My WebLink
|
Help
|
About
|
Sign Out
Home
2015-03-05 HearingTranscript - Hamakua Harvest SPP 14-175
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2015
>
2015-03-05 HearingTranscript - Hamakua Harvest SPP 14-175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2015 1:56:54 PM
Creation date
4/2/2015 1:56:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
minute, but before I do that, I want to point out this is the location of the future ag processing <br />facility, which I mentioned was a permitted in the ag district. And then, as I mentioned before, <br />the remaining part of the property that has been leased from Kamehameha Schools will be used <br />for growing orchards and crops. <br /> <br />This is a zoom-in version of a site plan at the farmer’s market area. So, the driveway comes up <br />to the site. There is a turnaround to make it easier for vehicles to get in and out. These little <br />numbers of the bottom adjacent to the driveway are extra parking stalls. The main parking area <br />is here, and it’s designed also to have a turnaround so that people can get in and out easily. <br /> <br />The proposed farmer’s market structure is outlined in the dark blue here, and then there’s also <br />room for a future addition of additional vendor stalls in the future. This little green, green <br />outlined building on the east side here is a future restroom building. And then this building here <br />is a future plant sales area, and then in the back, you have the plant nursery with the little access <br />road off to the plant nursery. <br /> <br />This is a view of the permit area from the highway looking north. I mentioned there’s an old <br />camp road, and this picture is taken standing at that access. The farmer’s market would be built <br />generally in this location here. And then, this is the camp road access off of the highway. <br />Department of Transportation has asked that access to the highway in this area be prohibited. <br />So, we included a condition that this area be gated. And, then this is a view from Māmane Street <br />looking towards the highway. The highway is in the background here. This is their driveway off <br />of Māmane, and you can see the property in the background on the left. This is again a view of <br />the access onto Māmane, so there’s a paved apron coming off of Māmane and then it drops down <br />to a dirt driveway which the Applicant will be placing gravel on. And then, this is a view of that <br />dirt, dirt and semi-asphalt driveway up to the Special Permit area which will be in this area here. <br /> <br />The Director is recommending approval of the request with the conditions contained in the <br />Recommendation Report. And, I just want to go back and clarify one thing. When we first <br />received the application, the Applicant requested the market operate on one weekday and one <br />weekend day between 10 a.m. and 4 p.m. They did, after reading our Background and <br />Recommendation Report, this week, they did see that they wanted to expand their hours and days <br />of operation, so you should have gotten an email from the Applicant requesting that the <br />Commission consider that. Ideally, they would like to have the option of operating on both <br />weekend days, Saturday and Sunday, and one day during the week. The--the weekend operation <br />would be from 8 a.m. to 4 p.m. because typically markets start earlier on the weekends. And <br />then, the weekday market would be from 10 a.m. to 4 p.m. And the Director has reviewed this <br />request and is, is accepting of their request. So, we can come up with some language to modify <br />Condition No., No. 10 if the Commission also agrees with that request. <br /> <br />That concludes my presentation. <br /> <br />MOSES: Thank you, Maija. Commissioners, any questions of the staff? <br /> <br />ONO: One question. <br /> <br />3 <br />EXHIBIT C <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.