <br />DARROW: Thank you. <br /> <br />IKEDA: Question. Are we gonna get a copy of the report because I don’t have it. <br /> <br />DARROW: The coastal erosion, the original one was submitted as an Exhibit 10. <br /> <br />IKEDA: Right. No, I’ve seen the original, but you said there was a current one that just— <br /> <br />DARROW: And then today we— <br /> <br />IKEDA: --yes— <br /> <br />DARROW: --let me see if I’ve— <br /> <br />Is that this one? <br /> <br />MOSES: It’s this one— <br /> <br />IKEDA: No, no, no, this is— <br /> <br />DARROW: Okay— <br /> <br />MOSES: This is the one. <br /> <br />IKEDA: I was all right with the other one until you mentioned this and wanted this and this. <br /> <br />DARROW: There’s, there’s a few adjustments in that. The difference is the date. You’ll see <br />the November versus December, but in talking with the Applicant, there was some minor <br />adjustments in the report, so that’s the only difference. Any other questions? <br /> <br />MIYASATO: I have one. Just to be clear, this application is for a Special Management Area <br />Use Permit and not a rezone, Change of Zone. <br />5 <br />EXHIBIT A <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.