My WebLink
|
Help
|
About
|
Sign Out
Home
2015-34 PCDP ProgressReport May 2014 to April 2015-prelim DRAFT
PublicDocuments
>
Planning Department
>
Action Committees (AC)
>
Puna Community Development Plan Action Committee
>
Pre-2018 Files
>
Communications to AC
>
2015
>
2015-34 PCDP ProgressReport May 2014 to April 2015-prelim DRAFT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2015 2:07:23 PM
Creation date
8/10/2015 1:36:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IThe FY 2013 -14 CIP Budget included an appropriation of $400,000 for associated <br />community efforts to designate Red Road as a Scenic Byway- - - comment [SHI]: Need to verify this <br />6. Pahoa Town Center Land (PCDP 3.5.3c2) <br />Champions: Oshi Simsarian & Elmer Solis <br />The FY 2013 -14 CIP Budget included an appropriation of $3.259 million to purchase <br />land in Pahoa Village to create a public parking lot. <br />7. Highway 132 Road Shoulder repair, widening & clearing (PCDP 4.3.1c) <br />Champion: Oshi Simsarian <br />The FY 2014 -15 CIP Budget included an appropriation of $200,000 to clear vegetation, <br />prepare and widen the shoulder of Highway 132 between the 0.5mm and the 4mm to <br />allow for safer pedestrian and bicycle movement. <br />8. Post Office Road Extension (PCDP 4.32c) <br />Champions: Elmer Solis, Oshi Simsarian & Patti Pinto <br />The FY 2014 -15 CIP Budget included an appropriation of $201,000 for planning and <br />land acquisition to extend the road to provide for an alternate connection between Pahoa <br />Village Road and the new Pahoa Regional Park <br />9. Kuauli Road Traffic Improvements (PCDP 4.3.1d) <br />Champion: Patti Pinto & Farris Etterlee <br />The FY 2013 -14 CIP Budget included an appropriation of $1 million to create a right turn <br />lane from Kuauli Road onto Highway 11. <br />10. Puna Emergency Access Road Improvements (Hawaiian Acres) (PCDP 4.32c) <br />Champion: Patti Pinto & Farris Etterlee <br />The FY 2013 -14 CIP Budget included an appropriation of $1.1 million for spot <br />resurfacing and drainage improvements. <br />11. South Kulani Road Improvements (PCDP 4.3.1d) <br />Champion: Patti Pinto & Farris Etterlee <br />The FY 2013 -14 CIP Budget included an appropriation of $1.5 million for repaving of <br />roadway to create safe pullouts on South Kulani Road. <br />12. Puna Makai Alternate Route (PCDP 4.32b) <br />Champion: Patti Pinto & Farris Etterlee <br />IThe FY 2009 -10 CIP Budget included an appropriation of $190,000 for feasibility study <br />for the Puna Makai Alternate Route , - comment [SH2]: Need to confirm this <br />13. Apa`a Street Improvements (Blind curve realignments) (PCDP 4.3.1d) <br />Champion: Rene Siracusa <br />The FY 2012 -2013 CIP Budget included an appropriation of $200,000 to realign blind <br />curves along Apa`a Street. <br />14. Pahoa Village Road Drywells (PCDP 4.3.1d) <br />Champion: Elmler Solis & Farris Etterlee <br />The FY 2013 -14 CIP Budget included an appropriation of $1.1 million to construct, <br />repair and maintain drywells along Pahoa Village Road. <br />ADDITIONAL PROJECTS WITH NO CIP APPROPRIATIONS <br />1. Glenwood Park Improvement (PCDP 3.5.3c 1)c) <br />AC Champion effort to initiate actions to address safety concerns related to the existing <br />Glenwood Park alongside Hwy. 11. <br />
The URL can be used to link to this page
Your browser does not support the video tag.