My WebLink
|
Help
|
About
|
Sign Out
Home
2014-COH - Comprehensive Annual Financial Report
PublicDocuments
>
Legislative Auditor
>
Audit Reports
>
Annual Comprehensive Financial Report
>
2014-COH - Comprehensive Annual Financial Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2015 3:37:37 PM
Creation date
7/13/2015 2:47:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPITAL ASSET AND DEBT ADMINISTRATION <br />Capital assets. The County's investment in capital assets for its governmental and business -type <br />activities as of June 30, 2014 amounts to $1,054 million (net of accumulated depreciation). This <br />investment in capital assets includes land and improvements, buildings and improvements, <br />equipment, easements, and infrastructure assets, which consists of primarily roads and bridges. <br />The total increase in the County's investment in capital assets for the current fiscal year was 4 <br />percent. <br />Major capital asset events during the current fiscal year included the following: <br />• Construction continued on Na Kahua Hale O Ulu Wini Housing Project (formerly known as <br />Kaloko Housing Program) and costs at the end of the current fiscal year for Phases 3 and 4 <br />totaled $8.1 million of which $2.7 was from the current fiscal year; the portion relating to the <br />completed Phase 3 was transferred to Building and Improvements. <br />• Construction continued on the County's Corporation Counsel and Liquor Control Offices <br />Hazardous Abatement and Restoration project; construction in progress as of the end of the <br />current fiscal year increased by $2.6 million to reach a total of $5.0 million, which was <br />transferred to Buildings and Improvements. <br />• Construction continued on the Kalaniana`ole Sewer Interceptor Line Rehabilitation Phase 2; <br />construction in progress as of the end of the current fiscal year increased by $2.1 million to <br />reach a total of $7.5 million, which was transferred to Buildings and Improvements. <br />• Construction continued on the Reed Island Bridge Rehabilitation; construction in progress as <br />of the end of the current fiscal year increased by $5.8 million to reach a total of $8.0 million, <br />which was transferred to Infrastructure. <br />• Construction continued on the La`aloa Avenue Extension with work also beginning on Phase <br />2 of the project; construction in progress for both phases as of the end of the current fiscal <br />year increased by $4.8 million to reach a total of $6.1 million. <br />• Construction continued on the Kaiminani Drive Roadway Improvements Phase I; <br />construction in progress as of the end of the current fiscal year had reached $8.3 million with <br />$2.2 million coming from the current fiscal year. <br />• Construction continued on the Kamehameha Avenue Reconstruction (Wailoa Bridge to <br />Ponahawai) project; construction in progress as of the end of the current fiscal year had <br />reached $2.5 million with $2.1 million coming from the current fiscal year. <br />0 Construction began on two projects associated with the Honoka`a Rodeo Arena, which were <br />the accessibility improvements and the covered bleachers facility. Costs for both projects <br />reached a total of $2.8 million, which was transferred to Building and Improvements. <br />• $17.9 million of dedicated roads were received by the County in the current fiscal year. <br />• $6.6 million of various other equipment and real property were dedicated and donated to the <br />County in the current fiscal year. <br />-24- <br />
The URL can be used to link to this page
Your browser does not support the video tag.