My WebLink
|
Help
|
About
|
Sign Out
Home
2015-10-22 Leeward Exh A (SMA 15-060)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2015
>
2015-10-22 Leeward Exh A (SMA 15-060)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2015 11:32:50 AM
Creation date
11/19/2015 11:32:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
which the applicant and the Planning Director agreed that in light of a certified shoreline that we <br />would agree upon this particular line as the current shoreline, and we would use this line in reference <br />to, Number One, setback, shoreline setbacks for new structures. In this case because on the north <br />side of the property there is an existing hardened rock wall, we agreed to a 40-foot setback, which is <br />our standard shoreline setback area, which is identified with the green outline. In the areas where <br />there were no hardened structures along the south side of the property and through the middle of the <br />property, the applicant and the Planning Director agreed to hold back the line to 60 feet. And so, <br />again, the proposal is to hold back all new structures, new construction, out of those areas. There <br />could be some allowances what we call minor structures and activities within this area, but those have <br />to meet those standards and they are reviewed and approved through the Planning Department by the <br />Planning Director. Additionally, this is the line that the Planning Department and the applicant <br />referred to when we talked about not restricting public access that there is access allowable makai of <br />this line to the public that would be unrestricted. The only areas that are of concern are obviously the <br />buffers around the heiau that are in place, and that is for protection of the historic and cultural <br />resources. <br /> <br />Other than that, a majority of the conditions are standard conditions. But we believe that the <br />agreement has resulted in a comprehensive recommendation to the Planning Commission. With that, <br />that concludes our presentation. If you have any questions, I stand ready to answer. <br /> <br />UNGER: Thank you. Commissioners, are there any questions? I have a question. In regard to the <br />access, is there going to be an opportunity for the public to participate in either the interim resolution, <br />or access agreement, and then the final access plan? <br /> <br />DARROW: In our standard procedure for public access plans to our SMA permits, if they are not <br />already, you know, currently we have a plan that is identified in this SMA permit, that’s a proposed <br />plan. The more comprehensive plan usually is done administratively through, again, the Planning <br />Director’s review, as well as consultation with the Department of Land and Natural Resources. It’s <br />not a process that the public, we hold another public hearing or we send it out for comments; it’s <br />usually done administratively. With that, I’d like to say that the Planning Director through this <br />process has heard loud and clear what the issues are of concern, and is going to work on making sure <br />that this plan tries to meet all aspects of both the public’s concern, as well as the concerns of the <br />applicant and Kamehameha Schools, as far as preservation of cultural and historic sites and safety for <br />the children. <br /> <br />UNGER: Okay, thank you. So the interim plan that was discussed is already being determined, so <br />that is going to be it up to the and through the demolition of the hotel, and then after that a more <br />permanent, a permanent access will be --. <br /> <br />DARROW: Correct. <br /> <br />UNGER: -- determined. <br /> <br />DARROW: The interim plan will need to be submitted prior to the commencement of the demolition <br />activities for the outside of the hotel; so it hasn’t been submitted as of this time. <br /> <br />3 <br />EXHIBIT A <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.